Fang Yang

Dr. Fang Yang


Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 April 2012 in International Journal of Control, Automation, and Systems
Verified
Journal Article
Closed access
PDF file
Xiongbo WanXiongbo Wan
Xiongbo Wan
HFHuajing Fang
Huajing Fang
Fang YangFang Yang
Fang Yang

1 February 2019 in Computers and Electronics in Agriculture
Verified
Journal Article
Closed access
PHPeijie Huo
Peijie Huo
Fang YangFang Yang
Fang Yang
HLHongbo Luo
Hongbo Luo
MZMingkuan Zhou
Mingkuan Zhou
YZYanlin Zhang
Yanlin Zhang

1 January 2023 in International Journal of Agricultural and Biological Engineering
Verified
Journal Article
Open access
PDF file
YJYihua Jiang
Yihua Jiang
Fang YangFang Yang
Fang Yang
ZZZihao Zhang
Zihao Zhang
SLShanjun Li
Shanjun Li
Development and tests of sliding contact line-powered track transporter

9 December 2025 in Agriculture
Verified
Journal Article
Open access
PDF file
YJYihua Jiang
Yihua Jiang
MZMin Zhou
Min Zhou
ZHZhiqiang He
Zhiqiang He
ZXZhaoji Xu
Zhaoji Xu
Fang YangFang Yang
Fang Yang
Efficient scheduling of automated rail transportation in hilly orchards is critical for maintaining fruit freshness and ensuring timely market delivery. This study develops a dynamic scheduling method for multi-transporter orchard rail systems through mathematical modeling, reinforcement learning algorithms, and field validation. We formulated a comprehensive scheduling model and designed four distinct frameworks to address randomly arriving tasks. In the optimal framework (Framework 3, which was chosen due to its hybrid strategy combining periodic global planning and local task point adjustment), we compared six rule-based heuristic algorithms against three reinforcement learning approaches: centralized SAC, decentralized MARL-DQN, and conventional DQN. Additionally, two emergency response strategies were developed and evaluated. Simulation experiments demonstrated that Framework 3 maintained high load factors while reducing task completion times. The centralized SAC algorithm outperformed other methods, achieving 1533.71 ± 50.09 reward points compared to 863.67 ± 30.54 for rule-based heuristics, a 77.6% improvement. For emergency tasks, Strategy 2 achieved faster response times with minimal disruption to routine operations. Field trials on a 153 m physical track with four autonomous transporters validated the DQN algorithm, confirming good sim-to-real consistency. This research provides a practical solution for dynamic scheduling challenges in hilly orchards, offering measurable efficiency improvements over traditional methods.