David V Neuffer

Dr. David V Neuffer

orcid

Research Focus & Metrics

Academic Career Length

31Years (1996-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 September 2023 in The European Physical Journal C
Verified
Journal Article
Open access
PDF file
ACAccettura Carlotta
Accettura Carlotta
DADean Adams
Dean Adams
RARohit Agarwal
Rohit Agarwal
CAClaudia Ahdida
Claudia Ahdida
CAChiara Aimè
Chiara Aimè
JZJose Zurita
Jose Zurita
A muon collider would enable the big jump ahead in energy reach that is needed for a fruitful exploration of fundamental interactions. The challenges of producing muon collisions at high luminosity and 10 TeV centre of mass energy are being investigated by the recently-formed International Muon Collider Collaboration. This Review summarises the status and the recent advances on muon colliders design, physics and detector studies. The aim is to provide a global perspective of the field and to outline directions for future work.

1 October 2018 in Journal of Instrumentation
Verified
Journal Article
Closed access
PDF file
DNDavid V Neuffer
David V Neuffer
VSV. Shiltsev
V. Shiltsev

15 January 2024 in The European Physical Journal C
Verified
Journal Article
Open access
PDF file
ACAccettura Carlotta
Accettura Carlotta
DADean Adams
Dean Adams
RARohit Agarwal
Rohit Agarwal
CAClaudia Ahdida
Claudia Ahdida
CAChiara Aimè
Chiara Aimè
JZJose Zurita
Jose Zurita

2 July 2020 in Physical Review Accelerators and Beams
Verified
Journal Article
Open access
PDF file
DBD. Bowring
D. Bowring
ABA. Bross
A. Bross
PLP. Lane
P. Lane
MLM. Leonova
M. Leonova
AMA. Moretti
A. Moretti
MPM. Palmer
M. Palmer
Ionization cooling is the preferred method for producing bright muon beams. This cooling technique requires the operation of normal conducting, radio-frequency (rf) accelerating cavities within the multi-tesla fields of dc solenoid magnets. Under these conditions, cavities exhibit increased susceptibility to rf breakdown, which can damage cooling channel components and imposes limits on channel length and transmission efficiency. We report, for the first time, stable high-vacuum, normal-conducting cavity operation at gradients of 50  MV/m in an external magnetic field of three tesla, through the use of beryllium cavity elements. This eliminates a significant technical risk that has previously been inherent in ionization cooling channel designs.

1 July 2017 in Journal of Instrumentation
Verified
Journal Article
Closed access
PDF file
DNDavid V Neuffer
David V Neuffer
HSH. Sayed
H. Sayed
JAJ. Acosta
J. Acosta
THT. Hart
T. Hart
DSD. Summers
D. Summers
A high-energy muon collider requires a "final cooling" system that reduces transverse emittance by a factor of ~ 10, while allowing the longitudinal emittance to increase. The baseline approach has low-energy transverse cooling within high-field solenoids, with strong longitudinal heating. This approach and its recent simulation are discussed. Alternative approaches, which more explicitly include emittance exchange are also presented. Round-to-flat beam transform, transverse slicing, and longitudinal bunch coalescence are possible components of an alternative approach. Wedge-based emittance exchange could provide much of the required transverse cooling with longitudinal heating. Li-lens and quadrupole focusing systems could also provide much of the required final cooling.

10 June 2021
Verified
Report
Closed access
PDF file
RARobert Ainsworth
Robert Ainsworth
JDJishnu Dey
Jishnu Dey
JEJeffrey S. Eldred
Jeffrey S. Eldred
RHRoni Harnik
Roni Harnik
JJJonathan D. Jarvis
Jonathan D. Jarvis
RZRobert Miles Zwaska
Robert Miles Zwaska
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.