Mostafa Hassan

Mr. Mostafa Hassan

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 September 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
Lamya AmlehLamya Amleh
Lamya Amleh
MHMostafa Hassan
Mostafa Hassan
LHLuaay Hussein
Luaay Hussein
Climate change poses a significant threat to the durability of reinforced concrete (RC) bridges, which are particularly vulnerable to chloride-induced corrosion of steel reinforcements. The main problem for the current research is the increase in the projected maximum temperature values, especially for the high emission scenario in the future because of climate change, applied to the upper part of the RC bridge deck made of geopolymer concrete (GPC) composed of 50% fly ash and 50% slag. This will reduce the corrosion initiation time and the safety and durability of the RC bridge deck structure. Despite extensive research on chloride-induced corrosion, there is a scientific gap in understanding how future climate variations will influence the rate of corrosion in RC bridges. Specifically, comprehensive studies assessing the effect of maximum temperature on the probability of the corrosion initiation process in RC bridge decks made of GPC exposed to chloride environments are lacking. This study used the Monte Carlo simulation method to assess the probability of corrosion initiation (PCI) under various future climate scenarios for Toronto City, Canada. This research examines the impact of the maximum temperature and relative humidity on the diffusion coefficient of chloride ions in concrete. It assesses the PCI for different concrete cover thicknesses in RC decks made of geopolymer concrete composed of 50% fly ash and 50% slag over specified periods, dealing with the sensitivity analysis for this parameter among different parameters defined in the performance function. The results indicate a substantial increase in the PCI for a 40 mm concrete cover compared with a 50 mm cover in various years. Furthermore, maximum temperatures ranging from 40 °C to 45 °C significantly increase the PCI compared with temperatures between 25 °C and 35 °C for a 50 mm concrete cover. Finally, polynomial functions have been deduced to investigate the reliability index and PCI as a function of various coefficients of variations for mean concrete covers made of GPC at various maximum temperature values in different years. These findings provide important information for the design and maintenance of RC structures, ensuring their longevity in the face of climate change.

23 August 2023 in Periodica Polytechnica Civil Engineering
Verified
Journal Article
Closed access
PDF file
MHMostafa Hassan
Mostafa Hassan
Lamya AmlehLamya Amleh
Lamya Amleh
The consequences of climate change on infrastructure, particularly reinforced concrete (RC) bridges, have rapidly increased in recent years. These consequences are primarily driven by the surge in CO2 emissions, which significantly impacts the carbonation depth of RC structures. This study aims to investigate the probability of carbonation-induced corrosion initiation (PCICI) in RC bridge elements. To achieve this, the investigation incorporates a range of concrete covers, varying from 30 to 50 mm, and considers different concrete mixes with cement contents of 400, 350, and 250 kg/m3. The investigation utilizes the Monte-Carlo simulation method, considering different representative concentration pathways (RCPs) to account for two emission scenarios: RCP2.6 (low emission scenario) and RCP8.5 (high emission scenario). By analyzing projected CO2 concentrations and maximum temperature, the study provides insights into the potential corrosion initiation risks in RC bridges. The findings indicated a significant 66.3% increase in PCICI for a cement content of 250 kg/m3, compared to 400 kg/m3, under the RCP8.5 scenario, specifically when using a concrete cover of 30 mm by 2100. The study also revealed that the PCICI approached an approximate value of zero when concrete covers were set at 45 and 50 mm regardless of the variations in cement contents and the duration considered, for both the RCP2.6 and RCP8.5 scenarios.

Verified
Journal Article
Open access
PDF file
MHMostafa Hassan
Mostafa Hassan
Lamya AmlehLamya Amleh
Lamya Amleh
This study investigates the influence of crack width on the time to chloride-induced corrosion initiation in reinforced concrete (RC) bridge decks, incorporating climate change projections through the year 2100 under IPCC scenarios (RCP2.6 and RCP8.5). A probabilistic modelling approach using Monte Carlo simulations (MCSs) was applied to assess corrosion initiation across a range of environmental and structural conditions, including normal and high-performance concrete (HPC), varying concrete cover depths, and the use of supplementary cementing materials (SCMs). The results indicate that increasing the crack width significantly accelerates chloride ingress, reducing the time to corrosion initiation by up to 41% compared with that under uncracked conditions. HPC demonstrated superior durability, delaying corrosion initiation by nearly twice as long as normal concrete under identical chloride exposure. Elevated temperatures projected under high-emission scenarios further reduce service life by increasing chloride diffusion rates. Polynomial regression models were developed to relate crack width and concrete cover to corrosion initiation time, offering practical tools for durability-based design and service life prediction. These findings highlight the importance of enhanced crack control, climate-adaptive material selection, and updated durability standards to improve the resilience of RC bridge infrastructure in the face of climate change.

30 November 2025 in International Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
MHMostafa Hassan
Mostafa Hassan
This research aims to evaluate the Probability of Chloride-Induced corrosion initiation (PCI) due to chloride, utilizing the Monte Carlo simulation method across various percentages of Supplementary Cementitious Materials (SCMs), ranging from 10% to 50%, with the cement used in concrete mixes for uncracked Reinforced Concrete (RC) decks. Moreover, the RC decks are impacted by various maximum temperature scenarios. The maximum temperature values that affect the diffusion coefficient for chloride range from 25°C to 50°C, representing a different range of representative concentration pathways of the maximum temperature values in future years. The results show that the relationship between the impact of maximum temperature levels varying from 25°C to 50°C applied to the RC deck and the corresponding reliability index is a descending linear relationship across various percentages of SCMs used in the RC deck mixes. The impact of slag is more significant on the PCI compared to the fly ash used as an SCM in various mixes, when the percentages of both SCMs range from 10% to 30% for RC decks subjected to a maximum temperature value of 25°C, 35°C, and without the impact of maximum temperature. This study provides valuable insights into the assessment and management of RC bridges under climate change and offers a predictive model for assessing the risk of corrosion.

8 December 2025 in Journal of Building Material Science
Verified
Journal Article
Open access
PDF file
MHMostafa Hassan
Mostafa Hassan
The rapid change in CO2 concentration levels, due to climate change, will lead to a significant reduction in the durability and safety of the vital reinforced concrete (RC) structures. Utilizing supplementary cementitious materials, such as low calcium fly ash (LCFA) or slag, etc., with larger percentages in concrete mixes, would lead to an increase in the carbonation depth and risk of corrosion, especially for cracked concrete sections subjected to severe CO2 concentration levels. This research aims to compare the carbonation depth values using two different mathematical models across various CO2 concentrations and crack widths, for concrete mixes composed of different percentages and types of fly ash for both uncracked and cracked RC members, at a specific time of CO2 exposure. Moreover, the main objective is to assess the probability of corrosion (PC) across various percentages and types of fly ash used in cracked RC decks subjected to a severe CO2 level. The PC would be investigated through the Montecarlo simulation method. A Crack width of 0.1 mm in the RC decks would lead to a severe impact on the PC conducted using the Al-Ameeri model compared to the Kwon and Na model, when the percentages of LCFA vary from 5% to 30% in concrete mixes. It is recommended in this research to reduce the amount of high calcium fly ash in the mixes for RC decks to a percentage below 15% instead of LCFA to inhibit the carbonation-induced corrosion and enhance the durability and serviceability of RC structures.