Đorđe Nenad Lazović

Mr. Đorđe Nenad Lazović

Power System Department, University of Belgrade, School of Electrical Engineering, Belgrade, Beograd, Serbia
orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 April 2023 in Energies
Verified
Journal Article
Open access
PDF file
Đorđe Nenad LazovićĐorđe Nenad Lazović
Đorđe Nenad Lazović
Zeljko DjurisicZeljko Djurisic
Zeljko Djurisic
Future power systems with a high share of intermittent renewable energy sources (RES) in the energy portfolio will have an increasing need for active power balancing. The integration of controllable and more flexible distributed energy resources (DERs) at the distribution-grid level represents a new solution and a sustainable alternative to conventional generation units for providing balancing services to the transmission system operator (TSO). Considering that the extensive participation of DERs in ancillary services may lead to the violation of limits in the distribution network, the distribution system operator (DSO) needs to have a more active role in this process. In this paper, a framework is presented that allows the DSO, as the central coordinator of the aggregators, to participate in the balancing market (BM) as a balancing service provider (BSP). The developed mathematical model is based on the mixed-integer second-order cone programming (MISOCP) approach and allows for determination of the limits of active power flexibility at the point of the TSO–DSO connection, formation of the dependence of the price/quantity curve, and achievement of the optimal dispatch of each DER after clearing the balancing market. The simulation results are presented and verified on modified IEEE distribution networks.

31 January 2026 in Energy Conversion and Management: X
Verified
Journal Article
Open access
Đorđe Nenad LazovićĐorđe Nenad Lazović
Đorđe Nenad Lazović
ŽĐŽeljko Đurišić
Željko Đurišić

1 January 2024 in Energija Ekonomija Ekologija
Verified
Journal Article
Closed access
MJMilos Jecmenica
Milos Jecmenica
Đorđe Nenad LazovićĐorđe Nenad Lazović
Đorđe Nenad Lazović
In addition to fulfilling the conditions for choosing the optimal location, such as geographical location, meteorological parameters, as well as conditions for connection to the power grid, the techno-economic analysis represents an important aspect when planning, developing and exploiting projects in the field of renewable energy sources. Concretely, on the example of a wind park in the Republic of Serbia, a techno-economic analysis with basic indicators of the profitability and justification of the investment is presented. Through these indicators, an investment analysis of a wind park with a total installed capacity of 150 MW connected to the transmission network was carried out. The goal of the conducted analysis is to obtain basic financial indicators that can be important when choosing a location, planning an investment and sustainable exploitation of this and similar power projects.

1 January 2025
Verified
Conference Paper
Closed access
UFUniverzitet u Beogradu Elektrotehnički fakultet
Univerzitet u Beogradu Elektrotehnički fakultet
MŽMiroslav Žerajić
Miroslav Žerajić
TŠTodor Šiljegović
Todor Šiljegović
GCGo2Power Consulting
Go2Power Consulting
PGPavle Gorašević
Pavle Gorašević
Zeljko DjurisicZeljko Djurisic
Zeljko Djurisic
During the process of decarbonizing electricity production in the power system of Serbia, an intensive integration of wind power plants (WPPs) and photovoltaic power plants (PVPPs) connected to the transmission grid is planned. The analyses in this paper assume two scenarios regarding the installed capacities of renewable energy sources (RES) for the reference year 2030. According to the minimalist scenario, a total of 5200 MW is expected to be connected to the transmission grid by 2030, including 3200 MW from WPPs and 2000 MW from PVPPs. The maximalist scenario anticipates the connection of 7100 MW from WPPs and 3500 MW from PVPPs. For both scenarios, technical analyses were conducted to assess the capability of these sources to provide ancillary voltage control services in Serbia’s future power system. The calculations were based on real characteristics of WPPs and PVPPs in terms of their ability to absorb reactive power, as well as on the power production values calculations derived from available meteorological data for the target locations where these sources are planned. Additionally, an estimation of the production profiles of conventional power plants was conducted based on economic criteria while considering the need for balancing services. The calculations were performed on Serbia’s transmission grid model for a future state using DIgSILENT PowerFactory software. The analyses included the impact of reactive power absorption with the maximum available capacity of prospective RES on voltage reduction at all 400 kV and 220 kV transmission grid nodes.

1 January 2023
Verified
Conference Paper
Closed access
Đorđe Nenad LazovićĐorđe Nenad Lazović
Đorđe Nenad Lazović
KDKristina Džodić
Kristina Džodić
ASAleksandar Savić
Aleksandar Savić
VAVladimir Antonijević
Vladimir Antonijević
ŽĐŽeljko Đurišić
Željko Đurišić
DSDragan Surudžić
Dragan Surudžić
The paper deals with the optimal dispatching of Public Enterprise EPS production units for different scenarios of integrated RES capacities in the power system of Serbia for the current and future circumstances in 2030. To solve this complex optimization problem, we applied an approach that decomposes the power generation scheduling problem into two subproblems: seasonal and daily optimization. The ANTARES software tool intended for economic and adequacy analysis was used to determine: the strategy of seasonal water use from reservoir power plants, optimal seasonal operation of pumped storage hydropower plants, and the unit commitment of thermal power plans. This tool solves the problem of optimal engagement of production units to minimize system operating costs while respecting the defined techno-economic limitations. The results of the seasonal optimization are the input data for the second step, that is, day-ahead economic dispatch, taking into account the required level of secondary and tertiary reserves. Software developed at the School of Electrical Engineering in Belgrade was used to solve this optimization problem. Based on the established methodology and software, the optimal engagement of EPS production units for the existing and future cases in terms of installed RES capacities was calculated. Calculations were made for typical years in terms of hydrology.

1 January 2024 in Energija Ekonomija Ekologija
Verified
Journal Article
Closed access
VAVesna Abadic
Vesna Abadic
MŽMiroslav Žerajić
Miroslav Žerajić
TŠTodor Šiljegović
Todor Šiljegović
GCGo2Power Consulting
Go2Power Consulting
PGPavle Gorašević
Pavle Gorašević
Zeljko DjurisicZeljko Djurisic
Zeljko Djurisic
The integration of renewable energy sources (RES) changes the current concept of power system operation and planning. In addition to significant changes in topology and the emergence of new large centres of electricity production, which affect the change in the dominant directions of power flows, the impact on voltage profile in the power system is also changing in terms of the possibility of RES participation in voltage control. Today's inverter technologies and power electronics in RES systems allow them to participate in voltage control to help maintain grid voltage within acceptable limits and are designed to provide voltage support and reactive power control. Modern wind turbines are capable of operating in a wide range of reactive power generation/absorption at different active power setpoints, as well as in no-wind regimes, while modern PV systems are capable of providing voltage control support and reactive power control even in conditions of absence of the primary energy source. By controlling output voltage and reactive power, such systems can help maintain proper voltage values in the grid. This paper will present the results of the analysis of the impact of RES on the voltage profile of the Serbian transmission system, for a period of one year, with an hourly resolution. The analysis will be carried out for two scenarios: the existing state of the transmission system with already connected RES and the future/prospective state of the transmission system that includes future/planned projects of connection of RES to the transmission system. By comparing the results for these two scenarios, it is possible to determine the impact of RES on the voltage profile in all operating conditions of the transmission system and the possibility of RES participation in voltage control in the transmission system of Serbia.