The present study is centered on the investigation of longitudinal and lateral profiles of Extremely low-frequency Electromagnetic field experiments conducted at three distinct locations in Oman. The investigation encompasses findings obtained from 400kV transmission lines and substations. The analysis of electric and magnetic fields emitted by transmission lines was conducted using an EHP-50F E&H field analyzer sensor set and an environmental meter. The measurements were conducted at 400kV transmission lines or to a distance of the insignificant field at the high-voltage substation, various components such as power transformers, CT (current transformers), PT (potential transformers), circuit breakers, reactors, earth switches, transport couplers, lightning arrestors, and other. This research in Oman marks the initial exploration of various factors pertaining to the Oman Electricity Transmission Company (OETC) and its technical standards, which are founded on optimal practices. These factors encompass the interphase spacing, the spacing between conductors within a bundle of twin conductors, the configuration of phases on a tower, the crosssectional area of conductors, and similar considerations. The proposed study aims to support the Sultanate of Oman's objective of establishing a high-quality smart transmission grid by 2030. This system will facilitate the efficient, reliable, and secure transfer and distribution of power, while also offering economic benefits. This research aims to cater to the needs of students and engineers by offering a highly practical approach that utilizes appropriate equipment. This article presents a systematic approach to the implementation of a smart transmission grid, incorporating the aforementioned attributes.
1 April 2026 in Journal of Physics: Conference Series
Reliability assessment of heavily loaded distribution feeders is essential for maintaining a stable and continuous power supply in increasingly complex power systems. This study evaluates and enhances feeder reliability through a combination of probabilistic and deterministic methods. Markov models and Monte Carlo simulations are used to analyze the behavior of component failures, while Reliability Block Diagrams (RBDs) and Fault Tree Analysis (FTA) identify potential failure pathways. Simulations are performed using ETAP software under three scenarios: the original system without Distributed Generation (DG) and lateral protection, without DG but with a lateral protection system, and an improved system with optimally placed DG. The analysis utilizes one year of operational data from January 2024 to January 2025, incorporating solar and wind DG technologies to assess their combined impact on system reliability. Results show significant reliability improvements with DG integration. The System Average Interruption Frequency Index (SAIFI) decreases from 1.5716 to 0.9281, and the System Average Interruption Duration Index (SAIDI) drops from 208.1936 to 75.8307 hours/year. Customer Average Interruption Duration Index (CAIDI) improves from 132.47 to 81.703 hours. Energy-related indices also benefit: Expected Energy Not Supplied (EENS) reduces from 43.817 to 15.942 MWh/year, ASUI decreases from 0.02377 pu to 0.00866 pu, and ASAI increases from 0.9762 pu to 0.9913 pu. These findings confirm that DG placement significantly enhances feeder reliability. Future research will explore adaptive optimization for DG integration under dynamic load and renewable conditions.
1 September 2026 in International Journal of Power Electronics and Drive Systems (IJPEDS)
This paper studies the voltage stability and power quality (PQ) of a 128 kW grid-connected photovoltaic (PV) system installed at a school in Al-Hamra, Oman, by using a MATLAB/Simulink model. An incremental conductance maximum power point tracking (MPPT) algorithm is used to control the duty cycle of a DC/DC boost converter and to keep the DC-link voltage almost constant at about 498 V for different solar irradiance levels. A rotating d-q control strategy is applied to the voltage source converter (VSC) to generate balanced three-phase currents with a high power factor while the PV system partly supplies an average 400 kW school load and the remaining power is taken from the local distribution network. Steady-state and transient simulations with real irradiance and temperature data are carried out to examine the system performance during sudden changes in irradiance, load, and grid conditions such as voltage sags. The results show that the proposed control scheme keeps the DC-link voltage stable, reduces overshoot during disturbances, and achieves good power quality at the point of common coupling, with THDi of about 1.45%. Although this work is based only on simulations, it confirms that the controller can operate robustly under different weather and operating conditions and can help the integration of solar PV into the Omani distribution network.
1 June 2026 in IOP Conference Series: Earth and Environmental Science
This paper presents a machine-learning forecasting study for an 11 kV feeder at Khaboorah substation in Oman. A total of 4,193 hourly current readings were collected via SCADA from eight distribution circuits between March and August 2025. Engineered predictors—multi-horizon lags (1–168 h), sliding-window statistics, and sinusoidal time encodings—were fed into four algorithms: XGBoost, LightGBM, Random Forest, and Ridge Regression. XGBoost achieved the best test-set performance (RMSE 6.827 A, R 2 0.8094, MAPE 3.25%). Sliding-window averages and the 24-hour lag dominated the feature rankings. A notable finding is the roughly 53% drop in feeder loading during Ramadan, highlighting how cultural rhythms shape electricity demand in Gulf countries.
1 November 2023 in Indonesian Journal of Electrical Engineering and Computer Science
This article presents an overview of the technical and financial feasibility analysis of integrating a photovoltaic (PV) source with the conventional power system to supply the auxiliary load at the Al Suwairah 33/11 kV primary substation (PSS) in Suhar, Sultanate of Oman. This study estimates the required electrical energy for the primary substation's auxiliary load. A method is implemented to utilize the available area in the primary substation for determining the solar photovoltaic system's capacity. PVSyst software is employed to determine the ideal system capacity. The proposed solar PV system's payback period and overall annual savings have been evaluated using a series of simulated analyses. The proposed PV can inject 172.5 MWh/year with an average performance ratio of 0.826. The economic evaluation by the photovoltaic system (PVSyst) considering the present auxiliary load at the Al Suwarah PSS has suggested a total payback period of 8.9 years which is quite feasible. The cost of power generated by the proposed system is 49.2% less than the cost of power supplied from the utility service provider.
In any transmission and distribution system- the performance of that system mainly depends on voltage regulation and efficiency. Hence for the better operation of the system, it is required to maintain constant voltage regulation with good power factor and low power loss throughout the feeder. This can be achieved by using various methods. Out of those, placement of a capacitor bank at the densely loaded areas is the best-proven method compared to any other method. This research work considered the feeder-5 of the Al-Uwainath primary substation which was suffering from low voltage–poor regulation- problems. Here in this research modeled and analyzed 3 different techniques for rehabilitation to this low voltage, poor regulation, and power factor problem and recommended the most efficient method out of the three methods. As a part of this project simulated the same conditions of the site after collecting the data of the feeder from the site by using ETAP software and checked the performance by calculating its voltage regulation, power losses, and power factor in all three 3 different methods and recommended the most efficient method of feeder-5 rehabilitation by comparing the results of three methods with the exciting system.