bo dong

Dr. bo dong


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 April 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
BDbo dong
bo dong
YWyi qiong wang
yi qiong wang
FMFenghai Ma
Fenghai Ma
CZCun Zhang
Cun Zhang
LZLiang Zou
Liang Zou
The theoretical calculation of a counterweight double-row pile supporting structure is deduced and studied in this paper. The derived calculation method is applied to a Midas GTS NX simulation calculation. A case study of a deep foundation pit project in Shenzhen City is used to verify and analyze the simulation results and the field monitoring results. On this basis, the influence law of deformation parameters such as the row distance, pile diameter of back-row piles and load of the pit top on the pile of a double-row pile is further discussed. The results show that both the front- and back-row piles of counterweight double-row piles are overturning deformation, and the characteristics of the horizontal displacement are basically the same. The maximum value of the horizontal displacement of the pile is at the top and the minimum value is at the bottom. With the increase in the row distance and pile diameter, the horizontal displacement of the pile becomes smaller, and the change in the pile horizontal displacement under a top load is contrary to that. Moreover, the change in the row distance has a great influence on the horizontal displacement of the pile, followed by the load of the pit top, and the pile diameter of the back-row piles has the least influence. Due to the connection effect of the horizontal plate of the counterweight platform, the whole supporting structure is in the form of a hyperstatic structure. The back-row piles can withstand most of the lateral earth pressure, which effectively reduces the deformation of the front pile and improves the overall stiffness of the supporting structure, which is conducive to the excavation stability of the deep foundation pit. Therefore, its extensive use in the Linhai soft soil project can not only effectively reduce the number of internal supports and achieve the purpose of cost saving but also increase the construction face, which is beneficial to the development of dry construction organization and management, in line with the construction concept of green environmental protection and sustainable development advocated at present.

1 January 2024 in Advances in Civil Engineering
Verified
Journal Article
Open access
KWKai Wei
Kai Wei
BDbo dong
bo dong
ZSZHANG SHUAI
ZHANG SHUAI
Jun HuJun Hu
Jun Hu
The Sanya estuary passage project is the latest and highly technical underground project after the large shield underground construction, which is of great significance to the construction of the Hainan free trade port and underground space construction innovation. In this paper, we use finite element software to analyze the deformation, stress, and surface settlement of the pipe curtain structure during construction under two conditions (original riverbed line and maximum scour riverbed line) in order to provide guidance for the actual project. Numerical simulations show that due to excavation and unloading, the bottom and top of the pipe curtain structure are subject to tensile stress; the bottom rises, the top settles, and converges in the horizontal direction; under the original riverbed line condition, the displacement values of each index are larger; changing the riverbed line does not change the maximum and minimum main stress of the pipe curtain structure significantly, and the stiffness of the pipe curtain structure can meet the maximum water level and the maximum scour in two unfavorable conditions; the pipe curtain structure can meet the structural. The pipe screen structure can meet the structural load‐bearing requirements. Suggestions for the design and construction of the project: strengthen the thickness of the pipe curtain at the side wall position, that is, use larger diameter steel pipes; do a good job of antiseepage and anticracking of the concrete at the corner of the pipe curtain structure and the side wall position during the construction process.