Over recent years, the independent adoption of lean construction and building information modeling (BIM) has shown improvements in construction industry efficiency. Because these approaches have overlapping concepts, it is thought that their synergistic adoption can bring many more benefits. Today, implementing the lean–BIM theoretical framework is still challenging for many companies. This paper conducts a comprehensive review with the intent to identify prevailing interconnected lean and BIM areas. To this end, 77 papers published in AEC journals and conferences over the last decade were reviewed. The proposed weighting matrix showed the most promising interactions, namely those related to 4D BIM-based visualization of construction schedules produced and updated by last planners. The authors also show evidence of the lack of a sufficiently integrated BIM–Last Planner System® framework and technologies. Thus, we propose a new theoretical framework considering all BIM and LPS interactions. In our model, we suggest automating the generation of phase schedule using joint BIM data and a work breakdown structure database. Thereafter, the lookahead planning and weekly work plan is supported by a field application that must be able to exchange data with the enterprise resource planning system, document management systems, and report progress to the BIM model.
30 November 2015 in Journal of Intelligent Manufacturing
Over the last decade, the construction industry has suffered from various issues affecting the planning processes, team management, and decision-making during the design phase. Today, the concepts of Lean construction and Building Information Modeling (BIM) overlap and bring solutions to all phases of a construction project. Numerous studies have shown that leveraging BIM data through Lean principles can significantly improve the overall management of a project. However, the literature is still limited to optimizing the design phase to anticipate any deviation before the start of the work. This article aims to provide an updated review of the interaction between BIM and Lean in the design phase. The study is based on a systematic review of 61 articles selected using the Systematic Literature Review (SLR) approach. The obtained results allowed for the analysis of different Lean methods and tools that interact with BIM. Digitizing these methods and using them together is necessary to facilitate their application in a construction project. Finally, our study provides recommendations for researchers and professionals by identifying future scientific challenges.
1 July 2010 in IEEE Transactions on Instrumentation and Measurement
This paper presents postprocessing based on neural network (NN) models to reconstruct the magnetic near-field profile with an improved spatial resolution for one or different frequencies. The models aim at decreasing the time required to perform near-field electromagnetic compatibility (EMC) measurements. The multilayer perceptron (MLP) NNs are used to determine the magnetic near field radiated by passive devices and power electronics components. An optimization method, called the split-sample method, is implemented to determine the structures of the NN. The results obtained with the proposed method are compared with the measurement results. A graphic interface (GUI) is created to simplify the utilization of the developed NN models.
9 September 2009 in IEEE Transactions on Electromagnetic Compatibility
This paper presents a novel technique for modeling the electrostatic discharge snapback phenomenon in integrated circuits (ICs). The macromodel is built using standard components: BSIM3v3.2 model for the MOSFET, a bipolar transistor modeled by Mextram 504.7, and a substrate resistor. The IC under test is characterized by its die and package impedance. The model should allow easier simulation program with IC emphasis implementation, high simulation speed, less convergence issues, and wider availability of a gate-grounded n-type MOSFET protection device. Our model determines the interaction between the protection device and the internal circuitry of the IC. The model parameters are extracted with MATLAB script. Simulation results are compared with transmission-line pulsing measurement for a voltage regulator NCV4949 and a controller area network transceiver TLE6250G.
Despite the great potential of LPS and BIM to improve construction project productivity, the full integration of these modern production and information management systems at the data processing level is not yet achieved. After matching the literature to empirical studies in a Constructive Research Approach, it emerged that very few studies have investigated how buildings’ data could be preserved and continuously evolve during the project lifecycle. Accordingly, we underline the potential role of data warehousing in rendering operational data as a strategic asset for decision making. These findings motivate the present research, which aims to capitalize on quantity surveying data in order to automate the generation of M & E installation schedules. This paper first introduces the system functional requirements. Then, it proposes a conceptual scheme for the planning data mart (a data warehouse subset dedicated to planning subject area). Furthermore, we shed light on the M & E fragnet standardization procedure and how data have been processed. Finally, we present the current software developments to demonstrate the feasibility of this concept.