This paper aims to analyze the main causes of disputes which occur in the construction industry. In order to reach this aim, a literature review was undertaken to identify the common construction disputes. The disputes derived from a cross-section of the literature, were classified into main categories and the main causes of construction disputes were determined. Finally, an analysis was carried out using the analytical network process (ANP) approach to determine their relative importance
The challenging idea of using drones in last-mile delivery systems of logistics addresses a new routing problem referred to as the traveling salesman problem with drone (TSP-D). TSP-D aims to construct a route to deliver parcels to a set of customers by either a truck or a drone, thereby minimizing operational costs. Since TSP-D is considered NP-hard, using metaheuristics is one of the most promising solutions. This paper presents a hybrid metaheuristic solution method of TSP-D based on two state-of-the-art algorithms: the genetic algorithm and ant colony optimization algorithm. Heuristics in TSP-D literature are based on two consequent decisions: truck routing and drone assignment. Unlike those in the existing literature, the proposed metaheuristic constructs both truck and drone routes simultaneously. Additionally, to the best of our knowledge, we introduce for the first time a solution method on the basis of an ant colony optimization approach to TSP-D. Additionally, we propose a binary pheromone framework for both drone and truck, diverging from the traditional pheromone structure. Computational experiments indicate that the proposed hybrid metaheuristic algorithm is able to generate optimal routes for provided instances of TSP-D benchmarking. In addition, the algorithm improves the best-known solutions of some instances found by rival heuristics.
In the construction industry, since differences in perceptions among the participants of the projects, conflicts are inevitable. If conflicts are not well managed, they are quickly turn into disputes. Disputes are one of the main factors which prevent the successfully completion of the construction project. Thus, it is important to be aware of the causes of disputes in order to complete the construction project in the desired time, budget and quality. This paper aims to analyze the main causes of disputes which occur in the construction industry. In order to reach this aim, a literature review was undertaken to identify the common construction disputes. The disputes derived from a cross-section of the literature, were classified into main categories and the main causes of construction disputes were determined. Finally, an analysis was carried out using the analytical hierarchy process (AHP) approach to determine their relative importance.
1 October 2012 in Procedia - Social and Behavioral Sciences
Nowadays, fluctuations of costs and costumer demands make it harder for firms to respond the market conditions effectively and cause customer and profit loss. In modern supply chain process, products must be delivered to customers in the shortest possible delivery time and this delivery time must be procured with a minimum number of stocks. Distribution for small amounts of products in a wide variety must be more frequently and more rapidly. This time constraint has a direct impact on the distribution and warehousing management. Although the importance of warehouses is emphasized in the literature, determining the size of warehouses is not mentioned enough. In this context, determining the size for a new flow type warehouse and a new u- type warehouse has been tried in this paper. A warehouse design which minimizing the total picker distance has been studied analytically with taking the number of doors into account. As a result of the calculations, different interior layouts have been proposed for the flow type warehouses and u-type warehouses
Power generator manufacturers play a critical role in maintaining electric flow for sustainable product and service production. The aim of this study is to extract the criteria necessary for a generator manufacturer to evaluate and select its suppliers for its sustainable supplier park, and to prioritize them to form the supply network. The methodology of this research covers the phases as (i) extracting the criteria affecting the supplier selection decision process of a power generator company via an in-depth literature and industrial report review, (ii) evaluating these criteria by industry experts, (iii) identifying the weights of each criterion via SWARA (“step-wise weight assessment ratio analysis”), (iv) prioritizing the alternative suppliers fitting to the criteria so that the power generator company can construct its sustainable supplier park via IVN EDAS (“interval valued neutrosophic Evaluation Based on Distance from Average Solution”), (v) conducting a sensitivity analysis to check for the robustness of the results by changing the weights, and (vi) applying a comparative analysis to validate the methodology’s accuracy by comparing the results with IVN TOPSIS and IVN CODAS. Moreover, this paper contributes to the literature by elaborating on the integration details of the IVN SWARA and IVN EDAS as the first research paper of the author’ knowledge. A practitioner can understand which factors to consider prominently in forming a sustainable supplier park, or in deciding on which suppliers to select to plan the strategic operations of a power generator company.