Keqi Liu

Dr. Keqi Liu


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 August 2024 in Construction and Building Materials
Verified
Journal Article
Closed access
KLKeqi Liu
Keqi Liu
HPHezheng Pei
Hezheng Pei
XLXueyi Liang
Xueyi Liang
WZWen Zhao
Wen Zhao
GDGuangwei Dai
Guangwei Dai

5 July 2024 in Construction and Building Materials
Verified
Journal Article
Closed access
XWXin Wang
Xin Wang
WZWen Zhao
Wen Zhao
KLKeqi Liu
Keqi Liu
SLShengang Li
Shengang Li
PHPeng He
Peng He
PQPeng Qi
Peng Qi

5 January 2024 in Transportation Geotechnics
Verified
Journal Article
Closed access
KLKeqi Liu
Keqi Liu
HPHezheng Pei
Hezheng Pei
SWShuhong Wang
Shuhong Wang
ZZZe Zhang
Ze Zhang
RYRunsheng Yang
Runsheng Yang

11 May 2024 in Construction and Building Materials
Verified
Journal Article
Closed access
KLKeqi Liu
Keqi Liu
WZWen Zhao
Wen Zhao
ZWZhechao Wang
Zhechao Wang
NWNing Wu
Ning Wu
DDDaniel Dias
Daniel Dias

19 October 2022 in Buildings
Verified
Journal Article
Open access
PDF file
KLKeqi Liu
Keqi Liu
WDWantao Ding
Wantao Ding
Chunxu QuChunxu Qu
Chunxu Qu
The penetration characteristics of the slurry and the support pressure transfer mechanisms are critical to the tunnel face stability control during a mechanized excavation. In this paper, numerical calculations coupling computational fluid dynamics (CFD) with the discrete element method (DEM) are carried out to simulate sand column penetration tests considering different particle size ratios. The reasonableness of the numerical model is verified by comparing the variation patterns of the soil permeability coefficients monitored in the numerical tests with the results of existing laboratory tests. The mesoscopic transport characteristics of the slurry particles in the sand soil pores are considered based on numerical tests, while the slurry support effects corresponding to different penetration types are evaluated. Three main basic types of slurry infiltration are observed due to the different ratios of slurry particle size over soil pore size. For the first penetration type, the slurry particles are accumulated and able to form a supporting filter cake. The slurry support is effective because of the significant pressure drop generated on both sides of the filter cake. For the second penetration type, both a filter cake and an infiltration zone are present. A dense filling network is formed between the filter cake and the penetration zone. The third type corresponds to a purely penetration zone. An effective impermeable filling network cannot be formed, and the slurry support effect is not obvious. The development of slurry penetration distance shows an obvious time effect; the farther the penetration distance, the larger the slurry filtration loss, and the worse the transformation effect of slurry support pressure.

13 September 2024 in Computational Particle Mechanics
Verified
Journal Article
Open access
PDF file
HWHan Wang
Han Wang
MZMinghui Zhang
Minghui Zhang
梦陈梦晗 陈
梦晗 陈
WDWantao Ding
Wantao Ding
KLKeqi Liu
Keqi Liu
ZWZhicheng Wang
Zhicheng Wang
Slurry shield construction frequently encounters the risk of air cushion chamber clogging, which may cause pipeline damage at a minor level, or serious abnormal shutdown of the shield machine, resulting in serious negative impacts on construction safety and efficiency. Current studies primarily focus on the transport characteristics of cuttings in the discharge pipe, while the complete process from the air cushion chamber into the discharge pipe until discharge is often overlooked. The air cushion chamber is decisive in this process, fundamentally determining the discharge performance of cuttings. Therefore, the reasonable layout of scouring pipes within the chamber is particularly critical for alleviating the clogging risk. However, the current layout of scouring pipes lacks sufficient guidance, necessitating urgent optimization research. This paper establishes a model that more comprehensively reflects the process of cuttings discharge based on the CFD-DEM method and investigates the effects of scouring pipes layout on cuttings discharge performance. The results indicate that the cuttings discharge performance improves with the decrease in the layout height and rotation angle of the scouring pipes, as well as with the increase in the layout width and extension distance. Additionally, the layout scheme of scouring pipes with optimal discharge performance is determined based on the response surface method. These findings contribute to alleviating the risk of clogging in the air cushion chamber of the slurry shield.