Waldo Galle

Dr. Waldo Galle

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2019 in Journal of Cleaner Production
Verified
Journal Article
Closed access
MBMatthias Buyle
Matthias Buyle
WGWaldo Galle
Waldo Galle
WDWim Debacker
Wim Debacker
AAAmaryllis Audenaert
Amaryllis Audenaert

18 August 2020 in Buildings
Verified
Journal Article
Open access
PDF file
Charlotte CambierCharlotte Cambier
Charlotte Cambier
WGWaldo Galle
Waldo Galle
NTNiels De Temmerman
Niels De Temmerman
To support the construction sector in its transition to a circular economy, many design instruments and decision support tools have been and are still being developed. This development is uncoordinated and raises confusion among building designers and advising engineers, slowing down the tools’ adoption in practice. Moreover, it is unclear if the available design tools are able to fulfil the needs of design professionals at all. Therefore, this research identifies the knowledge challenges for the “supply and demand” of design tools for a circular construction practice. It focuses on Flanders, given the importance the topic receives in the region’s policy programme and among practitioners. This study builds on a thorough literature review, and on inventorying and categorising instruments and ongoing developments. By comparing that review with the needs that were identified during interviews with a focus group, it was possible to pinpoint designers’ needs for support tools and outline three urgent research tracks. More generally, it was found that the needs of our focus group are only partially reflected by the available design tools and the ongoing developments. This identified mismatch advocates for a more participatory and practice-oriented research approach when developing design support tools for circular building.

21 May 2015 in Buildings
Verified
Journal Article
Open access
PDF file
MVMieke Vandenbroucke
Mieke Vandenbroucke
WGWaldo Galle
Waldo Galle
NTNiels De Temmerman
Niels De Temmerman
WDWim Debacker
Wim Debacker
APAnne Paduart
Anne Paduart
Because the student residences of the Vrije Universiteit Brussel built in 1973 are not adapted to current comfort standards, the university decided to construct new accommodation facilities at the border of the campus. However, besides demolition, there was no strategy on how to deal with the existing ones. In the search for a more sustainable strategy, the university’s administration assigned the TRANSFORM research team to define various design strategies and to assess the long-term environmental consequences in order to select the best strategy by the use of Life Cycle Environmental Assessment. Current Life Cycle Environmental Assessments generally include maintenance, repair, replacement and operational energy consumption during use, but do not include future refurbishments. However, it is likely that their impact cannot be neglected either. Therefore, this article offers a framework which takes future refurbishments into account, in addition to the standard use impacts: initial and end-of-life impact. We report on the construction assemblies, the results of the assessments conducted and the advice provided. The results confirm that the impact of future refurbishments cannot be neglected. In addition, we observed that there were significant environmental savings when transforming the residences compared to new construction, and long-term benefits of a design enabling the reuse of building elements.

27 November 2022 in Glass Structures & Engineering
Verified
Journal Article
Open access
PDF file
EGEsther Geboes
Esther Geboes
WGWaldo Galle
Waldo Galle
NTNiels De Temmerman
Niels De Temmerman
End-of-life insulating glass units (IGUs) continue to follow a linear, wasteful path from renovation and demolition sites into landfills or low-value recycling. To get one step closer to the question of how to close the glass loop, this exploratory research outlines a cross-practitioners review of glass circularity in conventional Flemish and Brussels practices. A series of semi-structured interviews with network actors and an extensive literature study is conducted to identify existing and missing circular practices and to pinpoint the key barriers and opportunities. In general, the circular strategies repurpose and open-loop recycling of end-of-life IGUs are successfully applied in Flemish and Brussels construction practices. Repair, reuse, and closed-loop recycling remain unexplored. The main barriers are the lack of collaboration, logistic and labour costs to collect end-of-life IGUs, its complex disassembly, the lack of legal incentives and the conservativeness of the construction sector. Case studies, the high recycling potential and the scale of projects are found to be the main opportunities for glass circularity. The cross-practitioners’ insights in this paper contribute to close the glass loop and to further development and up-scaling of circular strategies.

14 July 2017 in Buildings
Verified
Journal Article
Open access
PDF file
WGWaldo Galle
Waldo Galle
NTNiels De Temmerman
Niels De Temmerman
RMRonald De Meyer
Ronald De Meyer
Although life cycle assessment offers insight into the long-term value of our building stock, it has become impossible to model with certainty the service life of a building. What if new lifestyles make reality diverge from the expected service life? What if the building is decommissioned very early or forced to accommodate new functions? Would the same design decisions have been made or would an alternative have been preferred? In reaction to this challenge, the present paper proposes to integrate scenario planning and life cycle assessment. Therefore, it discusses from where scenario planning originates and how it appeared hitherto in architectural design and life cycle assessment. Thereafter, it explores how assessors can profit from scenarios when raising awareness and co-creating alternatives. Subsequently, a methodological framework for effective scenario development is proposed. To illustrate the added value of scenario integrated life cycle assessments, four divergent scenarios are developed for evaluating the financial feasibility of demountable building element reuse. With this simple case study is shown how more relevant and nuanced assessment outcomes are obtained when divergent scenarios are adopted.

21 June 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Charlotte CambierCharlotte Cambier
Charlotte Cambier
WGWaldo Galle
Waldo Galle
NTNiels De Temmerman
Niels De Temmerman
In addition to the environmental burden of its construction and demolition activities, the Flemish housing market faces a structural affordability challenge. As one possible answer, this research explores the potential of so-called expandable houses, being built increasingly often. Through specific design choices that enable the disassembly and future reuse of individual components and so align with the idea of a circular economy, expandable houses promise to provide ever-changing homes with a smaller impact on the environment and at a lower cost for clients. In this paper, an expandable house suitable for various housing needs is conceived through a scenario-based research-by-design approach and compared to a reference house for Flanders. Subsequently, for both houses the life cycle costs are calculated and compared. The results of this exploration support the proposition that designing expandable houses can be a catalyst for sustainable, circular housing development and that households could benefit from its social, economic and ecological qualities. It requires, however, a dynamic perspective on evaluating their life-cycle impact.