In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim to tighten the models’ representations. One of them is based on dominance rules from the literature. Then, we provide the results of extensive computational experiments used to measure the performance of the proposed MILP models. They are shown to be able to solve optimally instances until the size 40-job and even several larger problem classes, with up to 60 jobs. Furthermore, we can distinguish the effect of the minimal time lags and the inclusion of the valid inequalities in the basic MILP model on the results.
11 June 2022 in Journal of Combinatorial Optimization
In this paper, we investigate the m-machine permutation flowshop scheduling problem where minimal and maximal time lags are required between consecutive operations of each job. Such problem has not been studied extensively in the scheduling literature. The objective is to minimize the makespan. We propose a mathematical formulation for this problem; it is solved by running commercial software CPLEX using many instances randomly generated. Then, we propose a Genetic Algorithm and we perform a computational analysis. The results of numerical experiments show that our proposed Genetic algorithm performs very well.
1 September 2020 in Journal of the Operations Research Society of China
The cross-docking center is an intermediate node in a distribution network, it presents a great advantage especially for perishables as it provides fast customers deliveries without storage in between or less than 24 hours. Receiving shipments from different suppliers, sorting them according to their characteristics, and transferring them to different demand points in the minimum standby time requires many operations. Reaching this goal leads to optimize a combination of a hybrid flowshop scheduling problem during the cross-docking process from inbounding to outbounding and a Vehicule Routing Problem (VRP) from the outbound trucks of the cross-docking center to the customers. The makespan is the objective to be minimized in this research. To solve such original problem, two matheuristics are proposed where each of them is based on two phases that combine the strengths of the linear programming and the heuristic algorithms. Indeed, we determine a set of variables in the first phase which will be used in the second phase to find the makespan value. Finally, computational experiments on instances from the literature and newly generated are reported and show the good performance of the proposed methods to solve large instances in a very competitive running time.