Open-pit mines are becoming more intelligent and unmanned. One of the core technologies for autonomous driving is high-definition map technology, while refined mine maps are also needed to support scenarios such as vehicle–shovel collaboration, loading and unloading, production scheduling, and traffic safety control. To better serve the construction of intelligent mines and address the autonomous driving needs in open-pit mining scenarios, a universal high-definition map data model oriented toward data production and exchange, Open-Pit Map (OP map for short), has been designed. Based on various working scenarios of open-pit mines, eight practical basic elements, eleven location elements, and eight traffic elements in OP map were proposed. A map visualization tool, MapViewer, was developed based on OP map, and the effectiveness and practicality of the data model in the practical application of an intelligent shipping system in a Chinese mine were validated.
A backfill system in underground mines supports the walls and roofs of mined-out areas and improves the structural integrity of mines. However, there has been a significant gap in the visualization and monitoring of the backfill progress. To better observe the process of the paste backfill material filling the tunnels, a LiDAR-based backfill monitoring system is proposed. As long as the rising top surface of the backfill material enters the LiDAR range, the proposed system can compute the plane coefficient of this surface. The intersection boundary of the tunnel and the backfill material can be obtained by substituting the plane coefficient into the space where the initial tunnel is located. A surface point generation and slurry point determination algorithm are proposed to obtain the point cloud of the backfill body based on the intersection boundary. After Poisson surface reconstruction and volume computation, the point cloud model is reconstructed into a 3D mesh, and the backfill progress is digitized as the ratio of the backfill body volume to the initial tunnel volume. The volumes of the meshes are compared with the results computed by two other algorithms; the error is less than 1%. The time to compute a set of data increases with the amount of data, ranging from 8 to 20 s, which is sufficient to update a set of data with a tiny increase in progress. As the digitized results update, the visualization progress is transmitted to the mining control center, allowing unexpected problems inside the tunnel to be monitored and addressed based on the messages provided by the proposed system.