Manufacturing systems producing multiple products are common in many industries, where products are made from several parts and/or sub-assemblies that require machining operations in first stage and assembly operations at later stage. Several scheduling techniques are proposed in the literature for such manufacturing system to develop near optimal schedule. A disruption in the manufacturing necessitates adjusting previously planned schedule which is known as real-time scheduling. This paper presents a comparative evaluation of different scheduling methods proposed by different investigators for dealing such situations. The literature indicates that real-time scheduling of manufacturing system with machining and assembly operations is hardly attempted. The paper offers a framework for developing rescheduling methodologies for such manufacturing situations.
Industrial pressure relief valves must function reliably and effectively to protect pressurized systems from excessive pressure conditions. These valves are essential safety devices that act as cushions to protect piping systems, equipment, and vessels from the risks of high pressure, which can cause damage or even explosions. The objectives of this study were to minimize valve failures, decrease the number of rejected valves in the production line, and enhance the overall quality of pressure relief valves. This work introduces an integrated quality improvement methodology known as the hybrid multi-criteria decision-making (MCDM)—failure mode and effects analysis (FMEA) approach. This approach is based on prioritizing crucial factors for any failure modes in the industrial setting. The presented case study demonstrates the application of a hybrid approach for identifying the fundamental causes of industrial pressure relief valve failure modes and malfunctions. This investigation highlights the applicability of FMEA as a methodology for determining causes and executing remedial actions to keep failures from happening again. FMEA helps uncover the underlying causes of industrial pressure relief valve failures, while the integration of the hybrid MCDM methodology enables the application of four integrated MCDM methods to identify crucial factors. The adopted model addresses the shortcomings of the conventional FMEA by accurately analyzing the relationships between the risk factors and by utilizing several MCDM methods to rank failure modes. Following the application of the adopted methodology, it was discovered that the high-risk failure modes for the pressure relief valve included misalignment of wire, normal wear/aging, rejection of machined parts, mismatch of mating parts, and corrosion. Therefore, risk managers should prioritize developing improvement strategies for these five failure modes. Similarly, failures comprising debris, delayed valve opening, internal leakage, premature valve opening, and burr foreign particles were determined as second essential groups for improvement.
There is a manufacturing system where several parts are processed through machining workstations and later assembled to form final products. In the event of disruptions such as machine failure, the original flow-shop schedule needs to be revised and/or rescheduled. In such a scenario, rescheduling methods based on right-shift rescheduling and affected operations rescheduling work very well. Here in this study, the deviation of the make-span of the revised schedule from the original schedule is used as a performance measure. We have proposed three rescheduling methods. There are multiple factors that influence the performance of the rescheduling methodology. One of them is the make-span deviation of the schedule, and the factors influencing it are optimality of the initial solution, failure duration, deviation of make-span, rescheduling method, size, and instant of failure. The initial schedule and problem size depend on the flow-shop manufacturing system for which scheduling is performed, but the method of rescheduling depends on the decision as to which rescheduling methodology is to be selected. Computations are performed using full factorial experimentation. We also observed that right-shift rescheduling is the preferred rescheduling method in the majority of situations. In contrast, the affected operation rescheduling method is also equally suitable when the initial solution is created using modified bottleneck minimum idleness.
1 January 2012 in International Journal of Industrial Engineering Computations
MONEL 400, widely used in industries such as high-temperature applications, chemical processing, automotive, and marine sectors, presents significant machining challenges due to its high strength and tendency for work-hardening. This research explores powder-mixed electrical discharge machining (PMEDM), a modern technique incorporating conductive metal powders, specifically graphite and silicon, combined with dielectric fluid to improve machining performance. The study investigates into how to machine MONEL 400 with copper as the cathode, focusing on important process parameters such as powder concentration, peak-current, and pulse on duration. This study also compared impact of PMEDM to conventional EDM, and results demonstrated improvements in material removal rate, tool wear rate, and surface roughness. Graphite powder significantly reduced tool wear, while silicon powder significantly enhanced surface finish. Using Buckingham’s theorem and regression analysis, this study presented semi-empirical models for the rate of material removal and looks at how the powder additives’ dielectric properties have changed to improve performance. The research aims to improve sustainable machining practices while providing environmental benefits.
1 April 2014 in Journal of The Institution of Engineers (India): Series C