20 August 2018 in MATEC Web of Conferences
Verified
Journal Article
Open access
ALAzary Lapidus
Azary Lapidus
IAIvan Abramov
Ivan Abramov
To streamline construction planning, one needs to assess and perform trial modeling of organizational and process-related factors impacting the final planned performance indicators. A proper calendar plan, one that would take due account of said factors, has a substantial impact on the efficiency and, sometimes, even the feasibility of a construction project as a whole. Therefore, the purpose of this paper’s research is to develop a method for determining optimum technical and economic parameters. A method should be considered legitimate which, given the labour intensity of the jobs assigned to a crew and the list of such jobs, makes it possible to determine the time said jobs will take to perform depending on the variation of the following factors: crew/unit numbers, job synchronization degree, job performance sequence, number of shifts and unit productivity. The authors have studied the algorithm and the method for the trial modeling of organizational and process-related factors when developing a calendar plan in order to identify qualitative time-specific and feasibility parameters. The paper reviews the example of how the optimum performance timelines for each crew can be determined.

6 March 2018
Verified
Conference Paper
Open access
ALAzary Lapidus
Azary Lapidus
IAIvan Abramov
Ivan Abramov
Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).

12 June 2018 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
ALAzariy Lapidus
Azariy Lapidus
IAIvan Abramov
Ivan Abramov
Dynamic development of the construction manufacturing and technology industry requires new strategies based on integrated solutions for consolidated tasks and objectives. A large-scale construction project technology is a complex integrated process with a great number of interrelated parties involved. This process is associated with links and factors of various nature and frequency that introduce significant changes in the technology resulting in violations of the set pace. The main features of a systemically important large-scale construction project can be optimized through identification of destabilizing factors and formalization of links within the project with due regard for an integrated approach to production processes. The current situation calls for integrated tackling of construction projects with a view to minimize labor costs and contingencies and, accordingly, to improve the key performance indicators, including, but not limited to, a reduced duration of construction, an enhanced quality, and a higher reliability and lower costs of works. This article deals with various lines of research for an initial stage of development of the concept of a systematic and integrated method of implementation of large-scale construction projects. Depending on the problem to be solved, research may be focused on combination of associated production processes; formation of integrated production crews and teams; identification of a reliability factor of a structural subdivision; reallocation of manpower following changes in skills; improved performance quality indicators of integrated production crews and teams. This research needs to be described with the use of mathematical tools formalizing a systematic and integrated method. Consistent and predictable results can be achieved more efficiently and successfully if activities are concerted and all processes are interrelated and oriented on a shared objective.

1 February 2020 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
ALA Lapidus
A Lapidus
IAIvan Abramov
Ivan Abramov
A construction company is a dynamic system capable of transforming and passing from one quality state to another while retaining its system quality due to its properties including: - Effectiveness – ability to produce a result and to create products required by consumers; - Flexibility – ability of the production system to adapt to ever-changing external environment; - Durability – ability of the production system to produce results over a long period; - Manageability – acceptability of temporary changes in functional processes in the desired direction influenced by control action; - Reliability manifested in sustainable functioning that is ensured by the management system, cooperation with other production systems, and internal reserves. In this connection, the authors of this article have set an objective of selecting a descriptive and effective instrument of estimating losses of statistical control and, accordingly, the targeted sustainability of a construction company at the current stage of economic development in this country. They also expand on the notion of functional sustainability of construction companies as a dynamic production system. This article is focused on development of recommendations with a view of achieving the targeted functional sustainability level of construction companies in present-day conditions and disturbances. Therefore, sustainability is examined in this article as a multidimensional emergent property of a construction company viewed as a dynamic cybernetic system designed to manufacture construction products and to maintain its systemic quality in interaction with production processes.

1 September 2019 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
ALA.A. Lapidus
A.A. Lapidus
IAIvan Abramov
Ivan Abramov
In the last few decades, the Russian construction market has seen competition grow fierce among contractors. All of the market players strive to surpass their competitors, while the clients face a serious task of organizing the bidding procedures in keeping with internal regulations and in line with the federal law on procurement. This paper suggests a mathematical model which uses the systemic integrated approach to evaluate the resource potential of a construction company participating in the procurement process. To this effect, research of international procurement experience has been conducted and its findings have enabled the authors to outline and assess the key factors shaping the behavior of the suggested model. As a result of the research, recommendations have been developed for an efficient systemic integrated evaluation of the resource potential of a construction company in order to improve the quality of procurement processes in the construction sector.

28 November 2016 in MATEC Web of Conferences
Verified
Journal Article
Open access
PDF file
IAIvan Abramov
Ivan Abramov
TPTatiana Poznakhirko
Tatiana Poznakhirko
ASAlexandr Sergeev
Alexandr Sergeev
MATEC Web of Conferences, open access proceedings in Materials science, Engineering and Chemistry