Huan Wang

Dr. Huan Wang

Sichuan Highway Design and Research Institute, Chengdu, Sichuan, China
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2020 in Automation in Construction
Verified
Journal Article
Closed access
XWXiaoming Wang
Xiaoming Wang
HWHuan Wang
Huan Wang
Yuan SunYuan Sun
Yuan Sun
XMXiangyuan Mao
Xiangyuan Mao
STShengpeng Tang
Shengpeng Tang

27 February 2024 in Structures
Verified
Journal Article
Closed access
DDDeyuan Deng
Deyuan Deng
JZJinhua Zou
Jinhua Zou
JCJianguo Cai
Jianguo Cai
ZCZhemming chen
Zhemming chen
HWHuan Wang
Huan Wang

19 June 2024 in Buildings
Verified
Journal Article
Open access
PDF file
LKLing Kang
Ling Kang
JXJinhua Xu
Jinhua Xu
TMTingmin Mu
Tingmin Mu
HWHuan Wang
Huan Wang
PZPing Zhao
Ping Zhao
Modern bridge construction towards a higher degree of low carbonization and assembly has been the general trend, while developing and broadening the low-carbon and assembled-oriented Accelerated Bridge Construction (ABC) technology can better realize the trade-offs between construction quality, efficiency, cost and sustainability. In the current mainstream ABC technologies such as precast-assembled concrete bridge and assembled steel bridge schemes, it is difficult to achieve an excellent balance between the above multicriterion trade-offs. To this end, this paper proposes a novel low-carbon and assembled composite bridge scheme as an innovative case of ABC technology based on a 26.7 km-length urban viaduct project in China with urgent environmental protection and assembly demands. Construction sustainability, the comprehensive economy and low-carbon performance are well balanced by the collaborative application of new steel–concrete composite structures, the rapid assembly interface design and low-carbon material technologies. The proposed scheme has been applied to a completed real-scale bridge, and the whole construction process only experienced 105 days of effective time, accompanied with slight environmental interference and construction noise and a small amount of labor and equipment input. In addition, the safety of the bridge, the rationality of the design concept and the calculation method have been verified by the static and dynamic loading tests of the real-scale bridge.

11 March 2022 in Structures
Verified
Journal Article
Closed access
XWXiaoming Wang
Xiaoming Wang
YWYichen Wang
Yichen Wang
PZPeng Zhu
Peng Zhu
XZXinmin Zhang
Xinmin Zhang
HWHuan Wang
Huan Wang
YHYaobei He
Yaobei He

26 April 2022 in Journal of Fuel Chemistry and Technology
Verified
Journal Article
Closed access
JKJiao Kong
Jiao Kong
HWHuan Wang
Huan Wang
YYYan-Xu Yu
Yan-Xu Yu
YCYa-Nan Chen
Ya-Nan Chen
MWMei-Jun Wang
Mei-Jun Wang
LCLiping Chang
Liping Chang

13 April 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YBYunteng Bai
Yunteng Bai
XWXiaoming Wang
Xiaoming Wang
XWXudong Wang
Xudong Wang
HWHuan Wang
Huan Wang
FNFREDERIC CHARDIN TCHUENTE NKO'O
FREDERIC CHARDIN TCHUENTE NKO'O
WWWentao Wu
Wentao Wu
Because the adjustment of the stay cable tension and girder counterweight is limited at the operation stage it is a difficult problem to control the negative reaction risk of the auxiliary pier (NRRAP) caused by multisource construction uncertainties and traffic growth. This paper proposes a pavement strategy optimization to control the NRRAP by adjusting the pavement thickness. The pavement strategy optimization is formulated as a reliability-constrained, multiobjective optimization problem, which is resolved by the nondominated sorting genetic algorithm (NSGA-II). A sensitivity analysis and a reliability analysis based on the generalized regression neural network (GRNN) surrogate model were performed to illustrate the significance of the uncertainty level in auxiliary pier negative reactions. The Pareto front examines the balance of construction cost, driving comfort and specified reliability threshold. The efficiency and accuracy of the proposed method are validated in a real cable-stayed bridge, and the results exhibit its advantages in controlling the NRRAP.