When researching rock blasting, the design parameters typically used for analysis are the geometric and charging parameters. This study focuses on a different approach based on the effect of timing, specifically the role of delays in the initiation sequence. Data were obtained from the results of full-scale blasts. The experimental setting and location allowed us to consider all parameters, other than the number of delays, as constants. The experimental results were analyzed, relating the delay variables to the fragmentation and KPIs of downstream operations. It was found that increasing the number of delays per unit of blasted rock and reducing simultaneous adjacent holes produces finer fragmentation, reduces the amount of fines, facilitates secondary operations, and reduces the risk of flyrock.
This paper presents the results of the application of geophysical surveys to update the morphological model of a limestone and gneiss deposit of a mining company near the city of Taubaté, Brazil. The research began with a test to verify the accuracy of the geophysical survey method and it was conducted in the same area as a previous drilling campaign with the aim of confirming the possibility of using Vertical Electrical Sounding (VES) and induced polarization (IP) methods, in order to obtain the required information for the deposit morphological modeling. As a result, the application of geophysical methods in the study area reduced up to 75% the data collection time and presented similar accuracy levels as conventional exploration methods used for the same research objectives.