Megaproject construction endeavors and technological innovation activities, led by industry–university–research (IUR) collaboration, demonstrate marked disparities in value orientations, implementing entities, and constituent components. These discrepancies lead to a mismatch between innovation demands and actual activities, as well as insufficient innovation motivation among construction entities, subsequently impacting innovation effectiveness and the commercialization of outcomes and failing to adequately support engineering construction needs. In response to this predicament, the academic community widely acknowledges IUR collaborative innovation as a solution. This research integrates fundamental theoretical analysis with a multi-case study approach and systematically dissects the distinctive features at the micro, meso, and macro levels, grounded in the collaborative innovation practices of IUR in three iconic railway engineering projects in China. Subsequently, it unravels the inherent operational mechanics of the IUR collaborative innovation system within large-scale projects. Specifically, at the micro level, the profound engagement of governments and project owners fosters a solid supportive environment and collaborative platform for IUR collaboration, while past successful cooperation experiences among key innovation entities enhance their technological and knowledge interactions. At the meso level, shared industry cognitions and values, hierarchical organizational structures, flexible institutional designs, and resource allocation strategies based on balancing risks and benefits collectively constitute the supporting system for megaproject collaborative innovation. At the macro level, the tight integration of the innovation chain and industrial chain promotes the formation of an open cooperation ecosystem, ensuring the continuity and systematic nature of innovation activities and accelerating the rapid commercialization and efficient utilization of innovation outcomes. This study not only enriches the theoretical connotations of IUR collaborative innovation in the context of major engineering projects but also provides theoretical foundations for strategy formulation and management practices for major project managers, holding significant value in guiding the innovation management of future major engineering projects.
With mega railway construction projects (MRCPs) facing various natural disasters and extremely difficult engineering construction tasks, there is an urgent need to improve the resilience management capability of engineering construction to cope with complex and changing internal and external risks. As a key element of the construction management system, the level of institutional resilience directly determines the adaptability of the construction system in the face of crisis. However, the research on the influencing factors and the formation mechanism of institutional resilience is slightly insufficient. Therefore, this paper defines the connotation of institutional resilience in MRCPs on the basis of existing research. Secondly, it codes authoritative journals and expert interview reports related to MRCPs in China by applying a rooting theory. Finally, the paper analyses the formation mechanism of institutional resilience based on an Interpretative Structural Modeling and proposes strategies to enhance it. The results show that the institutional environment is the fundamental influencing factor, institutional implementation, institutional supervision, institutional guarantee and institutional feedback are the direct influencing factors, and institutional stakeholders and institutional design are indirect influencing factors. The mechanism of interaction between the institution and the institutional environment, the mechanism of interaction between the institution and the institutional stakeholders, the mechanism of generation of institutional rules and the mechanism of operation of institutional rules work together to generate institutional resilience. This paper, as an exploratory study on institutional resilience in the field of engineering management, has sorted out the ideas for the subsequent research on institutional resilience in this field and provided the directions for project managers of MRCPs to improve their institutional systems.
The construction of major railway projects poses significant risks, which present considerable challenges to construction management. To accurately assess the level of construction management for these projects, this study incorporated resilience theory into the field. The grounded theory method was utilized to establish a resilience evaluation indicator system for managing a major railway project construction. Additionally, a resilience evaluation model based on the Analytic Hierarchy Process (AHP) and fuzzy comprehensive evaluation method was proposed. This model was applied to evaluate the construction management resilience of a major railway project located in the mountainous region of southwest China. The results indicated that the project exhibits a very high overall level of construction management resilience. Specifically, it demonstrates high levels of ability to monitor and warn, an ability to resist absorption, and an ability to respond to emergencies. Additionally, it showcases high levels of ability to recover and rebuild, and an ability to learn to adapt. The evaluation results were consistent with the actual situation and verified the correctness and reliability of the method. Based on the aforementioned research findings, this paper puts forward recommendations on material redundancy and resource security from a resource perspective, and suggestions on organizational optimization and personnel capacity improvement from a subject perspective, thus indicating directions for enhancing the management level of major engineering railway constructions.
Under China’s modern development concept, it is necessary to promote the application of electric equipment to improve the construction environment of high-altitude railway tunnels and to address the efficiency reduction in high-altitude construction of traditional fuel oil equipment. Based on the analysis of the development status of electric equipment for tunneling projects in China, a tripartite evolutionary game approach is used to establish the game payment matrix of the government, equipment manufacturers, and construction units. The impact of the relevant parameters on the tripartite strategy is investigated based on numerical simulations. It has been shown that in the early stages of popularization and application, the government should actively regulate and control, and in the later stages of popularization and application, the government should play a leading role in market mechanisms. Evolutionary stability strategies are affected by the brand revenue that manufacturers earn through technological innovation on electric equipment and the additional research and development costs that need to be paid. The conclusions of this study can help provide a reference for the promotion and application strategy of electric equipment in China’s plateau railway tunnels.
Current technological innovation in mega projects faces the problem of mismatch between supply and demand, where technology demand-side entities struggle to translate engineering problems into precise scientific research language, while technology supply-side entities fail to capture authentic scenario parameters from engineering sites. This study employs an evolutionary game model to thoroughly investigate behavioral interaction processes among governance entities, demand-side entities, and intermediary collaborative innovation platforms during technological innovation supply–demand matching. By constructing and deriving a tripartite evolutionary game model, this research analyzes the impacts of initial states, the matching effort coefficient, the innovation risk coefficient, and other factors on the evolution of scientific technological innovation supply–demand matching. Additionally, this study simulates the dynamic evolutionary processes of strategic selection. The findings reveal that the initial states of the three parties do not influence behavioral evolution. Furthermore, the subsidy coefficient, additional benefits, and risk coefficient emerge as the most significant parameters affecting tripartite strategy selection. The research outcomes and managerial implications provide crucial reference value for enhancing the alignment between scientific research supply and demand in mega projects, thereby promoting the transformation of scientific and technological achievements in major railway engineering projects.
GH3128, which is one of the domestic Ni-base super alloy, shows good performances under high temperature. Preliminary research has shown that this alloy is promising as structural material for Intermediate Heat Exchangers (IHX), which are the key components of Very High Temperature Reactor (VHTR). In this paper, the tensile properties of GH3128 are tested by the uniaxial tension experiments, and then the fractographic evaluation is conducted by using the scanning electron microscope (SEM). In the paper, the variation tendency of tensile strengths of GH3128 as well as plasticity is described along with the variation of temperature. The results also show that the tension fracture mode will gradually transform from ductile fracture to cleavage-intergranular compound fracture with the increasing of temperature, and the transition of fracture mechanism corresponds well with the variation of alloy plasticity.