In this paper, a minimum-time motion online planning method (MTMOLP) is proposed for underactuated overhead crane systems within both safety and physical constraints. Firstly, the motion process is divided into seven stages by analyzing the coupling between trolley movement and payload swing, and a minimum-time motion planning problem and the expression of its solution are presented. Secondly, a state prediction method based on the payload swing energy is given to compute the solution of the motion planning problem in real time. Finally, several simulations and experiments are conducted to verify the feasibility and effectiveness of the proposed method. The results show that the MTMOLP method can obtain the solution of the minimum-time motion planning problem and spends very little time on computing process. Therefore it can be applied to the online motion planning of the overhead cranes. Furthermore, the motion process division by the coupling analysis can also provide a reference for the underactuated control of overhead crane systems.
Combined cooling, heating, and power (CCHP) systems are a promising energy-efficient and environment-friendly technology. However, their performance in terms of energy, economy, and environment factors depends on the operation strategy. This paper proposes a multi-energy complementary CCHP system integrating renewable energy sources and schedulable heating, cooling, and electrical loads. The system uses schedulable loads instead of energy storage, at the same time, a collaborative optimization scheduling strategy, which integrates energy supply and load demand into a unified optimization framework to achieve the optimal system performance, is presented. Schedulable cooling and heating load models are formulated using the relationship between indoor and outdoor house temperatures. A genetic algorithm is employed to optimize the overall performance of energy, economy, and environment factors and obtain optimal day-ahead scheduling scheme. Case studies are conducted to verify the efficiency of the proposed method. Compared with a system involving thermal energy storage and demand response (DR), the proposed method exhibits a higher primary energy saving rate, greenhouse gas emission reduction rate, and operation costs saving rate of 7.44%, 6.59%, and 4.73%, respectively, for a typical summer day, thereby demonstrating the feasibility and superiority of the proposed approach.
In this paper, a combined cooling, heating, and power (CCHP) system with thermal storage tanks is introduced. Considering the plants’ off-design performance, an efficient methodology is introduced to determine the most economical operation schedule. The complex CCHP system’s state transition equation is extracted by selecting the stored cooling and heating energy as the discretized state variables. Referring to the concept of variable cost and constant cost, repeated computations are saved in phase operating cost calculations. Therefore, the most economical operation schedule is obtained by employing a dynamic solving framework in an extremely short time. The simulation results indicated that the optimized operating cost is reduced by 40.8% compared to the traditional energy supply system.
This study proposes an optimal scheduling method for complex integrated energy systems. The proposed method employs a heuristic algorithm to maximize its energy, economy, and environment indices and optimize the system operation plan. It uses the k-means combined with box plots (Imk-means) to improve the convergence speed of the heuristic algorithm by forming its initial conditions. Thus, the optimization scheduling speed is enhanced. First of all, considering the system source and load factors, the Imk-means is presented to find the typical and extreme days in a historical optimization dataset. The output results for these typical and extreme days can represent common and abnormal optimization results, respectively. Thus, based on the representative historical data, a traditional heuristic algorithm with an initial solution set, such as the genetic algorithm, can be accelerated greatly. Secondly, the initial populations of the genetic algorithm are dispersed at the historical outputs of the typical and extreme days, and many random populations are supplemented simultaneously. Finally, the improved genetic algorithm performs the solution process faster to find optimal results and can possibly prevent the results from falling into local optima. A case study was conducted to verify the effectiveness of the proposed method. The results show that the proposed method can decrease the running time by up to 89.29% at the most, and 72.68% on average, compared with the traditional genetic algorithm. Meanwhile, the proposed method has a slightly increased optimization index, indicating no loss of optimization accuracy during acceleration. It can also indicate that the proposed method does not fall into local optima, as it has fewer iterations.