Hye kyung Lee

Dr. Hye kyung Lee


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 November 2018 in Sustainability
Verified
Journal Article
Open access
PDF file
MSMin Ho Shin
Min Ho Shin
HLHye kyung Lee
Hye kyung Lee
HKHwan Yong Kim
Hwan Yong Kim
Recent technological improvements have made substantial changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM), open up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so on. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction. The total upfront costs required to provide a BIM for the seven projects was $116,348. On the other hand, the total costs required to fix the errors in the seven projects was $166,486. This can be regarded as the benefit of using BIM, because if BIM was implemented then the associated errors could easily be replaced. Therefore, the benefit–cost ratio can be estimated as 1.32 for one-month delay and 1.36 for a three-month delay.

1 October 2018 in Preprints.org
Verified
Preprint
Open access
PDF file
MSMin Ho Shin
Min Ho Shin
HLHye kyung Lee
Hye kyung Lee
HKHwan Yong Kim
Hwan Yong Kim
Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction. The total upfront costs required to provide a BIM for 7 projects were $116,348. On the other hand, the total costs required to fix the errors in 7 projects were $166,486. This can be regarded as the benefits of using BIM because if BIM was implemented then the associated errors are easily replaced. Therefore, the benefit-cost ratio can be estimated as 1.32 for one-month delay and 1.36 for a three-month delay.