Lu Jin

Dr. Lu Jin

Energy & Environmental Research Center (EERC), University of North Dakota, Grand Forks, ND, USA

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2017 in Applied Energy
Verified
Journal Article
Closed access
Lu JinLu Jin
Lu Jin
SHSteven Hawthorne
Steven Hawthorne
JSJames Sorensen
James Sorensen
LPLawrence Pekot
Lawrence Pekot
BKBethany Kurz
Bethany Kurz
JHJohn Harju
John Harju

29 November 2022 in Energy & Fuels
Verified
Journal Article
Closed access
JZJin Zhao
Jin Zhao
Lu JinLu Jin
Lu Jin
NANicholas A. Azzolina
Nicholas A. Azzolina
XWXincheng Wan
Xincheng Wan
XYXue Yu
Xue Yu
KLKegang Ling
Kegang Ling

1 December 2021 in International Journal of Greenhouse Gas Control
Verified
Journal Article
Closed access
CBCésar Barajas-Olalde
César Barajas-Olalde
AMAlan Mur
Alan Mur
DADonald C. Adams
Donald C. Adams
Lu JinLu Jin
Lu Jin
JHJun He
Jun He
CGCharles D. Gorecki
Charles D. Gorecki

4 November 2022 in Energies
Verified
Journal Article
Open access
PDF file
Xincheng WanXincheng Wan
Xincheng Wan
Lu JinLu Jin
Lu Jin
Nicholas AzzolinaNicholas Azzolina
Nicholas Azzolina
SBShane K. Butler
Shane K. Butler
XYXue Yu
Xue Yu
JZJin Zhao
Jin Zhao
Reservoir simulation for unconventional reservoirs requires proper history matching (HM) to quantify the uncertainties of fracture properties and proper modeling methods to address complex fracture geometry. An integrated method, namely embedded discrete fracture model–artificial intelligence–automatic HM (EDFM–AI–AHM), was used to automatically generate HM solutions for a multistage hydraulic fracturing well in the Wolfcamp Formation. Thirteen scenarios with different combinations of matrix and fracture parameters as variables or fixed inputs were designed to generate 1300 reservoir simulations via EDFM–AI–AHM, from which 358 HM solutions were retained to reproduce production history and quantify the uncertainties of matrix and hydraulic fracture properties. The best HM solution was used for production forecasting and carbon dioxide (CO2)-enhanced oil recovery (EOR) strategy optimization. The results of the production forecast for primary recovery indicated that the drainage area for oil production was difficult to extend further into the low-permeability reservoir matrix. However, CO2 EOR simulations showed that increasing the gas injection rate during the injection cycle promoted incremental oil production from the reservoir matrix, regardless of minimum miscibility pressure. A gas injection rate of 25 million standard cubic feet per day (MMscfd) resulted in a 14% incremental oil production improvement compared to the baseline scenario with no EOR. This paper demonstrates the utility of coupling reservoir simulation with artificial intelligence algorithms to generate ensembles of simulation cases that provide insights into the relationships between fracture network properties and production.

1 July 2021 in Journal of Natural Gas Science and Engineering
Verified
Journal Article
Closed access
Bao JiaBao Jia
Bao Jia
Lu JinLu Jin
Lu Jin
SSSteve A. Smith
Steve A. Smith
NBNicholas W. Bosshart
Nicholas W. Bosshart

16 June 2009
Verified
Conference Paper
Closed access
PDF file
Lu JinLu Jin
Lu Jin
AWA.K. Wojtanowicz
A.K. Wojtanowicz
RHR.G. Hughes
R.G. Hughes
Water coning is a serious problem in maturing reservoirs with bottom water drive where depleted oil strata overlays sizable water zone. The resulting high values of water cut and minimal oil rate lead to early shut downs of the wells without sufficient recovery of hydrocarbons in place. Over many years, reservoir engineers have looked for some effective ways to control water coning, but only a few successful oil field examples have been reported. Usually, in the presence of bottom water wells are completed in the upper section of the pay zone and produce oil below its critical rate in order to prevent or delay water coning. Typically, however, the critical rate is too low to be economical so that high water cut becomes inevitable. Downhole water sink (DWS) technology --- a relatively new and effective method to control water coning --- has been increasingly considered by engineers worldwide. Theoretical calculations and field practice have shown that DWS can improve oil production rate, reduce water cut, and increase oil productivity index of a well. However, the technique requires draining and lifting of large amounts of water from the aquifer, which increases the cost of production. In order to solve the DWS water lifting problem, a new water coning control method is developed --- downhole water loop (DWL) installation. It has the same advantages as the DWS technique but it does not need to lift water to the surface. This paper addresses feasibility of DWL installation and analytically examines the mechanism of producing water-free oil from the DWL from the bottom water drive reservoirs. The DWL feasibility is tested with a simple analytical model derived in this study. Also, a good match is obtained when comparing the model --calculated data to real production data. Introduction: Oil reservoirs with bottom water drive have high oil recovery due to supplemental energy from the aquifer. When the oil production rate exceeds critical rate, water is also produced due to the upwards invasion of the oil-water contact known as water coning. After the water enters the well completion (breakthrough) it may finally cause a part of oil bypassed. In order to control the coning problem, many authors had investigated the mechanism and developed methods to calculate critical rate, predict breakthrough time and reduce water cut (Muskat and Wyckoff, 1935; Elkins, 1958; Fortunati, 1962; Karp et al., 1962; Smith and Pirson, 1963; Chierici et al., 1964; Romero-Juarez, 1964; Kuo et al, 1983; Wojtanowicz, 1995; Gunning et al, 1999; Ould-amer and Chikh, 2004; Utama, 2008 and so on). It has been established that each reservoir-well system would give a maximum water-free oil production rate (critical rate) and for higher rates there would be a time period (breakthrough time) needed for the bottom water to reach the well's oil completion. After the breakthrough, the water phase would progressively dominate the total production.