Ensemble precipitation forecasts (EPFs) derived from single numerical weather predictions (NWPs) often miss extreme events, and individual hydrological models (HMs) often fail to accurately capture all types of flows, including flood peaks. To address these shortcomings, this study introduced four “EPF + HM” schemes for ensemble flood forecasting (EFF) by combining two EPFs and two HMs. A generator-based post-processing (GPP) method was applied to correct biases and under-dispersion within the raw EPF data. The effectiveness of these schemes in delivering high-quality flood forecasts was assessed using both deterministic and probabilistic metrics. The results indicate that, once post-processed by GPP, all proposed schemes show improvements in both deterministic and probabilistic performances, with skillful flood forecasts for 1–7 lead days. The deterioration in forecast performance with extended lead times is also lessened. Notably, the results indicate that uncertainty within hydrological models has a more pronounced impact on capturing flood peaks than uncertainty in precipitation inputs. This study recommends combining individual EPF with multiple hydrological models for reliable flood forecasting. In conclusion, effective flood forecasting necessitates employing post-processing techniques to correct EPFs and accounting for the uncertainty inherent in hydrological models, rather than relying solely on the uncertainty of the input data.
The number of numerical weather prediction (NWP) models is on the rise, and they are commonly used for ensemble precipitation forecast (EPF) and ensemble streamflow prediction (ESP). This study evaluated the reliabilities of two well-behaved NWP centers in the Observing System Research and Predictability Experiment (THORPEX) Interactive Grand Global Ensemble (TIGGE), the European Centre for Medium-Range Weather Forecasts (ECMWF) and the National Centers for Environmental Prediction (NCEP), in EPF and ESP over a mountain river basin in China. This evaluation was carried out based on both deterministic and probabilistic metrics at a daily temporal scale. The effectiveness of two postprocessing methods, the Generator-based Postprocessing (GPP) method, and the Bayesian Model Averaging (BMA) method were also investigated for EPF and ESP. Results showed that: (1) The ECMWF shows better performances than NCEP in both EPF and ESP in terms of evaluation indexes and representation of the hydrograph. (2) The GPP method performs better than BMA in improving both EPF and ESP performances, and the improvements are more significant for the NCEP with worse raw performances. (3) Both ECMWF and NCEP have good potential for both EPF and ESP. By using the GPP method, there are desirable EPF performances for both ECMWF and NCEP at all 7 lead days, as well as highly skillful ECMWF ESP for 1~5 lead days and average moderate skillful NCEP ESP for all 7 lead days. The results of this study can provide a reference for the applications of TIGGE over mountain river basins.