Construction site layout planning (CSLP) that considers multi-objective optimization problems is essential to achieving sustainable construction. Previous CSLP optimization methods have applied to traditional cast-in-place buildings, and they lack the application for sustainable prefabricated buildings. Furthermore, commonly used heuristic algorithms still have room for improvement regarding the search range and computational efficiency of optimal solution acquisition. Therefore, this study proposes an improved multi-objective optimization and decision-making method for layout planning on the construction sites of prefabricated buildings (CSPB). Firstly, the construction site and temporary facilities are expressed mathematically. Then, relevant constraints are determined according to the principles of CSLP. Ten factors affecting the layout planning on the CSPB are identified and incorporated into the method of layout planning on the CSPB in different ways. Based on the elitist non-dominated sorting genetic algorithm (NSGA-II), an improved multiple population constraint NSGA-II (MPC-NSGA-II) is proposed. This introduces the multi-population strategy and immigration operator to expand the search range of the algorithm and improve its computational efficiency. Combined with the entropy weight and technique for order preference by similarity to an ideal solution (TOPSIS), improved multi-objective optimization and decision for the CSLP model is developed on the CSPB. Practical cases verify the effectiveness and superiority of the algorithm and model. It is found that the proposed MPC-NSGA-II can solve the drawbacks of the premature and low computational efficiency of NSGA-II for multi-constrained and multi-objective optimization problems. In the layout planning on the CSPB, the MPC-NSGA-II algorithm can improve the quality of the optimal solution and reduce the solution time by 75%.
When constructing long-span spatial steel structures, the unformed structure is often incomplete and unstable. The construction sequence significantly influences the mechanical state of the structure during the construction stages (CSs), affecting both the path and time effects. This study examined the mechanical properties of the construction process using an actual project as a case study, comparing two methods: one-step forming and stage-by-stage forming. Critical turning points of stress and displacement during the CSs were identified as the initial installation and unloading stages. Stress concentrations frequently occurred at temporary support points, and peak displacements often appeared at the outer overhanging bars of the structure. A well-planned construction sequence can effectively manage the structure’s formation, boundaries, and loading to ensure construction safety and stability. The conclusions and analysis methods from this study provide valuable references for the design and construction of similar long-span spatial steel structures.