The adoption of relational contracting (RC) has been increasingly used by parties in various developed countries as one of the innovative tools in traditional contracting to achieve benefits such as cost savings, schedule reduction, reduced litigation, improved teamwork, increased trust, stronger relationships, and overall satisfaction. However, the adoption of RC in public-sector construction organizations has been observed to encounter difficulties when compared with implementation in private-sector organizations because of typical barriers, including a lack of understanding of partnering principles and personality indifference, in addition to a low offer mentality, ineffective top management, and a lack of positive working-level commitment. Studies in this area conducted with the objective of ensuring the effective implementation of RC in public-sector organizations are also limited. In view of this, this study aims at exploring the factors that will have an important impact on developing RC practices and the relationship between the contractor and the public firm. Previous studies focused on the identification of the success factors of RC, but those studies were limited to RC implementation from a top management perspective only. Thus, this study investigates the critical factors in RC that are necessary to produce successful relational partnerships in public organizations exclusively from the perspective of front-line employees. The front-line employees include junior engineers and assistant engineers, who are responsible for the day-to-day management of construction activities. An extensive literature review offered 9 important relational contract success factors that were identified and measured by 29 indicators. The data were collected from 202 operational-level employees at four public-sector construction organizations in India. The structural equation modeling technique was used for data analysis. The critical factors identified from the study are training, organizational change, commitment of top management, partner selection, and the assessment process. Organizational change for partnering emerged from this study as one of the new critical factors. The findings from this study could be used to improve the relational partnerships of public organizations.
23 February 2019 in IOP Conference Series: Materials Science and Engineering
Highway projects carry out higher risk than other construction projects because they entail high capital outlays and intricate site conditions. Although the research currently available provides many valuable insights into the issue, however identification of risks pertaining to Indian highways construction was neglected. This paper presents the findings of questionnaire survey conducted on the critical risk factors affecting the successful performance of highway construction in India in terms of cost, time and quality. The critical risk factors in Indian highway constructions are change of scope of work, land acquisition delay, poor preliminary soil information and investigations, schedule delay caused by rejection of unqualified materials and change orders by political pressure. Further, critical risk factors were explored through factor analysis and categorized them in five factors viz. construction risk, public sector management risk, engineering risk, resource procurement risk and social risk. The identified risks will be useful to the field engineers for design of proper risk mitigation strategy during planning stage.
Indian government implemented 24x7 water supply projects in few selected cities. These projects were implemented either under Public Private Partnership (PPP) or direct funding by government. However, many projects witnessed failure during later stage of project life cycle. The paper aimed to carry out performance evaluation of implementation of continuous water supply projects against the various risks. The case study research methodology was adopted for the study. Initially, various risks in water supply projects were identified through literature review. Two polar cases were selected for the study, one was implemented under Public Private Partnership (PPP) and other was implemented under direct funding from government budget. The cross case analysis of both cases against the identified risks is presented in the paper. The project under PPP mode could not perform well against risks like consumer risk, revenue risk, financial risk and socio political risk. The result showed that both the projects could not achieve the desired success as planned initially still it can be concluded that continuous water supply projects under government funding performed better
A continuous evaluation of the stakeholder management process can be achieved using definitive key performance indicators (KPIs). An exhaustive literature survey in this direction provided a set of 26 indicators assessed through a questionnaire survey for their possible implications on the stakeholder management process. The survey was conducted among 55 respondents with experience in using building information modeling (BIM) in mega-construction projects. The data were initially analyzed through factor analysis to establish six KPIs. Fuzzy synthetic evaluation (FSE) was used to evaluate the index values of the established KPIs to assess their importance levels. The results presented the KPIs in decreasing order of their index values: asset performance (4.27), open innovation (4.04), project O&M expenses (3.97), design process efficiency (3.95), project execution efficiency (3.90), and stakeholder concerns (3.59). The results generated a stakeholder management process assessment framework and model that provides a clear insight into using an indicator in measuring the specific stakeholder management dimension. The findings of this work can provide definite insight amongst planning managers about the stakeholder management process through the posited indicators. Further, they can adopt measures to improve the stakeholder management process in their respective projects.
27 June 2018 in Construction Economics and Building
Adoption of relational contracting in public sector construction organisations is more difficult than in private sector organisations due to the inherent rigidity of public sector. Therefore, implementation of the relational contracting processes should be treated as an organisational change management process in public sector organisations. The purpose of this paper is to develop a relational contracting conceptual model (RCMM) by integrating success factors for positive change management in public sector organisations. A qualitative research methodology comprising two rounds of expert interviews was used. The first round of interviews was conducted to gauge the present level of relational contracting in public sector construction organisations. The second round of interviews was conducted to validate the relational contracting conceptual model by integrating success factors of change management in public sector organisations. The relational contracting model highlighted the importance of a need to develop a vision for partnering, stakeholder analysis and consensus building among them, empowerment of operational level employees and their participation in plan execution, time bound review meetings of top management on site to show commitment, resolution of disputes and fast decision making along with publication of the performance reports. The paper presents a critical insight on relational processes of public sector construction organisations in India in the context of organisational change management model which has not been the focus in majority of the previous research studies.
12 March 2024 in Asian Journal of Civil Engineering