In this paper, a kind of steel slag, concrete-filled double-skin steel tube (CFDST) T-joint is proposed to promote sustainable structural development. In order to examine the seismic performance of the steel slag CFDST T-joint, a series of hysteresis experiments were carried out on 4 CFDST T-joints with the main pipe under axial compression load and the brace pipe subjected to cyclic axial loading. The seismic performance of the CFDST T-joint was experimentally investigated in terms of the failure mode, load–displacement hysteresis relationship, stiffness degradation, energy dissipation and ductility. The effects of the hollow ratio and the steel slag concrete of the CFDST main pipe on the seismic performance of CFDST T-joint specimens were compared and analyzed. The experimental results show that the failure modes of the CFDST T-joint mainly included two kinds of failure, with those being main pipe fracture and joint area compression-bending failure. The seismic performance of the joints could be improved with a 12% ultimate bearing capacity and 54% ultimate deformation capacity with the hollow ratio of the CFDST main pipe increasing from 0 to 0.5. The seismic performance of the joints could be improved with a 54% ultimate deformation capacity by filling the steel slag concrete with a 0.5 hollow ratio.
Based on FLAC3D finite element analysis and field measurements, this paper studies the synchronous excavation of the deep foundation pit and the adjacent underground channel in the 17th section of the Beijing Metro Line 10 Phase II project. Due to the very tight schedule and deadline, an underground channel has been added between the double-arch tunnel and the deep foundation pit and excavated synchronously with the deep foundation pit. The minimum distance between the two excavations is 5 m. It was found that (1) the underground channel excavation destroys the intact structure of the soil around the channel and foundation pit on a larger scale, which affects the formation of soil arch behind the retaining pile and thus increases the lateral pile displacement, and the addition of anchor cables at the north and south sides of the foundation pit is not necessary; (2) if conditions permit, it is the safest to excavate the underground channel first and then the foundation pit; (3) the primary interaction spacing between the two adjacent excavations is the same depth as that of the foundation pit, and when the spacing increases to twice the depth of the foundation pit, there is basically no interaction; (4) compared with the solid and heavy soil, the adjacent existing underground channel is like a “hollow, elastic, light” tube and more sensitive to the foundation pit excavation, whose uplift and deformation rebound could exert a force on the surrounding soil and then enlarge the lateral displacement of the retaining pile.
Investigating the seismic behavior of precast concrete bridge piers is crucial in the design process due to the complex stress distribution in the connecting components. To demonstrate the seismic behavior of precast concrete bridge piers with hybrid joint connections, three bridge piers were designed with a scaling ratio of 1:8 and then tested under low cyclic loading conditions. The tests involved varying shapes of steel tube connection keys as parameters. This study involved examining failure modes and crack development, as well as analyzing the hysteretic performance, deformation capacity, energy dissipation, and stiffness degradation of the specimens. Furthermore, a finite element model was developed using ABAQUS, and the validity of the modeling approach suggested in this study was confirmed through tests. The results indicate that the precast piers exhibit reduced concrete damage at the joints. The enhanced strength of the joints is attributed to the incorporation of steel tube connection keys. The circular steel tube connection key integrated into the precast bridge pier offers a superior bearing capacity, energy dissipation, and stiffness degradation compared to the cross-shaped steel tube connection key. The presence of the built-in circular steel tube connection key in the precast bridge pier suggests that it complies with the seismic structural measures and is consistent with the design principle of “strong joint and weak member”.