Jonathan Weston Elliott

Dr. Jonathan Weston Elliott

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2019 in Journal of Facilities Management
Verified
Journal Article
Closed access
MSMarjan Sadeghi
Marjan Sadeghi
JEJonathan Weston Elliott
Jonathan Weston Elliott
NPNick Porro
Nick Porro
KSKelly Strong
Kelly Strong
Purpose: This paper aims to represent the results of a case study to establish a building information model (BIM)-enabled workflow to capture and retrieve facility information to deliver integrated handover deliverables.Design/methodology/approach: The Building Handover Information Model (BHIM) framework proposed herein is contextualized given the Construction Operation Information Exchange (COBie) and the level of development schema. The process uses Autodesk Revit as the primary BIM-authoring tool and Dynamo as an add-in for extending Revit’s parametric functionality, BHIM validation, information retrieval and documentation in generating operation and maintenance (O&M) deliverables in the end-user requested format.Findings: Given the criticality of semantics for model elements in the BHIM and for appropriate interoperability in BIM collaboration, each discipline should establish model development and exchange protocols that define the elements, geometrical and non-geometrical information requirements and acceptable software applications early in the design phase. In this case study, five information categories (location, specifications, warranty, maintenance instructions and Construction Specifications Institute MasterFormat division) were identified as critical for model elements in the BHIM for handover purposes.Originality/value: Design- and construction-purposed BIM is a standard platform in collaborative architecture, engineering and construction practice, and the models are available for many recently constructed facilities. However, interoperability issues drastically restrict implementation of these models in building information handover and O&M. This study provides essential input regarding BIM exchange protocols and collaborative BIM libraries for handover purposes in collaborative BIM development.

26 July 2019 in Buildings
Verified
Journal Article
Open access
PDF file
SOSvetlana Olbina
Svetlana Olbina
JEJonathan Weston Elliott
Jonathan Weston Elliott
Researchers have explored Building Information Modeling (BIM) utilization on complex buildings. However, limited research has been conducted investigating BIM implementation on simple projects. This study explored the perceptions of Architects, General Contractors and Owners regarding the project characteristics that impact successful BIM implementation, and the realized benefits thereof, on complex commercial buildings versus parking garages. A survey comprised of the project characteristics and realized benefits of BIM implementation identified by Dodge Data & Analytics was distributed. Exploratory Factor Analysis was conducted to identify the empirical groupings of successful BIM implementation characteristics and realized benefits thereof. Factor means were calculated and compared using ANOVA and t-tests. Statistical comparisons revealed no significant differences by building type. For project stakeholders, a significant difference was only observed on owner’s mean perceptions of technology-related characteristics when compared to architects. Previous research indicates that Architecture, Engineering, and Construction (AEC) stakeholders believe BIM is beneficial for large and complex projects. With the exception of technology-related project characteristics, findings reveal no statistical differences for project characteristics impacting successful BIM utilization or the realized benefits of BIM implementation given building type. This finding provides empirical evidence that various stakeholder groups view BIM as a universal AEC process that provides benefits on both complex and simple projects.

4 March 2015 in International Journal of Construction Education and Research
Verified
Journal Article
Closed access
JEJonathan Weston Elliott
Jonathan Weston Elliott
MTMelissa K. Thevenin
Melissa K. Thevenin
CPCarla Lopez Del Puerto
Carla Lopez Del Puerto

21 February 2023 in Buildings
Verified
Journal Article
Open access
PDF file
JEJonathan Weston Elliott
Jonathan Weston Elliott
SOSvetlana Olbina
Svetlana Olbina
Most previous Reality Capture Technology (RCT) research in construction focuses on the technical aspects of data collection, processing, and post-processing, while fewer studies have explored stakeholder perceptions about adopting and implementing RCT. This research investigated the perceptions of various construction project stakeholders in the commercial and infrastructure sectors regarding the benefits of, and obstacles hindering, the adoption of RCTs. A survey was distributed to the membership of U.S.-based professional organizations. Exploratory Factor Analysis was implemented to investigate and confirm logical and consistent empirical groupings of the benefits and obstacles listed in the survey. In general, mean comparisons revealed consistency across stakeholder perceptions of the benefits and obstacles of RCTs. However, significantly different perceptions about the increased accuracy of prefabricated elements, RCTs not being a company priority, lack of company budget, and data collection being too time consuming were observed between stakeholder groups. The study identified several benefits to RCT adoption (including, but not limited to, reduced project risk, increased accuracy of prefabricated elements and installed work as well as increased speed of as-built document creation) that were not noted in previous studies. Several obstacles to RCT (including, but not limited to, RCT not being a company priority, lack of Owner/Client demand, inability to bill RCT costs to the project, and cost of hiring employees with the required skills) were not observed in previous studies.

1 September 2015 in Journal of Employment Counseling
Verified
Journal Article
Closed access
PDF file
JEJonathan Weston Elliott
Jonathan Weston Elliott
CPCarla Lopez del Puerto
Carla Lopez del Puerto

11 January 2017 in International Journal of Construction Education and Research
Verified
Journal Article
Closed access
JEJonathan Weston Elliott
Jonathan Weston Elliott
MTMelissa K. Thevenin
Melissa K. Thevenin
BBBen F. Bigelow
Ben F. Bigelow
High levels of self-efficacy, motivation and intentions to perform well are necessary to achieve high grade point averages (GPA) in demanding academic programs including engineering, mathematics and the sciences. However, scant research has investigated these constructs within the domain of construction management (CM) education. The Construction Training Attitudes and Intentions Scale (CTAIS), which adapts self-efficacy, motivation and planned behavior constructs to the construction-education domain, was administered among CM and Non-CM students (n = 633) enrolled in courses required for a bachelor degree at three American Council for Construction Education accredited programs. Significant differences (p < .001) in construction-education domain-level constructs were observed for CM and Non-CM majors providing evidence of face validity. CM majors (n = 587) were separated for ANOVA. Significant differences in self-efficacy (p = .014) and planned behavior (p = .001) were observed by GPA. Post-hoc analysis revealed differences in these constructs based on GPA above, or below, 3.0. CM majors (n = 587) were aggregated using the 3.0 GPA benchmark (GPA > 3.0, n = 328; GPA< 3.0, n = 239). T-test results revealed significantly higher levels of self-efficacy (p = .001) and planned behavior (p < .001) among students with GPAs above 3.0. This study provides CM educators with a domain-specific measure to target students for interventions that promote success. Limitations and opportunities for further research are discussed.