The global community has recently increased its efforts for sustainability and environmental protection. “Green Building” and “Green Construction” are the two methods of incorporating these environmental concerns into the construction and maintenance of mega infrastructures and highways with the intention of reducing any environmental impact that the infrastructures may have on the local ecosystems and ecology. This paper delves into one such study based on the Qinghai–Jiaxi Highway, which is currently under construction in the Qinghai–Tibet Plateau, China. A water treatment method for construction-related mud and sludge is presented as a solution to prevent environmental contamination in the Qinghai–Tibet Plateau. Several tests are performed on samples collected from the Qinghai–Jiaxi Highway to check the feasibility of this method. Several tests, such as X-ray diffraction, a chemical composition analysis, pH tests, mud density, and quality assessments, are performed for this purpose. Following these tests, mud sample mixtures are strengthened with concrete, and their suitability as a filler for road bases is evaluated using compression tests, in accordance with the GB50107 standard. The test results show that the concrete blocks have a compression strength of 35 MPA, which is well within the required standards. The proposed method helps to reduce the harmful discharges from construction sites into the local ecosystems and can potentially reduce the effluent matter in the Qinghai–Tibet Plateau and Ecological Reserve.
The construction of highways consumes a large amount of energy and materials and emits a large amount of greenhouse gases into the atmosphere. In order to grasp the carbon emission law of expressways in Northwest China. By proposing the accounting method of carbon emission during the construction period of highways in Northwest China. The characteristics of carbon emissions during the construction period of highways in Northwest China and the differences with other regions were calculated and analysed based on actual cases in different regions. Sensitivity analyses were carried out on the influencing factors of carbon emissions. A prediction model of carbon emissions during the construction period of highways in Northwest China is also established.The results of the study show that: (1) That in more than 65% of the carbon emissions from the material production stage; the construction stage, land acquisition and removal stage and material transportation stage accounted for 16.52%, 12.31% and 1.96% of the whole carbon emission, respectively. (2) The carbon emission intensity of expressways in Northwest China is concentrated in the range of 15 ~ 35 t CO2eq / m. This is significantly higher than 5 ~ 30 t CO2eq / m in other regions. (3) The sensitivity analysis finds that factors such as steel reinforcement, cement, and bridge-to-tunnel ratio can significantly and sensitively influence the carbon emissions of the highway during the construction period.
Rock pile is a rock block formed by weathering of bedrock, and its stability is lower than that of other rock and soil. Therefore, there are numerous difficulties in the construction of tunnels through rock pile. In this paper, TBM method, three step method and CD method are chosen as the basis of tunnel stability analysis, and the numerical model of surrounding rock excavation stability of tunnel passing through rock pile is established. In this paper, the tunnel excavation is simulated by numerical simulation software, and the stability analysis of tunnel under different construction methods is performed. Combined with the engineering background and calculation analysis, compared with the three construction methods, it is found that the CD method has the strongest comprehensive protection for tunnel construction and is a more suitable construction method for crossing the rock pile tunnel.