Stephan Biller

Prof. Dr. Stephan Biller

Industrial Engineering, Purdue University West Lafayette, West Lafayette, Indiana, USA
+1
orcid

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 July 2012 in IEEE Transactions on Automation Science and Engineering
Verified
Journal Article
Closed access
GCGuorong Chen
Guorong Chen
LZLiang Zhang
Liang Zhang
JAJorge Arinez
Jorge Arinez
SBStephan Biller
Stephan Biller
Control of production operations is considered as one of the most economical methods to improve energy efficiency in manufacturing systems. This paper investigates energy consumption reduction in production systems through effective scheduling of machine startup and shutdown. Specifically, we consider serial production lines with finite buffers and machines having Bernoulli reliability model. This machine reliability model is applicable in production situations, where the downtime is relatively short and comparable to machine cycle time (e.g., automotive paint shops and general assembly). In this paper, using transient analysis of the systems at hand, an analytical performance evaluation technique is developed for Bernoulli serial lines with time-dependent machine efficiencies. In addition, tradeoff between productivity and energy-efficiency in production systems is discussed and the energy-efficient production problem is formulated as a constrained optimization problem. The effects and practical implications of operations schedule are demonstrated using a numerical study on automotive paint shop operations. Note to Practitioners - This paper develops an effective analytical tool to evaluate the performance of production systems with time-varying parameters of machine reliability. Using this tool, production engineers and managers can predict the performance of the production systems in real-time with high accuracy. In addition, based on this tool, production operators can determine the machine startup and shutdown schedule based on the current status of the line and production requirement. Numerical experiments show that significant energy savings can be obtained by applying effective machine operations schedule.

27 January 2012 in IEEE Transactions on Automation Science and Engineering
Verified
Journal Article
Closed access
Alberto VergnanoAlberto Vergnano
Alberto Vergnano
CTCarl Thorstensson
Carl Thorstensson
BLBengt Lennartson
Bengt Lennartson
PFPetter Falkman
Petter Falkman
MPMarcello Pellicciari
Marcello Pellicciari
SBStephan Biller
Stephan Biller
Reduction of energy consumption is important for reaching a sustainable future. This paper presents a novel method for optimizing the energy consumption of robotic manufacturing systems. The method embeds detailed evaluations of robots' energy consumptions into a scheduling model of the overall system. The energy consumption for each operation is modeled and parameterized as function of the operation execution time, and the energy-optimal schedule is derived by solving a mixed-integer nonlinear programming problem. The objective function for the optimization problem is then the total energy consumption for the overall system. A case study of a sample robotic manufacturing system and an experiment on an industrial robot are presented. They show that there exists a real possibility for a significant reduction of the energy consumption in comparison to state-of-the-art scheduling approaches.

1 May 2013 in IIE Transactions
Verified
Journal Article
Closed access
LZLiang Zhang
Liang Zhang
CWChuanfeng Wang
Chuanfeng Wang
JAJorge Arinez
Jorge Arinez
SBStephan Biller
Stephan Biller
Transient behavior of production systems has significant practical and theoretical implications. However, analytical methods for analysis and control of production systems during transients remain largely unexplored. In the framework of serial production lines with Bernoulli machines and finite buffers, this article develops a mathematical model for transient analysis and derives closed-form expressions for evaluating the production rate, consumption rate, work-in-process, and probabilities of machine starvation and blockage during transients. In addition, a computationally efficient procedure based on recursive aggregation is developed to approximate the transient performance measures with high accuracy. Finally, based on the mathematical model derived, system-theoretic properties of several important system transient characteristics are studied.

1 April 2005 in Electronic Commerce Research
Verified
Journal Article
Closed access
PDF file
SBStephan Biller
Stephan Biller
LCLap Mui Ann Chan
Lap Mui Ann Chan
DSDavid Simchi-Levi
David Simchi-Levi
JSJulie Swann
Julie Swann

7 February 2007 in Journal of Manufacturing Science and Engineering
Verified
Journal Article
Closed access
PDF file
QCQing Chang
Qing Chang
JNJun Ni
Jun Ni
PBPulak Bandyopadhyay
Pulak Bandyopadhyay
SBStephan Biller
Stephan Biller
GXGuoxian Xiao
Guoxian Xiao
Timely performance of preventive maintenance (PM) tasks is a critical element of manufacturing systems. Since the majority of PM tasks requires that equipment be stopped, these tasks can generally only be performed during nonproduction shifts, breaks, or other scheduled downtime. Thus, there is a trade-off between time dedicated to production and time available for preventive maintenance. One approach to mitigate this trade-off is to perform maintenance during scheduled production time by strategically shutting down equipment for short time periods. This research developed a systematic method on when to shut down equipment to do maintenance in an automotive assembly environment. It is called maintenance opportunity. The method incorporated real-time information about production and machine failure conditions. A simulation-based algorithm is developed by utilizing the buffer contents as well as machine starvation and congestion to obtain maintenance opportunities during production time.

13 August 2009 in International Journal of Production Research
Verified
Journal Article
Closed access
LLLin Li
Lin Li
QCQing Chang
Qing Chang
JNJun Ni
Jun Ni
SBStephan Biller
Stephan Biller
Variability is a key characteristic for evaluating the performance of a process. Small variability for a bottleneck machine can generate high production variability. Short-term production analysis and bottleneck identification are imperative for enabling optimal response to dynamic changes within the system. In comparison to the rich and abundant literature available on long-term analysis, only a small section of the literature addresses the dynamic bottleneck control policies, which may be used to maximise sustainable benefits. In this paper, a real time bottleneck control method is introduced to efficiently utilise the finite manufacturing resources and to mitigate the short-term production constraints by using two practical approaches: initial buffer adjustment and maintenance task prioritisation. The objective for real time bottleneck control is to obtain a continuous production improvement towards a balanced-line status to increase the throughput efficiently. The benefits of this method are presented by considering an industrial case study of an automotive assembly line. The results obtained from this case study show significant production improvements as compared to traditional approaches.