Qian Feng

Dr. Qian Feng

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 September 2025 in Sensors and Actuators A: Physical
Verified
Journal Article
Closed access
RPRuoyan Pan
Ruoyan Pan
FCFanghao Chen
Fanghao Chen
QFQian Feng
Qian Feng
QZQiang Zeng
Qiang Zeng
ZZZhicheng Zhang
Zhicheng Zhang
RXRongqiao Xu
Rongqiao Xu

1 October 2021 in Journal of Composites for Construction
Verified
Journal Article
Closed access
PDF file
XHXin-Kai Hao
Xin-Kai Hao
QFQian Feng
Qian Feng
JZJian-Jun Zheng
Jian-Jun Zheng
Confinement reinforcement, such as tubes, stirrups, and wraps, can significantly improve the strength and, more importantly, ductility of eccentrically loaded concrete prisms. However, the confinement effect in flexural analyses is sometimes not considered in design codes because there is no simple approach for quantifying it. Although the finite-element method has been proposed to analyze laterally confined concrete prisms under eccentric loads, the complicated computational program may hinder its wide applications. In this paper, based on fundamental partial-interaction shear-friction and bond–slip material properties, a passive stress–strain model of concrete with the confinement effect is introduced and reduced to a rectangular stress block. A closed-form solution is then derived for the ductility of fiber-reinforced polymer (FRP)-wrapped concrete prisms under eccentric loads. The main advantage of the solution is that the size effect is considered and no structural tests are required. After the validity of the solution is verified with experimental results, a parametric study is conducted to quantify the effects of various key factors on the ductility of FRP-wrapped concrete prisms under eccentric loads.

10 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
TWTianyu Wang
Tianyu Wang
JCJinbiao Cai
Jinbiao Cai
QFQian Feng
Qian Feng
WJWeizhong Jia
Weizhong Jia
YHYongchao He
Yongchao He
Large-span precast prestressed concrete box girders have been widely used in bridge construction near or across the sea. However, this would easily lead to a hydration heat problem, including large initial tensile stress and concrete cracks during the stage of concrete pouring. A 5 m long segment of the prestressed concrete box girder for the Hangzhou Bay Cross-Sea Railway Bridge was continuously monitored to investigate the hydration heat effect on the long-span concrete box girder during the pouring stage of construction. The initial temperature variation and stress distribution of the concrete in the segment were analyzed through finite element analysis based on the experimental data and temperature monitoring results. A suitable concrete pouring and maintenance plan for the box girder was proposed after the comparison of several construction schemes. The results indicate that the primary cause of initial tensile stress is the temperature difference between the inner and outer surfaces of the long-span precast concrete box girder. By adding some ventilation inside the box girder with suitable maintenance measures, the initial tensile stress in the concrete can be effectively reduced, thus mitigating the risk of early cracking.

24 August 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
FWFeng Wen
Feng Wen
XLXu Liang
Xu Liang
CCChunlei Chen
Chunlei Chen
LXLinghua Xu
Linghua Xu
QFQian Feng
Qian Feng
The large-segment hoisting construction technology for bridges is increasingly widely used due to its flexibility and efficiency, although it also poses challenges to construction monitoring. Traditional monitoring technology is unitary with low data processing efficiency, making it difficult to meet the accuracy requirements of large-segment hoisting. The application of digital technology has brought about an opportunity for innovation in bridge construction monitoring technology. To address existing challenges and explore digital applications, this paper takes the integral hoisting construction control of the large-segment steel box girder in a large cross-sea bridge as an example, developing an alignment, stress, and temperature monitoring scheme by taking the key points of hoisting construction control into consideration. A monitoring platform was developed, and the workflow of large-segment hoisting construction monitoring is systematically summarized from the viewpoint of practical engineering, which provides a valuable reference for achieving precise and efficient construction monitoring and control in similar projects.

9 August 2025 in Engineering Applications of Artificial Intelligence
Verified
Journal Article
Closed access
JLJunbin Lou
Junbin Lou
YLYixuan Li
Yixuan Li
SZShicheng Zheng
Shicheng Zheng
QFQian Feng
Qian Feng
GWGuannan Wang
Guannan Wang
Xudong QianXudong Qian
Xudong Qian

3 February 2024 in Buildings
Verified
Journal Article
Open access
PDF file
WHWei Hu
Wei Hu
ZZZhongyong Zhang
Zhongyong Zhang
JSJunwei Shi
Junwei Shi
YCYulun Chen
Yulun Chen
YLYixuan Li
Yixuan Li
QFQian Feng
Qian Feng
Bridges often improve the visual appeal of urban landscapes by incorporating curve elements to create iconic forms. However, it is noteworthy that curved bridges have unique mechanical properties under loads compared to straight bridges. This study analyzes a spatial three-curved steel box girder bridge based on an actual engineering case with a complex configuration. Initially, the finite element software Midas/Civil 2021 is utilized to establish a beam element model and a plate element model to examine the structural responses under dead loads in detail. Then, two different temperature gradient distribution models are employed for the temperature effect analysis. The backpropagation neural network (BPNN) optimized by the WOA algorithm is trained as a surrogate model for finite element models based on the results of temperature stress simulation. The results reveal that the bending–torsion coupling effect in the second span of the spatial three-curved steel box girder bridge is pronounced, with the maximum torque reaching 40% of the bending moment. The uneven distribution of cross-section stress is particularly significant at the vertices, where the shear lag coefficient exceeds 3. Under the action of temperature gradients, the bridge displays a warped stress state; the stress results obtained from the exponential model exhibit a 21% increase compared to BS-5400. Optimization of the weights by the WOA algorithm results in a significant improvement in prediction accuracy, and the convergence speed is improved by 30%. The coefficient of determination (R2) for predicting temperature stress can reach as high as 0.99.