The new Shanghai No. 1 Coal Mine is located in arid and semiarid area of northwest China, which is characterized by scarce rainfall, intense evaporation, and limited water resources. High-intensity coal mining has caused severe damage to groundwater resources. The Baotashan sandstone aquifer of the Jurassic system has abundant water resources, and they are stored in the floor strata of mining coal seams. This poses the risk of high-pressure build-up and water inrush hazards during the mining of coal. To avoid these, the Baotashan sandstone aquifer needs to be drained and depressurized, which can result in a huge waste of water resources. Thus, taking the New Shanghai No. 1 Coal Mine as the basis for the case study, the impact of coal mining on the underground water resources was quantified. Large-scale water release tests were performed under the shaft to determine the hydrogeological properties of the Baotashan sandstone aquifer and a three-dimensional numerical model of the groundwater system was established. The dynamic phenomenon of water drainage was simulated and the drained water discharge was predicted under the condition of safe mining.
Interconnected fractures induced by coal mining, known as water-conducting fracture zones (WCFZs), form a fractured zone where water from overlying aquifers flows into the goaf. Substantial findings have been established on the development height of WCFZs; however, these analyses have been based on intact structures or rock masses. Research on how primary fissures or other water-conducting structures influence the development of WCFZs remains limited. The mining seam of the Gaojiapu Coal Mine in the Ordos Basin, China, is overlaid by a gigantic and highly confined Cretaceous aquifer. Additionally, the primary fissures of the overlying strata are highly developed. Geophysical inversion of the primary fissures and vertical and horizontal drilling were undertaken in order to systematically investigate the characteristics of WCFZ development in the overlying strata. The results show that a dense network of primary fissures is connected with the middle and lower Cretaceous aquifer developed in Mining Zone 1. These fissures are prone to connecting with mining-induced fractures to form the highly developed WCFZs observed and verified in this study. A grouting engineering approach was adopted at the Gaojiapu Coal Mine to block the primary fissures in advance, as this can effectively control the abnormal development of the WCFZs and decrease the discharge of mine water, ultimately protecting the water resources of the Cretaceous aquifer. Our research clarifies the significant role of primary fissures in the development of water-conducting fracture zones, and provides important theoretical guidance for the accurate prediction and prevention of mine roof water hazards in areas with similar mining conditions.