Milton Fonseca

Dr. Milton Fonseca

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 July 2017 in Energies
Verified
Journal Article
Open access
PDF file
MFMilton Fonseca
Milton Fonseca
UBUbiratan Bezerra
Ubiratan Bezerra
JLJandecy Cabral Leite
Jandecy Cabral Leite
JMJorge Moya
Jorge Moya
This paper presents a specific method to improve the reliability of the equipment and the quality of power supplied to the electrical systems with the frequency and voltage control of a thermoelectric plant, to guarantee a more stable system. The method has the novelty of combining Total Productive Maintenance (TPM) using only four pillars, with Electrical Predictive Maintenance based in failure analysis and diagnostic. It prevents voltage drops caused by excessive reactive consumption, thus guaranteeing the company a perfect functioning of its equipment and providing a longer life of them. The Maintenance Management Program (MMP) seeks to prevent failures from causing the equipment to be shut down from the electrical system, which means large financial losses, either by reducing billing or by paying fines to the regulatory agency, in addition to prejudice the reliability of the system. Using management tools, but applying only four TPM pillars, it was possible to achieve innovation in power plants with internal combustion engines. This study aims to provide maintenance with a more reliable process, through the implantation of measurement, control and diagnostic devices, thus allowing the management to reduce breakdown of plant equipment. Some results have been achieved after the implementation, such as reduction of annual maintenance cost, reduction of corrective maintenance, increase of MTBF (Mean Time between Failures) and reduction of MTTR (Mean Time to Repair) in all areas. Probabilistic models able to describe real processes in a more realistic way, and facilitate the optimization at maximum reliability or minimum costs are presented. Such results are reflected in more reliable and continual power generation.

9 July 2018 in IEEE Access
Verified
Journal Article
Open access
MFMilton Fonseca
Milton Fonseca
UBUbiratan Holanda Bezerra
Ubiratan Holanda Bezerra
JBJorge De Almeida Brito
Jorge De Almeida Brito
JLJandecy Cabral Leite
Jandecy Cabral Leite
MNManoel Henrique Reis Nascimento
Manoel Henrique Reis Nascimento
This study presents a new method for load pre-dispatch considering the technical conditions of engines in thermoelectric power plants by combining several maintenance and diagnostic techniques and using computational intelligence. A diagnosis of the technical conditions of the engines is performed using a lubricant analysis, vibration analysis, and thermography. With these data from a statistical analysis, it is possible to predict when an engine will fail and to consider this phenomenon in the load pre-dispatch. To increase the engine reliability and power supply, a Maintenance Management Program (MMP) is developed using Management tools, applying only 4 Total Productive Maintenance (TPM) pillars and combining them with predictive maintenance and diagnostics, thus reducing failures in plant equipment. Some results achieved after this implementation are as follows: a reduction in the annual cost of maintenance, a reduction in the corrective maintenance, an increase in the Mean Time between Failures (MTBF) and a decrease in the Mean Time to Repair (MTTR) in all areas. In addition, the pre-dispatch ensures that the demanded power is met with a high degree of reliability and quality and at minimal cost.

5 July 2018
Verified
Book Chapter
Open access
PDF file
JJJorge de Almeida Brito Júnior
Jorge de Almeida Brito Júnior
MNMarcus Vinicius Alves Nunes
Marcus Vinicius Alves Nunes
MNManoel Henrique Reis Nascimento
Manoel Henrique Reis Nascimento
JLJandecy Cabral Leite
Jandecy Cabral Leite
JMJorge Moya
Jorge Moya
HOHaroldo Melo de Oliveira
Haroldo Melo de Oliveira
The main objective of thermoelectric power plants is to meet the power demand with the lowest fuel cost and emission levels of pollutant and greenhouse gas emissions, considering the operational restrictions of the power plant. Optimization techniques have been widely used to solve engineering problems as in this case with the objective of minimizing the cost and the pollution damages. Heuristic and metaheuristic algorithms have been extensively studied and used to successfully solve this multi-objective problem. This chapter, several optimization techniques (simulated annealing, ant lion, dragonfly, NSGA II, and differential evolution) are analyzed and their application to economic-emission load dispatch (EELD) is also discussed. In addition, a comparison of all approaches and its results are offered through a case study.

1 May 2021 in International Journal for Innovation Education and Research
Verified
Journal Article
Open access
PDF file
PJPaulo Oliveira Siqueira Junior
Paulo Oliveira Siqueira Junior
MNManoel Henrique Reis Nascimento
Manoel Henrique Reis Nascimento
ÍSÍtalo Rodrigo Soares Silva
Ítalo Rodrigo Soares Silva
RPRicardo Silva Parente
Ricardo Silva Parente
MFMilton Fonseca
Milton Fonseca
JLJandecy Cabral Leite
Jandecy Cabral Leite
With the expansion of means of river transportation, especially in the case of small and medium-sized vessels that make routes of greater distances, the cost of fuel, if not taken as an analysis criterion for a larger profit margin, is considered to be a primary factor , considering that the value of fuel specifically diesel to power internal combustion machines is high. Therefore, the use of tools that assist in decision-making becomes necessary, as is the case of the present research, which aims to contribute with a computational model of prediction and optimization of the best speed to decrease the fuel cost considering the characteristics of the SCANIA 315 machine. propulsion model, of a vessel from the river port of Manaus that carries out river transportation to several municipalities in Amazonas. According to the results of the simulations, the best training algorithm of the Artificial Neural Network (ANN) was the BFGS Quasi-Newton considering the characteristics of the engine for optimization with Genetic Algorithm (AG).

1 May 2021 in International Journal for Innovation Education and Research
Verified
Journal Article
Open access
PDF file
ÍSÍtalo Rodrigo Soares Silva
Ítalo Rodrigo Soares Silva
MNManoel Henrique Reis Nascimento
Manoel Henrique Reis Nascimento
MFMilton Fonseca
Milton Fonseca
RPRicardo Silva Parente
Ricardo Silva Parente
PJPaulo Oliveira Siqueira Júnior
Paulo Oliveira Siqueira Júnior
JLJandecy Cabral Leite
Jandecy Cabral Leite
Predictive as well as preventive maintenance are tools of maintenance programs that aim to increase or maintain the life expectancy of an equipment through computational techniques and tools. Bearing in mind that the power generation industry has a high maintenance rate with machines and / or electric generators stopped, this research aims to develop a computational model for predicting the Reliability Key Performance Indicator (KPI) to identify how available the equipment will be in a time span of 22 days, for this the methodology to be used will be based on analyzes and tests of artificial neural network (ANN) architectures using the Bayesian Regularizers training algorithm, alternating the transfer functions in the layers hidden to find the best state of convergence and the minimum Root Mean Square Error (RMSE) value calculated between the real and simulated outputs. According to the results obtained by the training, validation and test steps, the algorithm presented a RMSE rate of 0.0000104202 and a 99.9% correlation between the real and simulated values, thus the model is able to identify which machine will have the greatest efficiency and less efficiency within the defined time span.

27 September 2019
Verified
Book Chapter
Closed access
JLJandecy Cabral Leite
Jandecy Cabral Leite
JJJorge de Almeida Brito Júnior
Jorge de Almeida Brito Júnior
MNManoel Henrique Reis Nascimento
Manoel Henrique Reis Nascimento
CFCarlos Freitas
Carlos Freitas
MFMilton Fonseca
Milton Fonseca
TCTirso Lorenzo Reyes Carvajal
Tirso Lorenzo Reyes Carvajal