Based on the mathematical modeling and operational optimization studies of reverse osmosis (RO) and multistage flash (MSF) desalination, the structural optimization of the hybrid process was specially studied in this work with the consideration of reducing comprehensive expenses under given operational conditions. Firstly, according to the process mechanism and flowchart of the RO and MSF seawater desalination technologies, seven hybrid structures with different feed conditions were designed, and their connection equations were established for numerical calculation. Then, in order to evaluate the economic performance of the hybrid systems with different structures, the hourly average operational cost equations of RO and MSF processes were established and formulated as the comprehensive evaluation indicators. Next, with a given water production requirement, simulation calculations of the hybrid system with seven different structures were performed. The results show that the hybrid system with the fourth structure has the lowest operational cost of 4.6834 CNY/m3, and at the same time it has the lowest blowdown. However, if we take GOR or production water temperature as the target, the optimal structure of the hybrid system is the fifth or the seventh option. The obtained results are helpful in structural optimization of the hybrid system with aspects of operational cost reduction, maximum GOR, or minimizing the wastewater discharge.
Focusing on the problems of opaqueness and high energy consumption in coal-fired power plant wastewater recycling processes, this paper studies the simulation and operational optimization of coal-fired power plant wastewater treatment by taking a coal-fired power plant system in Inner Mongolia as an example. Firstly, based on the solution–diffusion theory, pressure drop, and osmotic concentration polarization, a mechanistic model equation for coal-fired power plant wastewater treatment is developed. Secondly, the equation fitness and equation parameters are calibrated to obtain an accurate model. Thirdly, the system is simulated and analyzed so as to obtain the influence and change trajectories of different feed flowrates, temperatures, pressures, and concentrations on various aspects of the system’s performance, such as water recovery rate, salt rejection rate, and so on. Finally, in order to reduce the operating cost of the system, an optimization analysis is carried out, with the lowest specific energy consumption and average daily operating cost as optimization goals, and the performance changes of the system before and after optimization under three different working conditions are compared. The results show that adopting the given optimal strategy can significantly reduce the system’s operational cost. This research is helpful for the digitization and low-carbon operation of coal-fired power plant wastewater treatment systems.
The operation of coal-fired power plants generates a large amount of wastewater. With the issuance of increasingly strict drainage standards, the cost of wastewater treatment is increasing, and the need to reduce the cost of wastewater treatment is becoming increasingly urgent. Thus, based on the principles of reverse osmosis (RO) and mechanical vapor recompression (MVR) in wastewater treatment, the operational optimization of an RO-MVR joint system was studied in this work with the consideration of reducing the operating costs of wastewater treatment under given operational conditions. Firstly, based on the basic principles of RO and MVR, corresponding mechanism models were established and their accuracy was verified. Then, an economic model of the RO-MVR joint system was established, with the goal of minimizing the water production unit price and daily operating costs of the joint system for optimization analysis. Finally, we analyzed the cost and water production performance of the RO-MVR joint system before and after optimization under different operating conditions. The results show that this optimization based on the RO-MVR joint system will reduce the unit price of water production to 3.16 CNY/m3, with the daily operating costs being decreased by 22% compared to before optimization. This result helps to reduce the cost of zero-discharge wastewater treatment in coal-fired power plants.