Weichi Chen

Dr. Weichi Chen


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 March 2022 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
KFkaifang Fan
kaifang Fan
JHJianghui He
Jianghui He
WLWenping Li
Wenping Li
WCWeichi Chen
Weichi Chen

4 May 2023 in Water
Verified
Journal Article
Open access
PDF file
YLYuguang Lyv
Yuguang Lyv
Wei QiaoWei Qiao
Wei Qiao
WCWeichi Chen
Weichi Chen
XCXianggang Cheng
Xianggang Cheng
MLMengnan Liu
Mengnan Liu
YLYingjie Liu
Yingjie Liu
The new Shanghai No. 1 Coal Mine is located in arid and semiarid area of northwest China, which is characterized by scarce rainfall, intense evaporation, and limited water resources. High-intensity coal mining has caused severe damage to groundwater resources. The Baotashan sandstone aquifer of the Jurassic system has abundant water resources, and they are stored in the floor strata of mining coal seams. This poses the risk of high-pressure build-up and water inrush hazards during the mining of coal. To avoid these, the Baotashan sandstone aquifer needs to be drained and depressurized, which can result in a huge waste of water resources. Thus, taking the New Shanghai No. 1 Coal Mine as the basis for the case study, the impact of coal mining on the underground water resources was quantified. Large-scale water release tests were performed under the shaft to determine the hydrogeological properties of the Baotashan sandstone aquifer and a three-dimensional numerical model of the groundwater system was established. The dynamic phenomenon of water drainage was simulated and the drained water discharge was predicted under the condition of safe mining.

27 February 2026 in Water
Verified
Journal Article
Open access
PDF file
JZJinkui Zhang
Jinkui Zhang
Wei QiaoWei Qiao
Wei Qiao
WCWeichi Chen
Weichi Chen
CLChengsen Lin
Chengsen Lin
XCXianggang Cheng
Xianggang Cheng
CLCong Liu
Cong Liu
Interconnected fractures induced by coal mining, known as water-conducting fracture zones (WCFZs), form a fractured zone where water from overlying aquifers flows into the goaf. Substantial findings have been established on the development height of WCFZs; however, these analyses have been based on intact structures or rock masses. Research on how primary fissures or other water-conducting structures influence the development of WCFZs remains limited. The mining seam of the Gaojiapu Coal Mine in the Ordos Basin, China, is overlaid by a gigantic and highly confined Cretaceous aquifer. Additionally, the primary fissures of the overlying strata are highly developed. Geophysical inversion of the primary fissures and vertical and horizontal drilling were undertaken in order to systematically investigate the characteristics of WCFZ development in the overlying strata. The results show that a dense network of primary fissures is connected with the middle and lower Cretaceous aquifer developed in Mining Zone 1. These fissures are prone to connecting with mining-induced fractures to form the highly developed WCFZs observed and verified in this study. A grouting engineering approach was adopted at the Gaojiapu Coal Mine to block the primary fissures in advance, as this can effectively control the abnormal development of the WCFZs and decrease the discharge of mine water, ultimately protecting the water resources of the Cretaceous aquifer. Our research clarifies the significant role of primary fissures in the development of water-conducting fracture zones, and provides important theoretical guidance for the accurate prediction and prevention of mine roof water hazards in areas with similar mining conditions.