This paper takes the deep foundation pit project of Lanzhou Hospital of Traditional Chinese Medicine as the background. The design and construction of the foundation pit is relatively difficult due to the complex environment around the pit, the dense surrounding buildings, the complex underground soil layer and the influence of groundwater on the pit. In order to detect problems in the construction process, the pit was monitored in real time through an automated monitoring system for the whole process of excavation and backfilling of the pit. The analysis of the actual monitoring data shows that: (i) the support scheme of bored pile + prestressed anchor cable support combined with concrete corner bracing can meet the design of this type of foundation pit without causing disturbance to the surrounding buildings; (ii) combined with the actual case of the influence of groundwater on the excavation process of the foundation pit, it proves that the real-time measurement by the robot can timely detect the safety hazards caused by external factors during the construction process of the foundation pit. The project is a very important one for deep pits and complex pits. This project provides a good reference case for deep foundation pits and foundation pit projects in complex environments.
19 December 2023 in Advances in Engineering Technology Research
The geological conditions of the landslide area in a near-dam reservoir area of a water conservancy hub project are complicated, and the stability problem of the landslide body is prominent, which is not only directly related to the safety of the adjacent office building and highway, but also poses a threat to the normal operation of the water conservancy hub. According to the latest geological data of the landslide area, the results of the stability calculation of the landslide body are analyzed, and the reinforcement design scheme of circular chair type anti-slide piles & prestressed anchor cables is proposed for the landslide body to solve the problem of anti-slide stability of the landslide body. Numerical analysis results show that: the safety factor under each working condition after reinforcement is within the permissible range and meets the relevant normative requirements, the landslide body has good control effect on deformation after reinforcement, and the reinforcement measures can provide certain reference value for the design and construction of similar projects.