The objective of this study was to evaluate the best performed bias correction methods to simulate the regional climate models for future climate change projections in Muger Subbasin. Delta change methods perform very well with a coefficient of correlation of 0.99 and a percent of bias –3. When we compare its corrected simulation result with observed data, the delta change method seems to have with no biases for maximum temperature, but increases by 1.67 °C from the mean for minimum temperature of 0.39 and 38.41 mm for monthly and annual precipitation, respectively. Delta change methods underestimate the model result for both temperature and precipitation. Linear scaling and variance scaling methods overestimate the maximum temperature of the simulation by 0.002 and 0.004 °C from the mean of the observed data, but it underestimates 1.59 and 1.56 °C the minimum temperature, respectively. The long-term temperature projection values (2060–2090) are higher than the near-term projections (2030–2060) for both RCP2.6 and RCP8.5 scenarios. Similarly, the change in annual precipitation for the long-term is higher than the near-term projections. As a conclusion, the results draw attention to the fact that bias-adjusted regional climate models data are crucial for the provision of local climate change impact studies in the Muger Subbasin.
This study was, therefore, taken up to dam breach modeling and downstream flood inundation mapping. To achieve this objective, the software ArcGIS Version 10.4 extension program of HEC-GeoRAS Version 10 tool was used for HEC-RAS model development, to generate modeling reach and floodplain cross-sectional geometric data and for downstream inundation mapping and HEC-RAS Version 6.3.1 tool was used for subject dam break simulation and unsteady flood routing at downstream regions. Von Thun and Gillette regression equation was selected to estimate the breach parameter and the result shows that breach bottom width is 113m, side slope 0.5H:1V and breach development time is 0.85hr for overtopping and bottom width is 111m, and side slope 0.5H:1V and breach development time is 0.83hr for pipping. During analysis of flood routing the peak discharge at the dam site is 19,753.68m3/s occurred at 4hr for overtopping and 25,128.1m3/s at time to peak 4hr for pipping.
HIGHLIGHTS. The main finding of the research was to assess the surface water potential of the watershed in gauge and ungauged watersheds. It will be used by oth
HIGHLIGHTS. AHP is used for prioritizing the influencing factors.The groundwater potential zone is developed using weighted overlay analysis.The developed
This study was employed to investigate the temporal variability and trend analysis of areal rainfall in the Muger subwatershed, Upper Blue Nile, Ethiopia. The study was run over the following procedures to handle the main objective: (1) determining the areal rainfall from gauged point rainfall using the Thiessen polygon method, (2) grouping the months in the season according to the study area, (3) evaluating the temporal dynamics of annual and seasonal areal rainfall using the coefficient of variation (CV), standard anomaly index (SAI), and precipitation concentration index (PCI), and (4) analyzing the trend of annual and seasonal areal rainfall using modified Mann–Kendall’s (modifiedmk) test in RStudio. Based on the temporal variability analysis, CV results depict that annual and summer areal rainfall had low variability with values of 13.43% and 13.7%, respectively. Winter and spring areal rainfall shows high variation with a CV value of 50.5% and 36%, respectively. According to the SAI output, around 70% of the considered year was in the normal condition of wetness. On the other hand, the seasonal (winter, spring, and summer) rainfall distribution of the study area shows strong irregularity distribution throughout the considered years as a result of PCI with a value of 57.5%. The trend of the areal rainfall was shown to be both increasing and decreasing. However, the trend was insignificant with a 10% confidence level.
HIGHLIGHTS. The Kalte River watershed was simulated for 31 years including a 3-year warm-up period.The simulated model was calibrated and validated.Erosion hots