boxu gong

Mr. boxu gong


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 March 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YLYongjian Liu
Yongjian Liu
SHShi Han
Shi Han
BGboxu gong
boxu gong
ZWZhuang Wang
Zhuang Wang
Jiang LiuJiang Liu
Jiang Liu
ZSZhenlong Shen
Zhenlong Shen
In order to accurately calculate the sunshine-induced temperature effect of an ultra-high bridge pylon, a refined numerical simulation model for the 3D bridge temperature field was established based on the proposed automatic sunshine shadow recognition method and pylon-height-related convection modification method. A suspension bridge H-shaped pylon with a height of 280 m was taken as an example, and the temperature field and corresponding thermal stress and deformation were calculated under typical meteorological conditions in spring, summer, autumn, and winter. The results show that the maximum temperature differences between the outer surfaces of the pylon can reach 19 °C and 16 °C for north–south walls and east–west walls, respectively, and exceed the recommended value of ±5 °C in the Chinese Specification. The maximum displacements can reach 370 mm and 110 mm at the top of the bridge pylon in the longitudinal and transverse directions of the bridge, respectively. After the modification of the convective coefficient of the outer surfaces with different wind speeds at different pylon heights, the temperature gradually decreased from the top to the bottom of the pylon, with a temperature difference of 8 °C. The significant influence of the sunshine shadow was shown on the temperature field and temperature effect of the bridge pylon. By considering the shadow effect, the maximum temperature difference can reach 12 °C between adjacent sunlit and shaded areas and can reach 14 °C between two pylon columns. A significant mutation of thermal stress existed in the shaded area, and the maximum stress could be reduced by 13 MPa compared with the adjacent sunlit area. Obvious asynchronous deformation was shown between two pylon columns, and the maximum asynchronous displacement at the top of the pylon can reach 18 mm and 45 mm in the longitudinal and transverse directions, respectively.

17 November 2024 in Buildings
Verified
Journal Article
Open access
PDF file
TXTao Xu
Tao Xu
JMJiqian Ma
Jiqian Ma
GWGuojie Wei
Guojie Wei
BGboxu gong
boxu gong
Jiang LiuJiang Liu
Jiang Liu
The synchronous construction of the pylon and cables of a cable-stayed bridge without backstays has the characteristics of a short construction period and reduced support costs. However, it also increases the difficulty of construction control, making the reasonable completion state of the bridge more complex. To investigate the impact of various load parameters on the structural state of a cable-stayed bridge without backstays during the synchronous construction process, and to ensure a rational final bridge state, this study proposes an assessment framework for evaluating the internal forces of the bridge. The framework initially uses the response surface method to establish explicit equations relating the control indicators of the bridge’s final state to various load parameters. Subsequently, through sensitivity analysis, the degree of influence of each load parameter on the structural response of the cable-stayed bridge without backstays is examined. The most sensitive factors are identified to create a bridge parameter influence library, which helps reduce computational costs. Based on this, a method for controlling construction errors and predicting cable forces is proposed. This method utilizes the pre-established bridge parameter influence library, combined with the internal force state of the bridge at the current construction stage, to accurately predict the tension force of the stay cables in the subsequent stage, thereby ensuring a rational final bridge state. The framework is ultimately validated through a case study of the Longgun River Bridge to assess its rationality and effectiveness.