During the development process of complex products, selecting the best desirable alternative supplier is a challenge since an improperly selected alternative may cause losing capacity and increasing the cycle time and cost of development for a company. For this multiple-attribute decision-making problem of supplier selection, in this paper, a supplier selection problem in which the decision data are hesitant fuzzy information and the attribute weight is unknown in complex product development is investigated, and a supplier selection decision-making approach based on hesitant fuzzy information is proposed. Firstly, a bidirectional projection based on hesitant fuzzy information is established, and then the measurement equation for the degree of closeness is improved. Further, an attribute weight determination model which minimizes the projection total deviation for the hesitant fuzzy elements is constructed. By solving this model, scientific and reasonable attribute weights are provided. Subsequently, an illustrative example is employed to not only give the ranking result of alternative suppliers but also demonstrate the validity and feasibility of the developed approach. Meanwhile, sensitivity analysis and comparative analysis are put forward to illustrate the stability of the given final ranking result and the advantages and reliability of the constructed method. For alternative or strategy selection, this proposed approach can be used as a decision-making means when uncertainties are inherent.
Air pollution causes significant negative impacts on climate, environment and human health. Monitoring and forecasting the PM2.5, one of the most dangerous pollutant, are crucial. However, the strong prediction uncertainty in peak periods can potentially increase the prediction error and decrease the model reliability. To overcome this problem, prediction intervals are needed to quantify the uncertainty and provide information of the confidence in the prediction. In this article, an improved cloud-NARX estimation algorithm is developed to quantify the uncertainty and produce prediction intervals. The proposed method integrates a new recursive estimation procedure and two new criteria, which significantly improve the training speed and prediction interval accuracy. The proposed method is applied to predict PM2.5 for one hour ahead. From our results, the proposed method achieves higher accuracies of both average predictions and prediction intervals than other methods. This study provides a novel framework for quantifying the uncertainty of time series prediction, and to improve the model robustness.