Carles Sitompul

Dr. Carles Sitompul

orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2010 in Computers & Operations Research
Verified
Journal Article
Closed access
EAEl-Houssaine Aghezzaf
El-Houssaine Aghezzaf
CSCarles Sitompul
Carles Sitompul
NNNajib M. Najid
Najib M. Najid

18 July 2008 in International Journal of Production Research
Verified
Journal Article
Closed access
CSCarles Sitompul
Carles Sitompul
EAEl-Houssaine Aghezzaf
El-Houssaine Aghezzaf
WDWout Dullaert
Wout Dullaert
HLHendrik Van Landeghem
Hendrik Van Landeghem
Today's highly competitive business environment forces supply chain managers to maintain high service levels while keeping inventory-related costs as low as possible. Therefore, placing the right amount of safety stock at the right places in the supply chain is an important aspect of effective inventory management. This safety stock placement problem, for which some solution strategies have been proposed in the case of uncapacitated supply chains, becomes much more complicated when, in addition to the variability of the demand, capacity constraints also come into play. In this paper we propose a model to locate safety stocks in a capacitated supply chain with the objective of maintaining the required service level. The underlying relationships linking excess capacity, demand variability, and service levels are analysed to gain deeper understanding of the safety stock placement problem in capacitated supply chains. Based on these relationships a solution approach for the problem is proposed and is tested with Monte Carlo simulation.

1 March 2011 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
EAEl-Houssaine Aghezzaf
El-Houssaine Aghezzaf
CSCarles Sitompul
Carles Sitompul
FBFrank Van Den Broecke
Frank Van Den Broecke

16 August 2011 in Journal of Quality in Maintenance Engineering
Verified
Journal Article
Closed access
CSCarles Sitompul
Carles Sitompul
EAEl‐Houssaine Aghezzaf
El‐Houssaine Aghezzaf
Purpose: The purpose of this study is to propose and formulate an integrated hierarchical production, and maintenance‐planning model.Design/methodology/approach: The proposed model is formulated mathematically and tested for some hypothetical cases. A two‐level planning is proposed to address the hierarchical planning problem, i.e. aggregate planning and detailed planning. A preventive maintenance planning is integrated into the aggregate planning, while machine breakdowns, which require corrective maintenance actions, are investigated in the detailed planning. The proposed general preventive maintenance model is tested against cyclical preventive maintenance models for some cases, and for evaluating the performance of the models, in terms of costs, and service levels.Findings: The proposed general preventive maintenance model gives a better solution in terms of cost than the cyclical maintenance model (i.e. 6 per cent less costly), if the maintenance planning is executed separately from the production planning. In terms of service level, however, both models perform equally well with average service levels equal to 97.6 per cent. The effect of tight capacity, long maintenance duration, and small machine parameters similarly tightens the capacity. In these cases, it is shown that a stable level of capacity is more beneficial to achieve a better service level, which is gained if the preventive maintenance actions are carried out monthly.Practical implications: At the aggregate level, the proposed preventive maintenance model considers a non‐cyclical planning, which means that the preventive maintenance periods do not necessarily fall at equally distant times. The inventory movement constraints at the aggregate level decouple machines to operate independently; hence the detailed level problem can be solved separately for each machine. In a rolling horizon approach, only the first period of the aggregate plan is implemented and disaggregated into the production of items at the detailed level.Originality/value: The paper proposes an integrated model of hierarchical production and maintenance planning. A general preventive maintenance is integrated into the aggregate planning, while machine breakdowns are investigated in the detailed planning. To the best of one's knowledge, such a hierarchical view of production planning and maintenance has not been addressed adequately.

25 November 2015 in Jurnal Rekayasa Sistem Industri
Verified
Journal Article
Open access
PDF file
CSCarles Sitompul
Carles Sitompul
)F) Fakultas
) Fakultas
TITeknologi Industri
Teknologi Industri
JIJurusan Teknik Industri
Jurusan Teknik Industri
Pertumbuhan ekonomi yang terjadi di negara tersebut. Untuk memenangkan kompetisi, perusahaanperusahaanberlomba memperbaiki kinerja mereka. Salah satu cara yang dilakukan adalahmenerapkan sistem persediaan barang yang lebih efisien yaitu dengan menerapkan manajemen supplychain yang akan memberikan keuntungan bagi pihak supplier maupun pihak retailer. VMI (VendorManaged Inventory) merupakan salah satu metode dalam supply chain yang memberikan keuntunganbagi perusahaan melalui waktu replenishment yang singkat, perbaikan customer service level, total biayarantai pasok yang lebih kecil dibanding metode persediaan tradisional. Penelitianpenelitianyang sudah dilakukan saat ini baru sebatas model VMI satu supplier dengan satu retailer. Padahalpada kenyataannya satu supplier dapat berhubungan dengan satu atau lebih retailer atau bahkansebaliknya banyak supplier yang berhubungan dengan 1 retailer. Kondisi seperti ini menyebabkanperlunya pengembangan model yang melibatkan banyak retailer maupun supplier.Dalam penelitian ini, dilakukan pengembangan model VMI yang dibatasi pada kondisi satusupplier dengan banyak retailer. Dilakukan penentuan parameter, variabel keputusan, fungsi tujuandan koefisien pembatas untuk merancang model. Model yang dirancang kemudian diimplementasikanke dalam bahasa pemrograman AMPL dan solusinya didapatkan dengan penggunaansoftware NEOS. Datadata yang digunakan merupakan data ilustrasi. Setelah didapat hasil daripengimplementasian model, selanjutnya dibuat analisis berdasarkan hasil serta analisis sensitivitasuntuk model. Hasil penggunaan model VMI (Vendor Managed Inventory) yang dirancang kemudiandibandingkan dengan hasil penggunaan metode lain, yaitu Q System serta WagnerWithin Algorithm.

1 January 2013
Verified
Book Chapter
Closed access
EAEl-Houssaine Aghezzaf
El-Houssaine Aghezzaf
CSCarles Sitompul
Carles Sitompul
In a supply chain operating under uncertainty, a possible approach to reduce the complexity and scope of the planning process is to organize all involved critical planning decisions in a hierarchical structure. This chapter attempts to explore new ways of integrating production and scheduling plans in a complex supply chain taking into account effects of some specific uncertainty types. In particular, uncertainty types inherent to the demand and to the process or equipment are considered. To deal with demand uncertainty at the strategic level, the safety stock placement problem in supply chains with limited production capacities is investigated. Results of this analysis and its consequences at the design level are reported and discussed. At the tactical level, each stage in the supply chain generates its own aggregate plans in order to balance supply and demand. To deal with uncertainty at this level, some robust deterministic planning models are discussed. These models make use only of the readily available data, such as averages and standard deviations, related to the uncertain planning parameters. At the operational level, the issue of disaggregating the generated robust tactical plans into detailed plans is investigated. A model taking into account the progressive deterioration of the production equipment is discussed. The results of some simulations are also reported and discussed.