(1) Background: an assessment of the cost-effectiveness of employing an increased number of nurses with higher education from the perspective of the service provider. (2) Methods: Based on a year-long study results and data collected from a large hospital, we conducted of the costs of preventing one death. The study involved intervention by 10% increase in the percentage of nursing care hours provided by nurses with higher education. The measure of health effects was the cost of avoiding one death (CER). The cost-effectiveness analysis (CEA) was used as the evaluation method. (3) Results: The cost of employing a larger percentage of nurses with higher education amounts to a total of amounts to a USD 11,730.62 an increase of 3.02% as compared to the base costs. The estimated number of deaths that could be prevented was 44 deaths. Mortality per 1000 patient days was 9.42, mortality after intervention was 8.41. The cost of preventing one death by the 10% increase in BSN/MSN NCH percentage in non-surgical wards USD 263.92. (4) Conclusions: increasing the percentage of care hours provided by nurses with tertiary education is a cost-effective method of reducing in-hospital mortality.
Background: Readmissions are adverse, costly, and potentially preventable. The study aimed to evaluate the cost-effectiveness of reducing readmissions resulting from missed care, depending on the level of education of nurses, from the perspective of the service provider. Methods: We calculated missed care resulting in additional readmissions based on the longitudinal study conducted between 2012 and 2014, as well as readmissions that could have been potentially prevented by adding a 10% increase in hours of nursing care provided by BSN/MSc nurses for 2014. The cost-effectiveness analysis (CEA) was performed to calculate the cost-effectiveness of preventing one hospitalization in non-surgical and surgical wards by increasing the number of nursing hours provided by BSN/MSc nurses. Cost–benefit analysis (CBA) was performed, and the CBR (cost–benefit ratio) and BCR (benefit–cost ratio) were calculated. Results: Increasing the number of hours of nursing care (RN) by 10% decreased the chance for an unplanned readmission by 11%; (OR = 0.89; 95% CI: 0.78−1.01; p = 0.08) in non-surgical wards and 43% (OR = 0.57; 95% CI: 0.49−0.67; p < 0.001) in surgical wards. In non-surgical wards, the number of readmissions that were preventable with extra hours provided by BSN/MSc nurses was 52, and the cost-effectiveness ratio (CER) was USD 226.1. The number of preventable readmissions in surgical wards was 172, and the CER was USD 54.96. In non-surgical wards, the CBR was USD 0.07, while the BCR was USD 1.4. In surgical wards, the CBR was USD 0.02, and the BCR was USD 4.4. Conclusions: The results of these studies broaden the understanding of the relationship among nursing education, patient readmission, and the economic outcomes of hospital care. According to the authors, the proposed intervention has an economic justification. Hence, the authors recommend it for approval by the service provider.
Objectives: Falls are associated with increased morbidity, mortality, prolonged hospitalization and an increase in the cost of treatment in hospitals. They contribute to the deterioration of fitness and quality of life, especially among older patients, thus posing a serious social and economic problem. They increase the risk of premature death. Falls are adverse, costly, and potentially preventable. The aim of the study was to analyze the cost-effectiveness of avoiding one fall by nurse care provided by the nurses with higher education, from the perspective of the health service provider.Methods: The economic analysis included and compared only the cost of nurse intervention measured by the hours of care provided with higher education in non-surgical departments (40.5%) with higher time spend by nurses with higher education level an increase in the number of hours by 10% (50.5%) to avoid one fall. The time horizon for the study is 1 year (2021). Cost-effectiveness and Cost–benefit analysis were performed. All registered falls of all hospitalized patients were included in the study.Results: In the analyzed was based on the case control study where, 7,305 patients were hospitalized, which amounted to 41,762 patient care days. Care was provided by 100 nurses, including 40 nurses with bachelor’s degrees and nurses with Master of Science in Nursing. Increasing the hours number of high-educated nurses care by 10% in non-surgical departments decreased the chance for falls by 9%; however, this dependence was statistically insignificant (OR = 1.09; 95% CI: 0.72–1.65; p = 0.65). After the intervention (a 10% increase in Bachelor’s Degrees/Master of Science in Nursing hours), the number of additional Bachelor’s Degrees/Master of Science hours was 6100.5, and the cost was USD 7630.4. The intervention eliminated four falls. The cost of preventing one fall is CER = USD 1697.1.Conclusion: The results of these studies broaden the understanding of the relationship among nursing education, falls, and the economic outcomes of hospital care. According to the authors, the proposed intervention has an economic justification.
Background: The implementation of the Lean Hospitals concept can contribute to the improvement of internal processes in healthcare organizations. The level of a management team’s knowledge is an important part of effective implementation of Lean Hospital elements in hospitals. The purpose of this article is to determine the degree of theoretical and practical knowledge of Lean Hospitals (defined for the purposes of the study as a set of lean tools) among the management teams of Polish hospitals. The authors focused on examining the discrepancy between practical and theoretical knowledge to determine which of them is less prevalent in hospitals in order to correctly establish elements of the implementation procedures, which must be improved and perfected to more effectively implement the lean concept in healthcare. Methods: The research methods used to achieve the study objectives included, respectively, an analysis of the literature on the subject and gathering of data using the Qualtrics Platform with a CAWI survey. Respondents rated their level of knowledge regarding Lean Hospital tools on a Likert scale. Basic descriptive statistics and radar diagrams were used to analyze and present the data. Statistical analysis was performed using Excel spreadsheets. Results: It was established that the vast majority of management teams in the studied hospitals had limited basic knowledge about Lean Hospitals, if any. The greatest lack of knowledge was found in the field of practical (implementation) knowledge of Lean Hospital tools. The research found no significant discrepancy between the level of theoretical and practical knowledge at the level of general knowledge and detailed knowledge relating to the knowledge of individual lean tools. The standardized work tool was rated best in terms of self-assessing practical knowledge. The worst rated tools in terms of both theoretical and practical knowledge self-assessment were Kaizen, Kanban and TPM. Conclusions: The results of the conducted studies indicate a low level of knowledge and advancement in the implementation of the Lean Hospitals concept in selected Polish hospitals. Limited knowledge of the Lean Hospital concept was established for entire management teams. A low level of knowledge was noted in both theoretical and practical knowledge. Supplementing knowledge only at the theoretical level without taking care of the practical knowledge aspect may prolong the implementation procedure or stop it completely. Therefore, based on the result of the research, it can be concluded that the first stage of lean implementation in hospitals should focus on supplementing the knowledge and preparing the employees for work in a lean culture, diverting particular attention to the practical part of the training.
Background and Objectives: Integrated health services are health services that are managed and delivered in a way that ensures patients receive a continuum of health promotion, disease prevention, diagnosis, treatment, disease management, rehabilitation, and palliative care services at different levels and sites of care within the health system, and according to their needs, throughout their life course. Assessing the effectiveness of their implementation, the perspective of the process participant—the patient—is examined. There are three main types of patient-reported measures: PROM, PREM and HLS. PREM (patient-reported experience measure) is a tool that allows the objective measurement of the patient’s experience related to healthcare services, for instance, the timeliness of visits or receiving recommendations. The aim of this study was to evaluate the coordinated care experienced by patients (PREMs) before and after the introduction of coordinated care, using the JOP-POP tool as a key measure. Materials and Methods: This longitudinal study was conducted in two stages. The first stage concerned the joining of the coordinated care program by the entity in which the study was conducted; the study was repeated six months after joining coordinated care (CC). At each stage of the study, the study group included 40 patients. The Shapiro–Wilk test was used to verify the normality of the distribution of quantitative variables. For statistical analysis, the Wilcoxon test for paired samples was used to compare two ordinal dependent variables. For independent variables, the Mann–Whitney and the Kruskal–Wallis ANOVA by ranks tests were used, with a post hoc test of multiple comparisons of mean ranks. Results: A statistically significant relationship (p = 0.00157) was observed between the number of chronic diseases and health status assessment before inclusion in coordinated care. The patients’ responses showed statistically significant improvement 6 months after the introduction of coordinated care (CC). The improvement in assessment was related to the time physicians spent with patients. The greatest improvement over 6 months was achieved in coordination of care and the smallest improvement was noted in the approach to the patient. Conclusions: The JOP-POP tool may be useful in future studies to assess patients’ experiences with implementing coordinated care.