Zhihui Wu

Dr. Zhihui Wu


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 January 2021 in Arabian Journal for Science and Engineering
Verified
Journal Article
Closed access
PDF file
Qiang XieQiang Xie
Qiang Xie
ZCZhilin Cao
Zhilin Cao
XSXiaokang Shi
Xiaokang Shi
XFXiang Fu
Xiang Fu
Yuxin BanYuxin Ban
Yuxin Ban
ZWZhihui Wu
Zhihui Wu

1 May 2021 in Natural Hazards Review
Verified
Journal Article
Closed access
PDF file
Qiang XieQiang Xie
Qiang Xie
ZCZhilin Cao
Zhilin Cao
WXWenbo Xie
Wenbo Xie
SZSong Zhanping
Song Zhanping
ZWZhihui Wu
Zhihui Wu
Different construction methods have a significant influence on slope stability. Through an indoor model test, two construction methods of cutting a slope, excavation without support and the so-called one-step skip excavation method with the support of antislide piles, were carried out to analyze the mechanical behavior of the slope and antislide piles in the construction. Based on the model test, a numerical simulation was carried out to study the construction stability of the slope and antislide piles during the construction process of the four skip methods (the excavation methods referred to as the two sides followed by the middle part of the slope in parallel, the odd sections followed by even sections of the slope in parallel, the two-step skip in parallel, and the one-step skip). The results show that the constructed antislide piles act as the arch foot of the soil arch effect to restrain the deformation of the soil between piles. By comparing the four skip methods, we found that the ranges of large shear deformation of the cutting slope were roughly the same, and a shear zone was most likely to form in the middle of a slope to be excavated during the construction process of the four methods. The two sides followed by the middle part of the slope in parallel excavation method is more effective than the other three methods in controlling the change of bending moment of the piles and the safety factors of the slope during construction. Thus, this method should be given priority in the actual construction and design of small and medium cutting slopes. The conclusion has specific guiding significance for engineering practice.

20 January 2022 in Arabian Journal for Science and Engineering
Verified
Journal Article
Closed access
PDF file
Qiang XieQiang Xie
Qiang Xie
ZWZhihui Wu
Zhihui Wu
Yuxin BanYuxin Ban
Yuxin Ban
XFXiang Fu
Xiang Fu
ZCZhilin Cao
Zhilin Cao
BCBolin Chen
Bolin Chen

9 July 2020 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
QXQiang Xie
Qiang Xie
ZWZhihui Wu
Zhihui Wu
CHChun-Bo He
Chun-Bo He
JDJie Dong
Jie Dong
ZCZhi-Lin Cao
Zhi-Lin Cao
LLLi Liang
Li Liang

25 June 2021 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
JDJie Dong
Jie Dong
ZWZhihui Wu
Zhihui Wu
ZLZhao-Qi Li
Zhao-Qi Li
YYYue Yang
Yue Yang

1 August 2023 in Natural Hazards Review
Verified
Journal Article
Closed access
QXQiang Xie
Qiang Xie
ZWZhihui Wu
Zhihui Wu
ZCZhilin Cao
Zhilin Cao
YBYuxin Ban
Yuxin Ban
XFXiang Fu
Xiang Fu
JDJie Dong
Jie Dong