Based on the structural and geological characteristics of the F1 weathering trough of a submarine tunnel and its spatial relationship with the cavern, a simplified calculation model of the weathering trough water inrush was established, and the formation, development process and influencing factors of the water inrush channel in the water-resistant rock layer were carried out by a numerical simulation of particle flow. It shows that the integrity and stability of the critical water-resistant rock mass is the key to preventing water inrush, and the identification and positioning of the water inrush channel is the basis for the grouting reinforcement design of the weathering groove of the submarine tunnel. Based on above research results, the F1 weathering trough was blocked and reinforced by the composite grouting method, and the engineering reinforcement effect was good.
A prestressed concrete containment is the enclosure structure of a nuclear reactor that serves as the last physical barrier of a nuclear power plant (NPP) safety defense system. It plays a key role in the prestress time-limited aging analysis (TLAA) required for operating license extensions for NPPs. Considering prestress containment systems without long-term monitoring tendons in a nuclear power plant, the technical route for prestress TLAAs involves analyzing operating license extension regulations and in-service monitoring technical requirements for prestressed tendons performance. Using tendons based on theoretical calculations of prestress loss in a nuclear power plant and the minimum required value of prestress determined by numerical simulation, the theoretical predictive value can be compared with the minimum required value for prestressed steel tendons. This comparison can be used to evaluate the 20-year life extension of the prestress system and provide a reference for aging and life management of NPPs.