Yongtao Shang

Mr. Yongtao Shang


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 January 2024 in Energy and Buildings
Verified
Journal Article
Open access
JZJiaolan Zhu
Jiaolan Zhu
JLJie Li
Jie Li
PLPing Liu
Ping Liu
YSYongtao Shang
Yongtao Shang
ZDZhikun Ding
Zhikun Ding
MAMorshed Alam
Morshed Alam

23 May 2024 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
PLPing Liu
Ping Liu
YSYongtao Shang
Yongtao Shang
XJXueqiang Jin
Xueqiang Jin

PLPing Liu
Ping Liu
YSYongtao Shang
Yongtao Shang
LZLei Zhang
Lei Zhang
Safety issues have always been of great concern to the metro construction industry. Numerous studies have shown that safety issues are closely related to the design phase. Many safety problems can be solved or improved by developing the design. This study proposes a structured identification method for safety risks based on the metro design specifications, journal literature, and expert experience. A safety knowledge base (KB) for the design was established to realize safety knowledge sharing and reusing. The KB has been developed into Building Information Modeling (BIM) software as an inspection plug-in to achieve automated analysis and retrieval of safety risks. The designers are provided with a visualization of risk components to locate and improve the pre-control measures of the design. Subsequently, the process of design for safety (DFS) database creation was demonstrated with a metro station project, and the feasibility of applying the KB to safety checking in BIM was verified. In response to the inspection results, safety risks in the construction phases can be eliminated or avoided by standardizing and improving the design.

7 May 2025 in PLOS ONE
Verified
Journal Article
Open access
PDF file
PLPing Liu
Ping Liu
XJXueqiang Jin
Xueqiang Jin
YSYongtao Shang
Yongtao Shang
JZJiaolan Zhu
Jiaolan Zhu
The collapse accidents under cut and cover method in metro station construction occurred frequently, leading to severe casualties and property damage. With increasing of metro station construction in China, more and more attention has been paid to collapse under cut and cover method. However, this subject is still not well studied and understood in China. To fill the research gap, this paper investigates collapse risk in the cut and cover method construction process using a multi-state fuzzy Bayesian network. Firstly, based on accident statistical analysis, 9 intermediate factors and 16 bottom factors of collapse were identified, and then a multi-state Fuzzy Bayesian network model was established based on these causative factors. Secondly, triangular fuzzy functions were utilized to fuzzily the data of nodes, and conditional probabilities were used to represent the uncertainty relationship between nodes. Additionally, an expert credibility-based survey method was employed to ensure the accuracy of node failure probability assessment. The method was applied to predict the risk of a case project using cut and cover method, and the results demonstrated that the probabilities of no-failure, moderate-failure, and severe-failure were 71%, 19%, and 10%, respectively. Sensitivity analyses of multi-states were performed to identify the key causal factors for moderate and severe collapse. The method can be used to predict the risk probability and key causal factors for collapse accidents. The result can provide decision support for cut and cover method construction, which could contribute to reducing the occurrence of collapse.

23 September 2025 in Journal of the Chinese Institute of Engineers
Verified
Journal Article
Closed access
PLPing Liu
Ping Liu
YSYongtao Shang
Yongtao Shang
XJXue-Qiang Jin
Xue-Qiang Jin