Zhimin Chen

Zhimin Chen


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 July 2024 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
ZCZhimin Chen
Zhimin Chen
BLBaoli Liu
Baoli Liu
YLYaohui Liu
Yaohui Liu
JXJiangtao Xu
Jiangtao Xu

17 April 2023 in Buildings
Verified
Journal Article
Open access
PDF file
ZCZhimin Chen
Zhimin Chen
WYWaqar Yunas
Waqar Yunas
LSLin Shao
Lin Shao
QYQianlong Yuan
Qianlong Yuan
YZYouli Zeng
Youli Zeng
SLShimin Liu
Shimin Liu
The global community has recently increased its efforts for sustainability and environmental protection. “Green Building” and “Green Construction” are the two methods of incorporating these environmental concerns into the construction and maintenance of mega infrastructures and highways with the intention of reducing any environmental impact that the infrastructures may have on the local ecosystems and ecology. This paper delves into one such study based on the Qinghai–Jiaxi Highway, which is currently under construction in the Qinghai–Tibet Plateau, China. A water treatment method for construction-related mud and sludge is presented as a solution to prevent environmental contamination in the Qinghai–Tibet Plateau. Several tests are performed on samples collected from the Qinghai–Jiaxi Highway to check the feasibility of this method. Several tests, such as X-ray diffraction, a chemical composition analysis, pH tests, mud density, and quality assessments, are performed for this purpose. Following these tests, mud sample mixtures are strengthened with concrete, and their suitability as a filler for road bases is evaluated using compression tests, in accordance with the GB50107 standard. The test results show that the concrete blocks have a compression strength of 35 MPA, which is well within the required standards. The proposed method helps to reduce the harmful discharges from construction sites into the local ecosystems and can potentially reduce the effluent matter in the Qinghai–Tibet Plateau and Ecological Reserve.

3 July 2025 in Water, Air, & Soil Pollution
Verified
Journal Article
Closed access
PDF file
ZCZhimin Chen
Zhimin Chen
MYMingyang Yi
Mingyang Yi
MZMeng Zhang
Meng Zhang
WZWeifei Zhao
Weifei Zhao
JLJunhui Liu
Junhui Liu
WYWaqar Yunas
Waqar Yunas

1 January 2024
Verified
Conference Paper
Open access
PDF file
ZCZhimin Chen
Zhimin Chen
WZWeifei Zhao
Weifei Zhao
PZPengji Zheng
Pengji Zheng
DWDianqiang Wang
Dianqiang Wang
HLHui Long
Hui Long
HZHaoyong Zhang
Haoyong Zhang
The construction of highways consumes a large amount of energy and materials and emits a large amount of greenhouse gases into the atmosphere. In order to grasp the carbon emission law of expressways in Northwest China. By proposing the accounting method of carbon emission during the construction period of highways in Northwest China. The characteristics of carbon emissions during the construction period of highways in Northwest China and the differences with other regions were calculated and analysed based on actual cases in different regions. Sensitivity analyses were carried out on the influencing factors of carbon emissions. A prediction model of carbon emissions during the construction period of highways in Northwest China is also established.The results of the study show that: (1) That in more than 65% of the carbon emissions from the material production stage; the construction stage, land acquisition and removal stage and material transportation stage accounted for 16.52%, 12.31% and 1.96% of the whole carbon emission, respectively. (2) The carbon emission intensity of expressways in Northwest China is concentrated in the range of 15 ~ 35 t CO2eq / m. This is significantly higher than 5 ~ 30 t CO2eq / m in other regions. (3) The sensitivity analysis finds that factors such as steel reinforcement, cement, and bridge-to-tunnel ratio can significantly and sensitively influence the carbon emissions of the highway during the construction period.

31 July 2024
Verified
Book Chapter
Open access
PDF file
ZCZhimin Chen
Zhimin Chen
ZCZhimin Chen
Zhimin Chen
GZGengwang Zhang
Gengwang Zhang
ZZZheng Zhang
Zheng Zhang
Rock pile is a rock block formed by weathering of bedrock, and its stability is lower than that of other rock and soil. Therefore, there are numerous difficulties in the construction of tunnels through rock pile. In this paper, TBM method, three step method and CD method are chosen as the basis of tunnel stability analysis, and the numerical model of surrounding rock excavation stability of tunnel passing through rock pile is established. In this paper, the tunnel excavation is simulated by numerical simulation software, and the stability analysis of tunnel under different construction methods is performed. Combined with the engineering background and calculation analysis, compared with the three construction methods, it is found that the CD method has the strongest comprehensive protection for tunnel construction and is a more suitable construction method for crossing the rock pile tunnel.

1 April 2026 in Journal of Mountain Science
Verified
Journal Article
Closed access
ZCZhimin Chen
Zhimin Chen
SLShuai Lu
Shuai Lu
BLBaoli Liu
Baoli Liu
DZDongwei Zhang
Dongwei Zhang
HSHaobo Shi
Haobo Shi
YZYibo Zhang
Yibo Zhang