Po Ning

Dr. Po Ning


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 April 2023 in Forests
Verified
Journal Article
Open access
PDF file
PNPo Ning
Po Ning
XXXin Xia
Xin Xia
元姜元俊 姜
元俊 姜
Roots can be seen as natural soil reinforcement material. The prediction and quantitative evaluation of the shear strength of root-permeated soil is the focus of vegetation slope protection, in which the bonding effect of the root–soil interface is the key factor. Taking the roots of Chinese fir trees as an example, the shear resistance test of root–soil interface bonding strength and the direct shear test of root-permeated soil with different root area ratios and inclination angles were carried out. The results indicated that the bonding strength of the root–soil interface could be quantified by interfacial cohesion and friction angle. The shear strength of root-permeated soil increased with the root area ratio, and its relationship with the inclination angle of root relative shear direction was: 45° > 90°. In addition, an estimation model of the ultimate shear strength of root-permeated soil was developed, in which the bonding effect of the root–soil interface was quantified by the interface bonding strength parameters. The soil stress, root diameter, root length, and the initial angle between the root and shear direction can be considered in the estimation model. The rationality and accuracy of the estimated model were verified through the comparison of experimental results and Wu’s model. The proposed model can be used to calculate the stability of the biotechnical reinforcement landslides and evaluate the shear strength of the root-permeated soil.

4 July 2022 in Landslides
Verified
Journal Article
Closed access
PDF file
YJYuan-Jun Jiang
Yuan-Jun Jiang
YSYue Song
Yue Song
PNPo Ning
Po Ning
ZWZheng-Zheng Wang
Zheng-Zheng Wang

13 December 2023 in Remote Sensing
Verified
Journal Article
Open access
PDF file
Chun ZhuChun Zhu
Chun Zhu
ZLZhipeng Li
Zhipeng Li
Yiding BaoYiding Bao
Yiding Bao
PNPo Ning
Po Ning
XZXin Zhou
Xin Zhou
BCBingbing Chen
Bingbing Chen
To clearly realize the dynamic process as well as the dynamic fragmentation behavior of a long run-out rockslide, a novel numerical method for landslide simulation of the coupled finite-discrete element method (FDEM) was applied and the Jichang rockslide was used as a case. The calibrated simulation result of the FDEM in a rockslide deposit corresponds well with the real rockslide deposit. The main run-out process of the rockslide lasts for 75 s and can be divided into acceleration and deceleration stages, which last for 33 s and 42 s, respectively. The maximum overall rockslide movement speed is 35 m/s while the partial sliding mass reaches 45 m/s. The fracturing, fragmentation, and disintegration processes of the sliding mass can be clearly observed from the dynamic scenarios. Fracture energy generated by rock fracturing constantly increases with time in a non-linear form. Of the total fracture energy, 54% is released in the initial 5 s because of fracturing, and 39% of the total fracture energy is released because of fragmentation and disintegration in the last 35 s. The accumulated friction energy increases in the whole run-out process, and its magnitude is much greater than the kinetic energy and fracture energy of the sliding mass.

9 February 2023 in Water
Verified
Journal Article
Open access
PDF file
PNPo Ning
Po Ning
元姜元俊 姜
元俊 姜
JTJun-Jie Tang
Jun-Jie Tang
QXQi-Jun Xie
Qi-Jun Xie
Because of the wide distribution of overland oil and gas pipelines, some pipelines will unavoidably pass through landslide-prone mountainous areas. Landslides may cause deformation or even damage to pipelines, affecting the normal working of the pipeline system. Therefore, it is necessary to study the multiple influence factors of pipeline deformation caused by landslides and establish a forewarning model for oil and gas pipelines buried in landslides. In the present research, the field investigation and a series of large deformation numerical simulations are conducted along four pipelines located in the southeast region of China. Results show that small soil landslides are the main types of landslides threatening the safety of pipelines, whose deformation degree mainly depends on the scale of the landslides and the location of the pipelines in the landslides. Through the investigation, the scale of landslides is the main factor determining the deformation of pipelines induced by landslides. Considering the variation of the scale of landslides, with the increase of the angles, thicknesses, and lengths of the landslides, the pipeline deformation keeps increasing. When crossing the landslides laterally, the pipeline buried in the leading edge of landslides is safer than in the tail edge. What is more, it is most dangerous when the pipeline is buried in the middle of a landslide. Considering the variation of the scale of landslides, including the longitudinal length, horizontal width, thickness, and slope of landslides, as well as the location of pipelines in the landslides, a piecewise forewarning model including those parameters was established based on the influence function for crossing pipelines in landslides. The proposed forewarning model can be used for monitoring and evaluating landslide geological disasters of pipelines and reduce the risk of pipeline landslide geological hazards in the monitored area effectively.