William Rasdorf

Dr. William Rasdorf


Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2012 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PLPhil Lewis
Phil Lewis
MLMichael Leming
Michael Leming
WRWilliam Rasdorf
William Rasdorf
It is difficult to quantitatively assess the impact of engine idling on fuel use and emissions of construction equipment because of a lack of sufficient data. This paper presents a methodology for evaluating the impact of idling on fuel use and carbon dioxide ( CO2 ) emissions of diesel construction equipment. The results are based on field data collected from 34 items of equipment. Engine idle time may be quantified in terms of equipment operational efficiency ( η ), which is defined as the ratio of nonidle time to total equipment use time (nonidle time plus idle time). Using η and the ratio of idle to nonidle fuel use and CO2 emission rates ( r ), the percentage increase in the total quantities of fuel used and CO2 emitted ( NE ) were calculated for each item of equipment for values of η less than the maximum theoretical operational efficiency of 100%. Results showed that as η decreased (or idle time increased), NE increased. A mathematical model that uses η as a predictor variable was developed to esti...

1 July 2016 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
SVStephanie C. Vereen
Stephanie C. Vereen
WRWilliam Rasdorf
William Rasdorf
JHJoseph E. Hummer
Joseph E. Hummer
Construction industry labor productivity is an important metric that provides feedback about industry level trends and improvements. However, labor productivity for the construction industry has historically been elusive to define and determine both qualitatively and quantitatively. Existing research studies have provided different methods to calculate productivity at a variety of levels (activity, project, industry), but none proved universally satisfying. This paper presents a new metric for quantifying productivity that was developed using RSMeans Building Construction Cost Data, which is a source that is reliable, repeatable, and developed from consistent and accurate data sources. The metric was developed using labor and cost information from a sample of typical construction activities. The study results showed a slightly sporadic, but consistent productivity decline in both output per labor hour and per dollar cost from 1990 through 2008. Other metrics were selected from existing research st...

22 August 2022 in Remote Sensing
Verified
Journal Article
Open access
PDF file
YLYajie Liu
Yajie Liu
Kevin HanKevin Han
Kevin Han
WRWilliam Rasdorf
William Rasdorf
Recent advances in computer vision and camera-equipped unmanned aerial systems (UAS) for 3D modeling enable UAS-based photogrammetry surveys with high spatial-temporal resolutions. To generate consistent and high-quality 3D models using UASs, understanding how influence factors (i.e., flight height, image overlap, etc.) affect the 3D modeling accuracy and their levels of significance are important. However, there is little to no quantitative analysis that studies how these influence factors interact with and affect the accuracy when changing the values of the influence factors. Moreover, there is little to no research that assesses more than three influence factors. Therefore, to fill this gap, this paper aims to evaluate and predict the accuracy generated by different flight combinations. This paper presents a study that (1) assessed the significance levels of five influence factors (flight height, average image quality, image overlap, ground control point (GCP) quantity, and camera focal lengths), (2) investigated how they interact and impact 3D modeling accuracy using the multiple regression (MR) method, and (3) used the developed MR models for predicting horizontal and vertical accuracies. To build the MR model, 160 datasets were created from 40 flight missions collected at a site with a facility and open terrain. For validating the prediction model, five testing datasets were collected and used at a larger site with a complex building and open terrain. The results show that the findings of this study can be applied to surveyors’ better design flight configurations that result in the highest accuracies, given different site conditions and constraints. The results also provide a reasonable prediction of accuracy given different flight configurations.

1 March 2012 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
WRWilliam Rasdorf
William Rasdorf
DFDaniel J. Findley
Daniel J. Findley
CZCharles V. Zegeer
Charles V. Zegeer
CSCarl A. Sundstrom
Carl A. Sundstrom
JHJoseph E. Hummer
Joseph E. Hummer
Applications that use a geographic information system (GIS) are common and useful in the field of transportation. Horizontal curves are critical components on a roadway in their role as a transition between straight segments and in their potential as a safety hazard to motorists. Therefore, determining the characteristics of curves [both spatial (including location, length, radius) and nonspatial (including traffic volume, signage, pavement type)] is an important task. GIS applications have been developed for evaluating roadway alignments in general and some have focused on horizontal curve assessment. This paper reports on two benchmarking efforts. The first assessed and established the accuracy of three publicly available GIS applications for determining curve spatial characteristics. The second assessed the quality of available GIS roadway line work. The three GIS applications were evaluated for performance accuracy on the basis of a comparison with precisely drawn curves [with radii ranging from 30.5 ...

1 September 2013 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
DHDonna A. Hollar
Donna A. Hollar
WRWilliam Rasdorf
William Rasdorf
Min LiuMin Liu
Min Liu
JHJoseph E. Hummer
Joseph E. Hummer
IAIngrid Arocho
Ingrid Arocho
SHSimon M. Hsiang
Simon M. Hsiang
This paper addresses one of the costs of new bridges, i.e., the cost of doing the preliminary engineering (PE). This particular aspect of cost has largely been neglected because of the difficulty in obtaining appropriate data. Typically, PE costs are determined as a percentage of construction costs, disregarding other project-specific parameters. Bridge projects let by the North Carolina (NC) DOT between 2001 and 2009 were reviewed. From an analysis of these 461 projects, the writers developed statistical models linking variation in PE costs with distinctive project parameters. The primary contribution this paper makes to the body of knowledge is the finding that PE cost estimates for bridge projects are commonly and significantly underestimated. The writers found that bridge projects exhibited a mean PE cost ratio of 28%. This result is significantly greater than the percentage used in practice. An investigation of data sources related to bridge projects, a description of regression techniques applied to predict the PE cost of such projects, and an assessment of the predictive performance of models are addressed in this paper. New knowledge contributions include identification of key factors affecting the PE costs of bridges, illustration of how those key factors enabled us to predict PE costs of future projects, and discussion of the data collection problems that hindered model development. The writers’ PE cost analyses and predictive modeling effort relate to infrastructure funding issues. All of the parties involved in infrastructure construction, from legislators to contractors, must understand costs and have confidence in the cost estimates developed to ensure efficient and effective funding of infrastructure projects. This paper on bridge PE costs addresses one component of infrastructure funding.

1 March 2017 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PLPhil Lewis
Phil Lewis
WRWilliam Rasdorf
William Rasdorf
The purpose of this paper is to present a taxonomy of fuel use and pollutant emissions rates for heavy duty diesel (HDD) equipment to assist equipment managers in estimating the energy and environmental effects of their fleets. Diesel fuel is the primary energy source for HDD equipment. Without it, the equipment is inoperable and nonproductive. Estimating fuel requirements can be extremely difficult because of high variability in published fuel consumption rates. Moreover, equipment publications provide no insight into pollutant emissions rates. The taxonomy was based on real-world fuel consumption and emissions data collected from in-use equipment. An engine modal analysis was conducted on the data to categorize it by engine load. Weighted average fuel use and pollutant emissions rates were calculated based on the results of the engine modal analysis. The taxonomy presents weighted average fuel use and emissions rates according to equipment type; Environmental Protection Agency (EPA) engine-tier ...