A maximum power point tracking (MPPT) technique plays an important role to ensure maximum photovoltaic (PV) output power is extracted under stochastic weather conditions. The research to date tends to focus on developing a standalone optimization MPPT algorithm rather than looking into a hybrid MPPT algorithm. This paper introduces particle swarm optimization (PSO) to optimize the maximum PV output power and to determine the best design variable for penalising the step size of the conventional methods namely the perturb and observe (PO) and the incremental conductance (IC). With the help of the hybrid MPPT algorithm (PSO+IC and PSO+PO), the step size is no longer fixed, and it is changing according to the solar irradiance. To evaluate the proposed hybrid algorithm, a single-stage grid connected PV system is designed for several different scenarios with various weather conditions. The performance of the hybrid MPPT algorithm and the conventional methods is compared. The results demonstrate that the hybrid MPPT algorithm is remarkably better than the conventional methods in terms of the output power ripple and the settling time.
Load frequency control (LFC) in a power system plays an important role to ensure system frequency and the desired demand or output power in an interconnected network is regulated and able to control the change when it is subjected to load disturbance. The research to date has tended to focus on a proportional-integral-derivative (PID) controller to optimise the performance of the network rather than looking into hybrid optimisation techniques. In this paper, three metaheuristic algorithms namely the particle swarm optimisation (PSO), the artificial bee colony optimisation (ABC), and the grey wolf optimisation (GWO) are employed to optimise the selection of the linear quadratic regulator (LQR). These three methods are then evaluated and the outcomes suggest that PSO+LQR and GWO+LQR provide a significant performance improvement of the LFC in terms of the steady-state frequency deviation, the settling time, and the rise time.
In classical power systems, frequency measurements are transferred via a specialised communication channel, resulting in time delay. The time delay plays a major role in a power system, which can reduce the dynamic performance of the load–frequency control (LFC) system and can destabilise the system. The research to date has tended to focus on developing a new algorithm to determine the delay margin (DM) rather than looking into a hybrid algorithm which includes a nature-inspired metaheuristic optimisation technique. This paper introduces a novel method for computing the DM based on grey wolf optimisation (GWO), specifically for the constant time delay. In the proposed method, GWO is employed to optimise the minimum error of the spectral radius and to determine the best design variable of the crossing frequency. With the help of the proposed method, the sweeping range is no longer required, which improves the accuracy of the result. To evaluate the proposed method, a two-area network power system is considered as a case study. Furthermore, the effect of the PI controller gains on the DM is taken into account. The proposed method efficacy is demonstrated by comparing it with the most recently published methods. The results demonstrate that the proposed method is remarkably better than the existing methods found in the literature, where the smallest percentage inaccuracy using the simulation-based DM based on GWO is found to be 0.000%.
This paper presents three types of optimisation techniques namely particle swarm optimisation, artificial bee colony optimisation, and grey wolf optimisation. These optimisation approaches are employed to determine the optimal voltage collapse point (VCP) of the power system weakest bus without having to perform several power flow calculations. Moreover, this study is employed in the simplified Department of Electrical Services (DES) network in Brunei Darussalam. The optimality of the results is aided with reactive power-voltage (QV) modal analysis. Furthermore, the results obtained from the employed methods were compared with the results obtained from power system simulator for engineering (PSSE) 34 software. In the end, the results of each analysis were discussed and compared to show its effectiveness in determining the VCP of the weakest bus.
Load flow analysis plays an important role to forecast power system operation planning, economic scheduling, and reconfiguration of power network. In this paper, a study for load flow analysis in a typical power network in Brunei Darussalam is presented. The modelling and simulation of the actual power network is employed in the MATLAB with modified the scripts of the - 30 bus system IEEE script and compared with power system simulator engineering (PSSE/34) software. In addition, a comparison of load flow analysis involving with and without transformer tap changer and vector group is also presented in this paper. It was found that the load flow results were improved by employing the transformer tap changing and their phase-shift vector groups into the network.