Zhang ke fa

Mr. Zhang ke fa


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 December 2023 in Archives of Civil and Mechanical Engineering
Verified
Journal Article
Closed access
PDF file
YZYingao Zhang
Yingao Zhang
LCLiang Chen
Liang Chen
ZWZhigang Wu
Zhigang Wu
HXHaihui Xie
Haihui Xie
SYShengwei Yang
Shengwei Yang
ZHZhangliang Hu
Zhangliang Hu

24 June 2023 in Buildings
Verified
Journal Article
Open access
PDF file
HXHaihui Xie
Haihui Xie
ZFZhang ke fa
Zhang ke fa
SYShengwei Yang
Shengwei Yang
LCLiang Chen
Liang Chen
GSGuigang Shi
Guigang Shi
ZWZhigang Wu
Zhigang Wu
In order to address the difficulty in determining the seismic damage probability of continuous girder bridges under construction, the seismic vulnerability analysis method of the construction state is proposed in this study. Firstly, taking a long-span prestressed concrete composite box girder bridge with corrugated steel webs (OSW) as an example, the finite element models (FEMs) of dynamic calculation in different phases of cantilever construction are simulated by OpenSEES. Secondly, by selecting reasonable seismic waves and seismic intensity measures, the non-linear time-history analysis is carried out, followed by the demand parameters and damage indexes suitable for the construction state proposed. Finally, the probabilistic seismic demand model (PSDA) of the continuous box girder bridge during the construction stage is constructed by using the “cloud method”, and the seismic vulnerability curves of the piers and temporary bearings are established to evaluate the seismic performance during the construction stage. The results indicate that the damage probability of piers and temporary bearings increases with the progress of construction. The initial formation of the cantilever structure and the sudden change in the size of the construction segmental girder correspond to a high probability of damage, and seismic protection measures should be strengthened during this construction state. Moreover, significantly higher damage probability of the components under construction compared to the completed bridge after it is built.

19 May 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
LCLiang Chen
Liang Chen
RZRui Zuo
Rui Zuo
YZYingao Zhang
Yingao Zhang
ZFZhang ke fa
Zhang ke fa
HXHaihui Xie
Haihui Xie
XJXuekai Ji
Xuekai Ji
This study aims to investigate the seismic behavior of concrete-filled steel tubular (CFST)-laced piers; after verifying the model through engineering tests, the simplified finite element models (S-FEM) and refined ones (R-FEM) with CFST-laced piers are developed in this manuscript, respectively. Through comparison, it is found that the S-FEM can effectively improve analyzing efficiency while meeting the requirements of engineering analysis accuracy. In addition, the seismic response of assembled flange-connected CFST-laced piers bridge was studied based on the S-FEM, and different structural parameters, including pier height, axial compression ratios, steel ratios of CFST columns, steel lacing tube arrangement, and longitudinal slope, are considered to optimize the bridge design scheme. Results indicate that the parameters of 0.1 axial pressure ratios and 1:30 longitudinal slope show superior seismic performance. Meanwhile, the peak axial force and peak bending moment of CFST column limbs occur at the pier bottom, and the flanges, which are subject to larger bending moments, are generally located at the two connection positions above the pier bottom.