Harun Pirim

Dr. Harun Pirim

orcid

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2012 in Computers & Operations Research
Verified
Journal Article
Closed access
Harun PirimHarun Pirim
Harun Pirim
BEBurak Ekşioğlu
Burak Ekşioğlu
APAndy D. Perkins
Andy D. Perkins
ÇYÇetin Yüceer
Çetin Yüceer

1 September 2008
Verified
Book Chapter
Open access
PDF file
Harun PirimHarun Pirim
Harun Pirim
EBEngin Bayraktar
Engin Bayraktar
BEBurak Eksioglu
Burak Eksioglu
Tabu Search: A Comparative Study | InTechOpen, Published on: 2008-09-01. Authors: Harun Pirim, Engin Bayraktar and Burak Eksioglu

1 July 2015 in Computers in Biology and Medicine
Verified
Journal Article
Closed access
Harun PirimHarun Pirim
Harun Pirim
BEBurak Ekşioğlu
Burak Ekşioğlu
APAndy D. Perkins
Andy D. Perkins

7 May 2024 in Sustainable Energy, Grids and Networks
Verified
Journal Article
Closed access
MKMuhammad Kazim
Muhammad Kazim
Harun PirimHarun Pirim
Harun Pirim
SSShuomang Shi
Shuomang Shi
DWDi Wu
Di Wu

5 January 2018 in Journal of Optimization Theory and Applications
Verified
Journal Article
Closed access
PDF file
Harun PirimHarun Pirim
Harun Pirim
BEBurak Eksioglu
Burak Eksioglu
FGFred W. Glover
Fred W. Glover

3 September 2025 in iScience
Verified
Journal Article
Open access
MKMuhammad Kazim
Muhammad Kazim
Harun PirimHarun Pirim
Harun Pirim
CLChau Le
Chau Le
TLTrung Le
Trung Le
OYOm Prakash Yadav
Om Prakash Yadav
Unplanned power outages create major economic costs. To better predict and manage these events, we present a multilayer graph neural network (GNN) framework that captures spatial, short-term co-occurrence, and statistically enriched co-failure patterns using 7 years of Oklahoma Gas & Electric data from 347 substations. These relations are encoded with weighted graph convolutions and fused by attention into a unified representation. For predictive maintenance, the model flags substations requiring near-term intervention across 30-, 60-, and 180-day horizons, achieving a peak 30-day F1 score of 0.8935. The same representation supports resilience planning by clustering substations into eight risk groups, each with distinct incident rates and recovery times. The highest-risk group has over six times higher incident rates than the low-risk groups. Combining prediction and clustering in a single framework provides utilities with an integrated basis for scheduling maintenance, prioritizing inspections, and targeting grid-hardening investments to minimize outage impacts and enhance reliability.