Yongming Yao

Dr. Yongming Yao

Infrastructure Inspection Research Institute, China Academy of Railway Sciences, Daliushu Road No.2, Beijing 100081, China

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 September 2022 in Vehicle System Dynamics
Verified
Journal Article
Closed access
Yongming YaoYongming Yao
Yongming Yao
ZYZhipeng Yang
Zhipeng Yang
JWJing Wang
Jing Wang
WZWenxuan Zhang
Wenxuan Zhang
This paper examines the dynamic performance of the pantograph passing through an overlap section of the catenary system, using a China’s high speed railway with the 4-span overlap as an example. The pantograph and catenary system are simulated as a lumped mass model and finite element model, respectively. The model is verified according to EN50318:2018. The model is also assessed against an experimental study of the contact force and uplift of contact wire at 300 km/h. Then the contact force and uplift of contact wire at the speed of 150–350 km/h are calculated. The research shows that when the pantograph passes through the overlap, the maximum contact force increases beyond 14%, the standard deviation of the contact force increases by more than 26%, and the increase of the vertical displacement exceeds 38%, which becomes more apparent with the increase of speed. Under the influence of aerodynamic force, when the running speed increases from 150 to 350 km/h, the mean contact force in the knuckle-downstream and knuckle-upstream orientation increase by 59.49% and 97.85%, respectively. As a result, the contact force and vertical displacement increase greatly when passing through the overlap section, which could affect the current collection quality.

7 September 2020 in Shock and Vibration
Verified
Journal Article
Open access
PDF file
Yongming YaoYongming Yao
Yongming Yao
NZNing Zhou
Ning Zhou
GMGuiming Mei
Guiming Mei
WZWeihua Zhang
Weihua Zhang
Ice coating on overhead contact system (OCS) will affect the sliding of pantograph, and arc discharge phenomena will occur between pantograph and catenary, which will threaten the normal operation of train. This paper presents a comprehensive model to analyze the dynamics of icing on pantograph-catenary (PAC) system. The finite element model (FEM) is used for building the catenary, the pantograph is modeled as lumped-mass model, and the ice section of the cable is fan-shaped. The increased density method, uniform load method, and combinatorial material method of icing are used to analyze the icing problem of PAC system. The similarities and differences between the three simulation methods are compared. The influence of the ice thickness on the current collection quality between the pantograph and catenary at the different operating speeds calculated by the three methods is basically the same, which fully illustrates the effectiveness of the simulated ice coating method. In comparison, the combinatorial material method is a more reasonable method for calculating the icing of catenary systems. The research also shows that the influence of icing on the current collection quality of PAC system is different when the train runs at different speeds. Specifically, as the speed of trains increases, the effect of ice thickness on the current collection quality of the PAC system is becoming increasingly apparent.

17 July 2020 in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Verified
Journal Article
Closed access
PDF file
Yongming YaoYongming Yao
Yongming Yao
NZNing Zhou
Ning Zhou
DZDong Zou
Dong Zou
GMGuiming MEI
Guiming MEI
WZWeihua Zhang
Weihua Zhang
An extended pantograph-catenary (PAC) contact collision model is presented in this paper. The catenary is described by a finite element model while the pantograph is described by a multi-body model. The normal collision model is established by using the Hertzian contact theory. A 1:1 PAC collision contact test rig is built to validate the pantograph-lifting model. The dynamic responses of the PAC system during lifting the pantograph with different velocities and positions are studied. The research results show that the velocity and position of lifting the pantograph will affect the pantograph-lifting time, acceleration of collector piece, vertical displacement and contact force in the process of lifting pantograph. When the velocity of lifting the pantograph exceeds 0.5 m/s, the contact force between the pantograph and the contact wire will exceed 250 N, which is the allowed value set in the provisions of EN50367. It is essential to control the velocity of lifting the pantograph below 0.4 m/s to prevent the catenary or contact piece from being damaged due to the excessive impact force. The distribution of the droppers also affects the collision force between the PAC system.

2 September 2021 in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Verified
Journal Article
Closed access
PDF file
Yongming YaoYongming Yao
Yongming Yao
NZNing Zhou
Ning Zhou
GMGuiming MEI
Guiming MEI
WZWeihua Zhang
Weihua Zhang
It is a practical engineering problem to lift the pantograph during train operation. In this paper, a pantograph-catenary (PAC) model is established, which can realize pantograph lifting during train operation. In this model, the contact model between contact piece and contact wire is established using the polygon contact model (PCM). The PAC collision test rig is established, and the simulation model at low speed is verified by comparing the contact force and vertical acceleration of contact piece obtained from simulation and test. The factors influencing the process of pantograph lifting are analyzed. The simulation results show that the position where the dropper and contact wire are connected is the most disadvantageous position for pantograph lifting. The maximum impact force increases with the increase of pantograph lifting speed, and the relationship between them is linear. In addition, if the influence of aerodynamic force is not considered, the running speed of vehicle will not affect the pantograph lifting process.

10 March 2025 in Vehicle System Dynamics
Verified
Journal Article
Closed access
Yongming YaoYongming Yao
Yongming Yao
JWJing Wang
Jing Wang
JYJia Yang
Jia Yang
ZYZhipeng Yang
Zhipeng Yang
WWWeifan Wang
Weifan Wang
MMMeijun Mu
Meijun Mu

1 January 2026 in High-speed Railway
Verified
Journal Article
Open access
XQXuanyang Qin
Xuanyang Qin
YCYan Cheng
Yan Cheng
Yongming YaoYongming Yao
Yongming Yao
HDHuayu Duan
Huayu Duan
GJGuoqing Jing
Guoqing Jing
JWJing Wang
Jing Wang