Víctor Hugo García Rodríguez

Dr. Víctor Hugo García Rodríguez


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 August 2018 in Energies
Verified
Journal Article
Open access
PDF file
VRVíctor Hugo García Rodríguez
Víctor Hugo García Rodríguez
RSRAMON SILVA-ORTIGOZA
RAMON SILVA-ORTIGOZA
EHEduardo Hernández-Márquez
Eduardo Hernández-Márquez
JGJosé Rafael García-Sánchez
José Rafael García-Sánchez
HTHind Taud
Hind Taud
In this paper, the modeling and the experimental verification of the “bidirectional DC/DC boost converter–DC motor” system are presented. By using circuit theory along with the model of a DC motor, the mathematical model of the system is derived. This model was experimentally tested under time-varying duty cycles obtained via the system differential flatness property. The experimental verification was carried out using Matlab-Simulink and a DS1104 board in a built prototype of the system.

17 October 2017 in IEEE Latin America Transactions
Verified
Journal Article
Closed access
EHEduardo Hernández-Márquez
Eduardo Hernández-Márquez
RORamon Silva Ortigoza
Ramon Silva Ortigoza
JGJosé Rafael García-Sánchez
José Rafael García-Sánchez
VRVíctor Hugo García Rodríguez
Víctor Hugo García Rodríguez
JJJose Norberto Alba Juarez
Jose Norberto Alba Juarez
This work presents the modeling and validation of a bidirectional “DC/DC Buck-Boost converter-DC motor” system. This configuration allows the change of rotation in both directions on the motor shaft. The experimental validation of the model is accomplished for time-varying duty cycles. This allows solving the trajectory tracking task in open-loop of the system. On the one hand, applying the Kirchhoff's laws along with the model of a DC motor, the mathematical model is obtained. While, the trajectory planning is carried out by expressing the system states and duty cycles in terms of the converter voltage and motor angular velocity. The validation of the deduced model is performed via Matlab-Simulink and a DS1104 board in a laboratory prototype of the system.

7 March 2023 in Energies
Verified
Journal Article
Open access
PDF file
VRVíctor Hugo García Rodríguez
Víctor Hugo García Rodríguez
JPJ. Humberto Pérez-Cruz
J. Humberto Pérez-Cruz
Roberto Ambrosio LazaroRoberto Ambrosio Lazaro
Roberto Ambrosio Lazaro
STSalvador Tavera-Mosqueda
Salvador Tavera-Mosqueda
This paper presents an analysis and simulation of the mathematical model associated to the DC/DC Boost converter–full-bridge Buck inverter system to regulate the voltage output of the DC/DC Boost converter allowing bipolar voltages higher than the input voltage via the full-bridge Buck inverter. To validate the model, the differential flatness property is applied via the flat outputs of the system (energy for the DC/DC Boost converter and the voltage of the full-bridge Buck inverter) considering the complete dynamics, in conjunction with fixed and time-variant trajectory planning. In the simulation results, it is observed that the error signals of the states versus the reference trajectories are acceptable. Regarding the validation of the model, this is performed with open-loop simulations at the circuit level using the SimPowerSystems Toolbox of Matlab-Simulink. The simulation results validate the good performance of the system under study. In this way, the main contribution of this work is that for the first time in the literature, the analysis of a complete dynamics for a conversion system from DC to AC without the use of a transformer and taking advantage of differential flatness is reported; thus, the system analyzed could be represented as an alternative in applications of renewable energies that require conversion from DC to AC.

12 December 2024 in Results in Engineering
Verified
Journal Article
Open access
VRVíctor Hugo García Rodríguez
Víctor Hugo García Rodríguez
RARoberto Carlos Ambrosio-Lázaro
Roberto Carlos Ambrosio-Lázaro
JPJosé Humberto Pérez-Cruz
José Humberto Pérez-Cruz
STSalvador Tavera-Mosqueda
Salvador Tavera-Mosqueda
CACarlos Roberto Ascencio-Hurtado
Carlos Roberto Ascencio-Hurtado

22 May 2026 in Electronics
Verified
Journal Article
Open access
PDF file
ARAlfredo Roldán
Alfredo Roldán
EHEduardo Hernández-Márquez
Eduardo Hernández-Márquez
JGJosé Rafael García-Sánchez
José Rafael García-Sánchez
STSalvador Tavera-Mosqueda
Salvador Tavera-Mosqueda
VRVíctor Hugo García Rodríguez
Víctor Hugo García Rodríguez
WGWuiyevaldo Fermín Guerrero-Sánchez
Wuiyevaldo Fermín Guerrero-Sánchez
This paper proposes a new single-stage bipolar Boost DC/DC converter topology, hereafter referred to as the Full-bridge Boost converter. The proposed architecture enables the generation of a bipolar output voltage with a magnitude equal to or greater than the input voltage, reducing the passive component count. Specifically, a single inductor and a single capacitor are employed, in conjunction with a full-bridge structure and auxiliary switches, to achieve both voltage boosting and polarity inversion within a unified conversion stage. A comprehensive switching configuration is presented, and a mathematical model based on the system switching dynamics is derived. Furthermore, the steady-state behavior is analyzed, yielding an explicit expression for the voltage gain as a function of the control input. In addition, ripple analysis and continuous conduction mode (CCM) boundary conditions are derived to establish design constraints for the converter operation. The characteristic waveforms under both CCM and discontinuous conduction mode (DCM) operation are also analyzed. The validity of the proposed topology and its mathematical representation is verified through MATLAB/Simulink simulations. The detailed switching-level converter is implemented using the Simscape Electrical environment, and the numerical results of the averaged model are compared against the circuit-level simulation through waveform analysis and root mean square error (RMSE) indices to assess modeling accuracy. Finally, implementation feasibility considerations, including semiconductor stress, dead-time requirements, conduction and switching losses, and efficiency analysis, are discussed.