The main challenges in the widespread deployment of electric vehicles (EVs) are limited driving range, long charging downtime, lack of charging stations in some areas, and high battery cost. Dynamic wireless charging (DWC) technology can overcome some of these obstacles by recharging EV batteries remotely while vehicles move over the charging infrastructures. However, most studies have limited this technology to public EVs working in specific routes like electric buses and taxis routes. This paper presents a long-term stochastic scenario-based mathematical model for allocating and sizing DWC infrastructures considering Ev’s location-routing, power distribution system (PDS) losses, and transportation network traffic. The proposed long-term model allows all types of EVs to take advantage of the installed DWC infrastructures and facilitate EVs’ widespread use by overcoming conventional charging technologies problems. The optimization problem is structured in the form of a Mixed Integer Non-Linear Programming (MINLP) model. Simulation results with detailed analyzes are furnished to illustrate the characteristics and performance of the model in a coupled network combining transportation and power networks. The numerical analysis provides meaningful insight into the transportation system design based on DWC technology and the effect of EV routing on the charging infrastructure allocation. Simulation results show that using Location-Routing Problem (LRP) can save up to 45% of the total cost of the DWC system. In addition, the proposed model, along with the simulations performed, demonstrates the advantage of DWC technology in reducing the size of vehicle batteries.
5 March 2021 in IEEE Transactions on Vehicular Technology
Recent trends in plug-in electric vehicles (PEVs) include the investment in public charging stations (PCS) construction, wherein PEVs can charge their batteries, and PCS owners can make profits. Scheduling algorithms used in the PCS can optimally assign PCS resources to the vehicles in order to maximize their profit. Although the main purpose of the PCS is to provide charging capability, it needs to address other customer requirements such as different deadline constraints, battery swapping, and vehicle to grid (V2G). In this paper, we introduce a comprehensive model for multiservice PCS profit maximization in which battery charging, discharging, and swapping services are included. The model has been used in formulating a mixed-integer linear programming (MILP) problem wherein charging and discharging of vehicles are scheduled to maximize the PCS profit. We utilize queuing theory to analyze the performance of the model at the presence of random variables such as solar power, electricity price, state of charge (SoC), amount of discharge (AoD), battery capacity, and vehicle arrival time to the PCS. Low complexity and near-optimal online scheduling algorithm is proposed to complete the offline scheduling solution. Our simulation results show that more profit for the PCS and less delay for vehicles are better achieved when the number of vehicles requesting battery swapping service is increased. Extensive simulations are conducted to evaluate the impact of different parameters on long-term profit and the performance of the online algorithm.
Recent developments in networking include the interest in software‐defined networking, in which OpenFlow switches are in charge of forwarding traffic by matching incoming packets with forwarding rules in their flow tables. Flow tables are commonly implemented in ternary content addressable memories (TCAMs). Typically, this type of memory tends to be extremely expensive and to be power‐hungry devices. The price and power dissipation of TCAM depend on the capacity of the memory. A blind design of memory size can result in dramatic degradation in performance and power efficiency of the entire network. In this study, the authors clarify this impact and show how the optimum value of TCAM capacity is attainable. They also propose a power consumption model for TCAM‐based OpenFlow switches. Simulation results show that the proposed solution reduces the average power consumption by 24% compared to the minimum link on method and by 11.5% compared to the minimum node on (MNO) method and thus power efficiency is better achieved when each memory is supplied by appropriate TCAM size.
8 September 2017 in IEEE Transactions on Smart Grid
Solving the optimal power flow (OPF) in industrial microgrids (IMGs) in presence of plug-in electric vehicles (PEVs) changes the structure of problem to a complex dynamic OPF (DOPF). The complication is due to energy and time related constraints of PEVs that requires the complex non-linear timecoupled DOPF problem to be solved over a long period of few hours (e.g., 24-hours). This paper presents a novel time-decoupled framework for solving the generation scheduling problem in IMGs by relaxing the time correlated constraints of the DOPF. The relaxation is mathematically achieved by replacing the timecoupled constraints with their corresponding long term time averages. This will resolve the time coupling property of DOPF and results in a simpler solution approach. The relaxed DOPF (RDOPF) problem can be solved in independent time periods while considering other constraints such as PEVs and security constraints of OPF as well as factories constraints. To examine the effectiveness of the proposed method, different simulation scenarios have been applied to an 18-bus IMG consisting of PEVs and 12 factories with electrical and thermal loads as well as combined heat and power (CHP) systems.
2 May 2019 in Transactions on Emerging Telecommunications Technologies