Gábor Cseh

Dr. Gábor Cseh

Fusion Plasma Physics, Centre for Energy Research, Budapest, Hungary
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 June 2017 in Nuclear Fusion
Verified
Journal Article
Open access
PDF file
XLX. Litaudon
X. Litaudon
SAS. Abduallev
S. Abduallev
MAM. Abhangi
M. Abhangi
PAP. Abreu
P. Abreu
MAM. Afzal
M. Afzal
JCJet Contributors
Jet Contributors

27 July 2017 in Nuclear Fusion
Verified
Journal Article
Open access
PDF file
RWRobert Wolf
Robert Wolf
AAA. Ali
A. Ali
AAA. Alonso
A. Alonso
JBJ. Baldzuhn
J. Baldzuhn
CBC. Beidler
C. Beidler
Matteo ZuinMatteo Zuin
Matteo Zuin

30 August 2019 in Nuclear Fusion
Verified
Journal Article
Open access
PDF file
EJE. Joffrin
E. Joffrin
SAS. Abduallev
S. Abduallev
MAM. Abhangi
M. Abhangi
PAP. Abreu
P. Abreu
VAV. Afanasev
V. Afanasev
IZI. Zychor
I. Zychor
For the past several years, the JET scientific programme (Pamela et al 2007 Fusion Eng. Des. 82 590) has been engaged in a multi-campaign effort, including experiments in D, H and T, leading up to 2020 and the first experiments with 50%/50% D–T mixtures since 1997 and the first ever D–T plasmas with the ITER mix of plasma-facing component materials. For this purpose, a concerted physics and technology programme was launched with a view to prepare the D–T campaign (DTE2). This paper addresses the key elements developed by the JET programme directly contributing to the D–T preparation. This intense preparation includes the review of the physics basis for the D–T operational scenarios, including the fusion power predictions through first principle and integrated modelling, and the impact of isotopes in the operation and physics of D–T plasmas (thermal and particle transport, high confinement mode (H-mode) access, Be and W erosion, fuel recovery, etc). This effort also requires improving several aspects of plasma operation for DTE2, such as real time control schemes, heat load control, disruption avoidance and a mitigation system (including the installation of a new shattered pellet injector), novel ion cyclotron resonance heating schemes (such as the three-ions scheme), new diagnostics (neutron camera and spectrometer, active Alfvèn eigenmode antennas, neutral gauges, radiation hard imaging systems…) and the calibration of the JET neutron diagnostics at 14 MeV for accurate fusion power measurement. The active preparation of JET for the 2020 D–T campaign provides an incomparable source of information and a basis for the future D–T operation of ITER, and it is also foreseen that a large number of key physics issues will be addressed in support of burning plasmas.

7 February 2019 in Nuclear Fusion
Verified
Journal Article
Closed access
PDF file
BGBenedikt Geiger
Benedikt Geiger
TWThomas Wegner
Thomas Wegner
CBCraig D Beidler
Craig D Beidler
RBRainer Burhenn
Rainer Burhenn
BBBirger Buttenschön
Birger Buttenschön
TTthe W7-X team
the W7-X team

1 August 2021 in Physics of Plasmas
Verified
Journal Article
Closed access
PDF file
RLR. Lunsford
R. Lunsford
CKC. Killer
C. Killer
ANA. Nagy
A. Nagy
DGDavid A. Gates
David A. Gates
TKT. Klinger
T. Klinger
WTW7-X Team
W7-X Team
Pulsed injections of boron carbide granules into Wendelstein 7-X stellarator (W7-X) plasmas transiently increase the plasma stored energy and core ion temperatures above the reference W7-X experimental programs by up to 30%. In a series of 4 MW electron cyclotron resonance heating experiments, the PPPL Probe Mounted Powder Injector provided 50 ms bursts of 100 μm granules every 350 ms at estimated quantities ranging from approximately 1 mg/pulse to over 30 mg/pulse. For each injection, the stored energy was observed to initially drop and the radiated power transiently increased, while the radial electron density profile rose at the edge as material was assimilated. Once the injected boron carbide was fully absorbed, the density rise transitioned to the core while the stored energy increased above the previous baseline level by an amount linearly correlated with the injection quantity. During the injection, the ion temperature gradient steepened with peak core ion temperatures observed to increase from a nominal 1.7 keV to over 2.6 keV for the largest injection amounts. Enhanced performance is accompanied by a reversal of the radial electric field at ρ < 0.3, indicating that the core transport has switched to the ion root. These observations are suggestive of a change in transport and provide further evidence that externally induced profile modifications provide a possible path to enhanced W7-X performance metrics.

27 October 2016 in Review of Scientific Instruments
Verified
Journal Article
Closed access
PDF file
MKM. Krychowiak
M. Krychowiak
AAA. Adnan
A. Adnan
AAA. Alonso
A. Alonso
TAT. Andreeva
T. Andreeva
JBJ. Baldzuhn
J. Baldzuhn
WTW7-X Team
W7-X Team
Wendelstein 7-X, a superconducting optimized stellarator built in Greifswald/Germany, started its first plasmas with the last closed flux surface (LCFS) defined by 5 uncooled graphite limiters in December 2015. At the end of the 10 weeks long experimental campaign (OP1.1) more than 20 independent diagnostic systems were in operation, allowing detailed studies of many interesting plasma phenomena. For example, fast neutral gas manometers supported by video cameras (including one fast-frame camera with frame rates of tens of kHz) as well as visible cameras with different interference filters, with field of views covering all ten half-modules of the stellarator, discovered a MARFE-like radiation zone on the inboard side of machine module 4. This structure is presumably triggered by an inadvertent plasma-wall interaction in module 4 resulting in a high impurity influx that terminates some discharges by radiation cooling. The main plasma parameters achieved in OP1.1 exceeded predicted values in discharges of a length reaching 6 s. Although OP1.1 is characterized by short pulses, many of the diagnostics are already designed for quasi-steady state operation of 30 min discharges heated at 10 MW of ECRH. An overview of diagnostic performance for OP1.1 is given, including some highlights from the physics campaigns.