Withit Pansuk

Prof. Dr. Withit Pansuk

orcid

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 December 2022 in Sensors
Verified
Journal Article
Open access
PDF file
Sakdirat KaewunruenSakdirat Kaewunruen
Sakdirat Kaewunruen
MAMohannad AbdelHadi
Mohannad AbdelHadi
Manwika KongpuangManwika Kongpuang
Manwika Kongpuang
Withit PansukWithit Pansuk
Withit Pansuk
ARAlex M. Remennikov
Alex M. Remennikov
Innovative digital twins (DTs) that allow engineers to visualise, share information, and monitor the condition during operation is necessary to optimise railway construction and maintenance. Building Information Modelling (BIM) is an approach for creating and managing an inventive 3D model simulating digital information that is useful to project management, monitoring and operation of a specific asset during the whole life cycle assessment (LCA). BIM application can help to provide an efficient cost management and time schedule and reduce the project delivery time throughout the whole life cycle of the project. In this study, an innovative DT has been developed using BIM integration through a life cycle analysis. Minnamurra Railway Bridge (MRB), Australia, has been chosen as a real-world use case to demonstrate the extended application of BIM (i.e., the DT) to enhance the operation, maintenance and asset management to improve the sustainability and resilience of the railway bridge. Moreover, the DT has been exploited to determine GHG emissions and cost consumption through the integration of BIM. This study demonstrates the feasibility of DT technology for railway maintenance and resilience optimisation. It also generates a virtual collaboration for co-simulations and co-creation of values across stakeholders participating in construction, operation and maintenance, and enhancing a reduction in costs and GHG emission.

7 December 2022 in Structures
Verified
Journal Article
Closed access
MSM.S. Sandeep
M.S. Sandeep
KTKoravith Tiprak
Koravith Tiprak
Sakdirat KaewunruenSakdirat Kaewunruen
Sakdirat Kaewunruen
PPPhoonsak Pheinsusom
Phoonsak Pheinsusom
Withit PansukWithit Pansuk
Withit Pansuk

1 March 2021 in Construction and Building Materials
Verified
Journal Article
Closed access
TDTotsawat Daungwilailuk
Totsawat Daungwilailuk
PPPhoonsak Pheinsusom
Phoonsak Pheinsusom
Withit PansukWithit Pansuk
Withit Pansuk

1 December 2017 in Construction and Building Materials
Verified
Journal Article
Closed access
Withit PansukWithit Pansuk
Withit Pansuk
TNThuc N. Nguyen
Thuc N. Nguyen
YSYasushiko Sato
Yasushiko Sato
JUJ.A. Den Uijl
J.A. Den Uijl
JWJ.C. Walraven
J.C. Walraven

16 February 2018 in Structure and Infrastructure Engineering
Verified
Journal Article
Closed access
TYThanapol Yanweerasak
Thanapol Yanweerasak
Withit PansukWithit Pansuk
Withit Pansuk
MAMitsuyoshi Akiyama
Mitsuyoshi Akiyama
DFDan M. Frangopol
Dan M. Frangopol
This paper proposes a novel probabilistic methodology for estimating the life-cycle reliability of existing reinforced concrete (RC) bridges under multiple hazards. The life-cycle reliability of an RC bridge pier under seismic and airborne chloride hazards is compared to that of a bridge girder under traffic and airborne chloride hazards. When conducting a life-cycle reliability assessment of existing RC bridges, observational data from inspections can provide the corrosion level in reinforcement steel. Random variables related with the prediction of time-variant steel weight loss can be updated based on the inspection results using Sequential Monte Carlo Simulation (SMCS). This paper presents a novel procedure for identifying the hazards that most threaten the structural safety of existing RC bridges, as well as the structural components with the lowest reliability when these bridges are exposed to multiple hazards. The proposed approach, using inspection results associated with steel weight loss, provides a rational reliability assessment framework that allows comparison between the life-cycle reliabilities of bridge components under multiple hazards, helping the prioritisation of maintenance actions. The effect of the number of inspection locations on the updated reliability is considered by incorporating the spatial steel corrosion distribution. An illustrative example is provided of applying the proposed life-cyle reliability assessment to a hypothetical RC bridge under multiple hazards.

1 January 2017 in Engineering Structures
Verified
Journal Article
Closed access
TNThuc N. Nguyen
Thuc N. Nguyen
TNTung T. Nguyen
Tung T. Nguyen
Withit PansukWithit Pansuk
Withit Pansuk